Letter Sequence Other |
---|
EPID:L-2022-LLA-0150, Application for Technical Specification Change and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) (Approved, Closed) EPID:L-2022-LLE-0030, International, Submittal of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
- Supplement, Supplement, Supplement
|
MONTHYEARML22050A0012022-02-18018 February 2022 International, Submittal of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Request ML22130A7052022-05-10010 May 2022 International - Resubmittal of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Request ML22161A0592022-06-0909 June 2022 International, Modification of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Request ML22161A0582022-06-0909 June 2022 International, Modification of License Amendment Request 9375-1 for the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Request ML22235A1142022-08-25025 August 2022 Letter - Request for Additional Information for the Review of the Atb 1T Package - 2022 Project stage: RAI ML22235A1132022-08-25025 August 2022 RAIs for the Model No. HI-STAR Atb 1T Package Project stage: Request ML22235A1152022-08-25025 August 2022 Enc - 9375 RAI 2022 Project stage: RAI ML22285A1152022-10-0707 October 2022, 12 October 2022 Application for Technical Specification Change and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Request ML22285A1222022-10-12012 October 2022 Attachment 5 to Enclosure 1: ANP-3947NP, Callaway Unit 1 License Amendment Request Inputs for Use of Framatome Fuel, Revision 3, Dated October 2022 Project stage: Request ML22285A1242022-10-12012 October 2022 Attachment 7 to Enclosure 1: ANP-3943NP, Callaway Small Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 Project stage: Request ULNRC-06768, Attachment 8 to Enclosure 1: ANP-3969NP, Callaway Non-LOCA Summary Report, Revision 2, Dated October 20222022-10-12012 October 2022 Attachment 8 to Enclosure 1: ANP-3969NP, Callaway Non-LOCA Summary Report, Revision 2, Dated October 2022 Project stage: Request ML22285A1232022-10-12012 October 2022 Attachment 6 to Enclosure 1: ANP-3944NP, Callaway Realistic Large Break LOCA Analysis with Gaia Fuel Design, Revision 1, Dated October 2022 Project stage: Request ML22287A1462022-10-14014 October 2022 Affidavit of Kimberly Manzione Project stage: Other ML22287A1382022-10-14014 October 2022 Responses to HI-STAR Atb 1T Requests for Additional Information Project stage: Request ML22287A1432022-10-14014 October 2022 Attachment 4 - Safety Analysis Report on the HI-STAR Atb 1T Non-Fuel Waste Transport System Project stage: Other ML22287A1412022-10-14014 October 2022 Attachment 2 - HI-STAR Atb 1T Amendment Request 1 RAI Responses Project stage: Other ML22287A1392022-10-14014 October 2022 Responses to HI-STAR Atb 1T Requests for Additional Information Project stage: Other ML22305A6042022-11-0101 November 2022 International - Supplemental Information for Responses to HI-STAR Atb 1T Requests for Additional Information Project stage: Supplement ML22335A4992022-11-16016 November 2022 Enclosure 1: Responses to Requested Information Project stage: Other ML22335A4972022-11-16016 November 2022, 1 December 2022 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Request ULNRC-06783, Enclosure 2: Affidavit for Withholding2022-11-16016 November 2022 Enclosure 2: Affidavit for Withholding Project stage: Other ML22335A5012022-11-16016 November 2022 Enclosure 3: ANP-4012NP, Revision 1, Callaway Rod Ejection Accident Analysis Project stage: Other ML22322A0062022-11-17017 November 2022 NRR E-mail Capture - Final - LIC-109 Acceptance Review (Unacceptable for Review with Opportunity to Supplement) Callaway - LAR for Proposed Changes to TS and Exemption Request Use of Framatome Gaia Fuel - L-2022-LLA-0150 & L-2022-LLE-0030 Project stage: Acceptance Review ML22335A4982022-12-0101 December 2022 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Supplement ML22343A2612022-12-0909 December 2022 International - Submittal of Final SAR for HI-STAR ATB-1T Amendment 1 Project stage: Other ML22334A2632022-12-13013 December 2022 Enclosure 1 - Certificate of Compliance Rev. No. 1 Project stage: Other ML22334A2612022-12-13013 December 2022 Certificate of Compliance No. 9375, Revision No. 1, for the Model No. HI-STAR ATB1T Package Project stage: Request ML22334A2622022-12-13013 December 2022 Cover letter- Certificate of Compliance No. 9375, Revision No. 1, for the Model No. HI-STAR ATB1T Package Project stage: Other ML22334A2642022-12-13013 December 2022 Enclosure 2 - Safety Evaluation Report Project stage: Approval ML22348A1162022-12-21021 December 2022 Acceptance of Requested Licensing Actions Application for License Amendment & Regulatory Exemptions for TS Change & Exemption Request Regarding Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150 & EPID L-2022-LLE-0030) Project stage: