Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a
ML23165A242
Person / Time
Site: Callaway Ameren icon.png
Issue date: 06/14/2023
From: Witt T
Ameren Missouri, Union Electric Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML23165A241 List:
References
ULNRC-06822
Download: ML23165A242 (1)


Text

Ameren MISSOURI Callaway Plant June 14, 2023 ULNRC-06822 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 10 CFR 50.54(a)(4)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPf-30 ADDITIONAL INFORMATION REGARDING REQUEST FOR NRC APPROVAL OF OPERATING QUALITY ASSURANCE MANUAL (OQAM) REVISION 36a

Reference:

Ameren Missouri letter ULNRC-068 1 5, Request for NRC Approval of Operating Quality Assurance Manual (OQAM) Revision 36a, dated June 1, 2023 (ADAMS Accession No. ML23156A670)

By the letter identified above, Ameren Missouri (Union Electric) transmitted a request to approve a change to the Operating Quality Assurance Program described in the Operating Quality Assurance Manual (OQAM) for the Callaway Plant. As noted in the letter, the need for the request was confirmed in a phone call with the NRC in December 2022. In that phone call, it was noted that changes to the Final Safety Analysis Report (FSAR) were being made in connection with the OQAM change.

From initial review of Ameren Missouris request, the NRC staff has determined that review of the FSAR changes would facilitate processing ofthe requested OQAM change. Therefore, in response to that determination, the FSAR changes are hereby provided as an attachment to this letter.

This letter does not contain new commitments.

If there are any questions, please contact Hrach Minassian, NOS Audit Supervisor, at (573) 220-9213.

$3 15 County Road 459 : Steedrrian, si1 65077 : Arrierenl\Iissouri.corri

ULNRC-06822 June 14, 2023 Page 2 of 4 I declare under penalty ofperjury that the foregoing is true and correct.

Sincerely, Todd A. Witt Manager, Regulatory Affairs Executed on: O/ Z3

Attachment:

FSAR Markup for FSAR Site Addendum (SA) sections 1 3 1 .3 1 1 3 1 .3 1 1 8, and 13.1.3.1.19

ULNRCO6822 June 14, 2023 Page 3 of 4 cc: Mr. Robert Lewis Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Director Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. M. Chawla Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O8B1A Washington, DC 20555-0001

ULNRC-06822 June 14, 2023 Page 4 of 4 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 6500 West Freeway, Suite 400 FortWorth,TX 76116 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

F. M. Diya K. C. Scoff W. A. Wiff D. E. Farnsworth S.G. Kovaleski B. L. Jungmann T. A. Witt T. B. Elwood NSRB Secretary STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)

Ms. Kathleen McNelis (Public Service Commission)

Ms. Claire Eubanks (Public Service Commission)