Acceptance Review ML23068A3772023-03-20020 March 2023 Regulatory Audit Plan and Setup of Online Reference Portal for License Amendment Request and Exemption for Fuel Transition to Framatome Gaia Fuel (EPID L-2022-LLA-0150 and EPID L-2022-LLE-0030) - Nonproprietary Project stage: Other ML23107A1812023-04-17017 April 2023 NRR E-mail Capture - Regulatory Audit Questions - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 Project stage: Approval ML23114A2302023-04-24024 April 2023 NRR E-mail Capture - Regulatory Audit Question - Callaway LAR and Exemption for Fuel Transition to Framatome Gaia Fuel - EPIDs - L-2022-LLA-0150 and L-2022-LLE-0030 Project stage: Approval ULNRC-06808, Affidavit2023-04-27027 April 2023 Affidavit Project stage: Other ML23129A7932023-04-27027 April 2023, 9 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) Project stage: Request ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) Project stage: Supplement ML23129A7972023-05-0909 May 2023 Response to Audit Questions Project stage: Other ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) Project stage: Request ULNRC-06829, Affidavit2023-08-0303 August 2023 Affidavit Project stage: Request ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Supplement ML23215A1962023-08-0303 August 2023, 31 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) Project stage: Request ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML23215A1992023-08-31031 August 2023 ANP-4012NP, Callaway, Unit 1, Rod Ejection Accident Analysis Revision 2, August 2023 Project stage: Request ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) Project stage: Other ML23234A1592023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material Project stage: Request ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) Project stage: Approval ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) Project stage: Approval ML23234A1532023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Exemption) Project stage: Approval ML23234A1542023-10-11011 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (FRN) Project stage: Approval 2022-08-25
[Table View] |
|
---|
Category:Audit Report
MONTHYEARML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) ML21238A1382021-09-14014 September 2021 Audit Summary for License Amendment Request and Regulatory Exemptions for a Risk-Informed Approach to Address GSI-191 and Respond to GL 2004-02 ML21139A0222021-06-0909 June 2021 Audit Summary for License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML18003B4192018-01-23023 January 2018 Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1: Seismic ML14042A2122014-02-18018 February 2014 Audit of the Licensee'S Management of Regulatory Commitments, Audit Performed November 18-20, 2013 ML13224A1952013-12-19019 December 2013 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML12180A0232012-08-0909 August 2012 Aging Management Programs Audit Report Regarding the Callaway Plant Unit 1 License Renewal Application ML12159A1542012-06-22022 June 2012 Summary of Site Audit Related to the Review of the License Renewal Application for Callaway Plant, Unit 1 (TAC Nos. ME7715 and ME7716) ML1035403822010-12-21021 December 2010 Audit of the Licensee'S Management of Regulatory Commitments, Audit Performed October 13-15, 2010 ML0727800022007-10-31031 October 2007 Audit Report of Licensee Regulatory Commitment Management Program for Audit Performed August 22-22, 2007 2024-01-12
[Table view] Category:Letter
MONTHYEARIR 05000483/20240032024-10-23023 October 2024 Integrated Inspection Report 05000483/2024003 IR 05000483/20240132024-10-21021 October 2024 Design Basis Assurance Inspection (Programs) Inspection Report 05000483/2024013 IR 05000483/20244012024-10-0909 October 2024 Material Control and Accounting Program Inspection Report 05000483/2024401 Public ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ML24247A3042024-09-11011 September 2024 Regulatory Audit Questions for License Renewal Commitments 34 and 35 (EPID L-2024-LRO-0009) - Non-Proprietary IR 05000483/20244032024-08-28028 August 2024 Security Baseline Inspection 05000483-2024-403 IR 05000483/20240052024-08-14014 August 2024 Updated Inspection Plan for Callaway Plant (Report 05000483/2024005) IR 05000483/20253012024-08-0505 August 2024 Notification of NRC Initial Operator Licensing Examination 05000483/2025301 ML24212A2822024-08-0202 August 2024 Regulatory Audit Summary Concerning Review of Request No. C3R-01 for Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections IR 05000483/20240022024-07-18018 July 2024 And Independent Spent Fuel Storage Installation Integrated Inspection Report 05000483/2024002 and 07201045/2024001 ML24185A1032024-07-16016 July 2024 2024 Biennial Problem Identification and Resolution Inspection Report ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ML24144A0492024-06-11011 June 2024 Requests for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML24158A5222024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ML24178A1132024-06-0606 June 2024 Ameren Missouris Intent to Adopt Revision 1 to Amendment 0 of Certificate of Compliance No. 1040 as Applicable to the ISFSI at the Callaway Plant Site ML24143A1632024-05-23023 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Storage Canister HGMPC0001 ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ML24137A2342024-05-16016 May 2024 Independent Spent Fuel Storage Installation - Registration of Dry Spent Fuel Storage Canister HGMPC0011 ML24122A1502024-05-0707 May 2024 Audit Plan to Support Review of Steam Generator License Renewal Response to Commitment Nos 34 and 35 ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 IR 05000483/20244022024-05-0606 May 2024 Security Baseline Inspection Report 05000483/2024402 (Full Report) IR 05000483/20240112024-05-0101 May 2024 NRC Post-Approval Site Inspection for License Renewal (Phase 2) Report 05000483/2024011 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ML24122A1132024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radioactive Effluent Release Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ML24108A1082024-04-17017 April 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0009 ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report IR 05000483/20240012024-04-16016 April 2024 Integrated Inspection Report 05000483/2024001 IR 05000483/20244042024-04-0909 April 2024 Cyber Security Inspection Report 05000483/2024404 ML24088A3212024-04-0101 April 2024 Notification of Commercial Grade Dedication Inspection (05000483/2024013) and Request for Information ML24086A5132024-03-26026 March 2024 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ML24079A1622024-03-19019 March 2024 Re Nuclear Property Insurance Reporting ML24066A1932024-03-0707 March 2024 2024 Callaway Plant Notification of Biennial Problem Identification and Resolution Inspection and Request for Information ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 IR 05000483/20230062024-02-28028 February 2024 Annual Assessment Letter for Callaway Plant Report 05000483/2023006 ML24052A3662024-02-26026 February 2024 Regulatory Audit Plan in Support of Proposed Alternative to ASME Code, Section XI Requirements for Containment Building Inspections ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ML24036A1712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0079 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) IR 05000483/20230042024-01-19019 January 2024 – Integrated Inspection Report 05000483/2023004 ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 2024-09-11
[Table view] |
Text
September 15, 2023
Mr. Fadi Diya Senior Vice President and Chief Nuclear Officer Ameren Missouri Callaway Energy Center 8315 County Road 459 Steedman, MO 65077
SUBJECT:
CALLAWAY PLANT, UNIT NO. 1 - REGULATORY AUDIT
SUMMARY
REGARDING LICENSE AMENDMENT AND REGULATORY EXEMPTION REQUESTS FOR FUEL TRANSITION TO FRAMATOME GAIA FUEL (EPIDS L-2022-LLA-0150 AND L-2022-LLE-0030)
Dear Mr. Diya:
By letter dated October 12, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22285A115), as supplem ented by letters dated December 1, 2022, May 9, 2023, June 21, 2023, and August 3, 2023 (ML22335A497, ML23129A793, ML23172A145, and ML23215A196, respectively), Union Electric Company, doing business as Ameren Missouri (the licensee), pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, Application for amendment of license, construction permit, or early site permit, requested an amendment and regulatory exemptions regarding the use of Framatome GAIA fuel for Callaway Plant, Unit No. 1 (Callaway).
The proposed amendment would revise the Callaway Technical Specifications to allow use of Framatome GAIA fuel with M5 as a fuel cladding material. Since the Framatome GAIA fuel will use M5 fuel rod cladding, a 10 CFR 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors, and 10 CFR Part 50, Appendix K, ECCS
[Emergency Core Cooling System] Evaluation Models, exemption request is included as part of this licensing amendment request (LAR).
To support its review of the LAR, the U.S. Nuclear Regulatory Commission (NRC) staff conducted a regulatory audit virtually us ing an online portal. The NRC staff requested information during the initial phase of the audit, which was uploaded to the online portal by the licensee, for NRC staffs review. The virtual regulatory audit meeting was held between the NRC staff and the licensee representatives from April 3-5, 2023, during which the NRC staff held discussions with the licensee. The audit was kept open to submit additional audit questions and to conduct follow-up audit discussions. The regulatory audit summary report is enclosed with this letter.
F. Diya
If you have any questions, please contact me at 301-415-8371 or via email at Mahesh.Chawla@nrc.gov.
Sincerely,
/RA/
Mahesh L. Chawla, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket No. 50-483
Enclosure:
Regulatory Audit Summary
cc: Listserv
REGULATORY AUDIT
SUMMARY
IN SUPPORT OF LICENSE AMENDMENT AND REGULATORY EXEMPTION
REQUESTS FOR FUEL TRANSITION TO FRAMATOME GAIA FUEL
UNION ELECTRIC COMPANY
CALLAWAY PLANT, UNIT NO. 1
DOCKET NO. 50-483
1.0 BACKGROUND
By letter dated October 12, 2022 (Agencywi de Documents Access and Management System (ADAMS) Accession No. ML22285A115), as supplemented by letters dated December 1, 2022, May 9, 2023, June 21, 2023, and August 3, 2023 (ML22335A497, ML23129A793, ML23172A145, and ML23215A196, respectively), Union Electric Company, doing business as Ameren Missouri (the licensee), pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 50.90, Application for amendment of license, construction permit, or early site permit, requested an amendment and regulatory exemptions regarding the use of Framatome GAIA fuel for Callaway Plant, Unit No. 1 (Callaway).
The proposed amendment would revise the Callaway Technical Specifications to allow use of Framatome GAIA fuel with M5 as a fuel cladding material. Since the Framatome GAIA fuel will use M5 fuel rod cladding, a 10 CFR 50.46, Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors, and 10 CFR Part 50, Appendix K, ECCS
[Emergency Core Cooling System] Evaluation Models, exemption request is included as part of this licensing amendment request (LAR). The info rmation submitted in support of the LAR is under final review in accordance with the Office of Nuclear Reactor Regulation (NRR) Office Instruction LIC-101, Revision 6, License Amendment Review Procedures (ML19248C539).
The U.S. Nuclear Regulatory Commission (NRC) staff conducted a regulatory audit in accordance with the NRR Office Instruction LIC-111, Regulatory Audits (ML19226A274). The regulatory audit is a planned license or regulation-related activity that includes the examination and evaluation of primarily non-docketed information. The regulatory audit is conducted with the intent to gain understanding, to verify information, and/or to identify information that will require docketing to support the basis of a licensing or regulatory decision. Performing a regulatory audit of the licensees information is expected to assist the NRC staff in efficiently conducting its review or gain insights on the licensees proc esses or procedures. Information that the NRC staff relies upon to make the safety determination must be submitted on the docket.
During the regulatory audit, the NRC staff reviewed documents, responses to audit questions, and held discussions with members of Ameren Missouri and its contractors. The purpose of the audit was to gain an understanding of the information needed to support the NRC staffs licensing decision regarding the LAR and to develop requests for additional information (RAIs).
However, the NRC staff may review supporting information retained as records under 10 CFR 50.71, Maintenance of records, making of reports, and/or 10 CFR 54.37, Additional records and recordkeeping requirements, which, although not required to be submitted as part
Enclosure
of the licensing action, would help the NRC st aff better understand the licensees submitted information.
2.0 AUDIT ACTIVITIES AND OBSERVATIONS
2.1 Desk and Virtual Audit
The desk audit was conducted by the NRC staff consistent with the regulatory audit plan dated March 20, 2023 (ML23068A377). The NRC staff provided the list of documents needed in the audit plan along with audit questions. The licensee uploaded the requested documents to an electronic portal and provided access to the NRC audit team. The NRC staff reviewed the documents during the desk-audit phase made available by the licensee in an electronic reading room.
The second phase of the audit was conducted virtually in meetings between the dates of April 3-5, 2023, and subsequent follow-up meetings. Detailed discussions were held on various topics between the audit team members and the licensee, aided by information needs identified by the NRC staff in the audit plan, as supplem ented, along with the licensees presentations and prepared responses to audit questions.
In addition, the NRC requested via emails dated April 17, 2023 (ML23107A181), and April 24, 2023 (ML23114A230), that responses be provided to additional questions discussed during a call held on April 20, 2023. At the conclusion of the audit activities, the NRC requested that the licensees responses to selected questions from the audit be transmitted via a letter, which was subsequently provided by the supplemental letter dated May 9, 2023. Following review of the responses provided in the supplement dated May 9, 2023, a call was held on June 8, 2023, during which the NRC staff requested that additional information be provided regarding four items, which was provided by the licensee in the supplemental [[letter::ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)|letter dated June 21, 2023]].
The NRC staff used the information gathered from the audit to determine whether additional information is warranted on the docket to support rendering of an NRC staff finding. The audit plan dated March 20, 2023, provides a list of the information that the NRC staff reviewed throughout the audit.
3.0 RESULTS OF THE AUDIT
The NRC staff did not make any regulatory decisions regarding the LAR during the audit. At the audit exit meeting held on April 5, 2023, and during subsequent meetings, the NRC staff reviewed the proposed resolution to the audit questions with the licensee, and reached a consensus regarding the questions, which were resolved and closed. The licensee provided the response to the remainder of the questions on the docket in the supplements dated May 9, 2023, and June 21, 2023. After reviewing the supplemented information, the NRC staff has not identified the need for any RAI.
List of Participants
U.S Nuclear Regulatory Commission (NRC) Audit Team
NRC Staff Role Mahesh Chawla Project Manager, NRR 1/DORL2/LPL43 Ahsan Sallman Senior Nuclear Engineer, NRR/DSS 4/SNSB5 Santosh Bhatt Nuclear Engineer, NRR/DSS/SNSB Mathew Panicker Nuclear Engineer, NRR/DSS/SFNB 6 Ravi Grover Safety and Plant Systems Engineer, NRR/DSS/STSB 7 Gerry Stirewalt Senior Environmental Project Manager, NMSS 8/REFS9/ERNB10 Donald Palmrose Senior Reactor Engineer, NMSS/REFS/ERNB
Ameren Missouri - Callaway Plant, Unit 1 (Callaway) Team
Thomas Elwood - Supervisor, Licensing and Regulatory Affairs Thomas Forland - Licensing Engineer Brian Richardson - Supervisor, Reactor Engineering and Safety Analysis James Knaup - Reactor Engineer Justen Vinyard - Reactor Engineer Chris Ehmke - Reactor Engineer Jonathan Cordz - Safety Analysis Engineer Kurt Linsenbardt - Safety Analysis Engineer Larry Russell - Project Manager, consultant James McInvale - Reactor Engineering consultant Donald Rickard - Licensing consultant Garry Chapman - Engineering consultant
Framatome personnel include:
Rick Williamson - Contract Manager Tom Gardner - Project Manager Morris Byram - Licensing/Reg Affairs John Adams - Safety Analysis Supervisor Tim Lindquist - Safety Analysis Engineer Jackson Breakell - TH Engineer Mike Bingham - TH Engineer Brittany Williams - LOCA Engineer Nathan Hottle - LOCA Supervisor Mirielle Cortes - LOCA Engineer Mike Aldrich - Fuel Performance (Thermal-Mechanics) Engineer
1 Office of Nuclear Reactor Regulation (NRR) 2 Division of Operating Reactor Licensing (DORL) 3 Plant Licensing Branch IV 4 Division of Safety Systems 5 Nuclear Systems Performance Branch 6 Nuclear Methods and Fuel Analysis Branch 7 Technical Specifications Branch 8 Office of Nuclear Material Safety and Safeguards 9 Division of Rulemaking, Envi ronmental, and Financial Support 10 Environmental New Reactor Branch
Michael Harris - Fuel Performance (T-M) Engineer Brian Painter - Structural Mechanics Engineer Dan Colleran - Structural Mechanics Supervisor Kevin Roberts - Neutronics Engineer Kevin Segard - Neutronics Engineer Michelle Guzzardo - Neutronics Supervisor Graeme Leitch - Mechanical Design Engineer
ML23206A199 *by email OFFICE NRR/DORL/LPL4/PM NRR/DORL/LPL4/LA NRR/DSS/SFNB/BC NAME MChawla PBlechman SKrepel DATE 08/01/2023 07/27/2023 08/10/2023 OFFICE NRR/DSS/SNSB/BC* NRR/DSS/STSB/BC* NRR/DRO/IQVB/BC*
NAME PSahd VCusumano KKavanagh DATE 08/01/2023 08/10/2023 08/04/2023 OFFICE NMSS/REFS/ERNRB/BC* NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM*
NAME JOHara (for K Erwin) JDixon-Herrity MChawla DATE 08/02/2023 09/15/2023 09/15/2023