PROCEDURE REVIEW FORM (PRF) 1.0 Initiation Initiator: James Reed Date: 10/26/2023 Procedure Dept:

EP Document#: EIP-ZZ-COOlO ADDENDUM B New Rev.#

010 (3 digits required)

Title:

Protective Measures Coordinator Checklist Level of Use:

Continuous Reference

~lnfonnation 0Multiple NIA 2.0 Reason for Change/Description of Change (Lisi commitments, CRs, eB Change Requests, OERs, Plant Mods etc. and record numbers here.)

CR 202306515. Revised Operation Step 3 Note, "30 minutes to 60 minutes" See SOC for details Continued: 0 3.0. Document Disposition 0Temp Change 0New Document 0Major Revision

[8JMinor Revision Ocancellation Administrative Correction Dept. Head or Designated Approver required for Administrative Corrections (Si2nature/PIN/Date)- no other signatures rcauired 4.0 Interim Approval (Temp. Change Only)

Temp. Change #:

Expiration Date:

Cognizant Supervisor (Signature/PIN/Date)

SRO (Signature/PIN/Date)

5.0 Comments

Continued: D 6.0 Reviews and Signatures (NOT required for Administrative Corrections)

Revh>ws Re(lu/re,t Dent PIN Signature Date CA0/39 Attached Preparer 0

1t~q07

()vu,'- f'e-vl/V LOl-31/ol-Technical Review tf

\\'1(,\\.~)

~,-,.. (/ \\

H-~J),)

D Yes fit'No Technical Review ~?

\\..L/

,,r:.,,

~

0Yes 8rNo rt586 C

1/-(J<].1.,'3 Add' I Review

~

0Yes 0No Add'I Review 0Yes 0No Additional Reviews (See Attached CAO 13 9 forms).

Number of additional CA0l39s:

Validation I

Tvoe Coordinator - PIN I

Si2nature Date CA0139 Attached I

I 0Yes No 50.59 Review 18iCA2510 0CA2511 0CA2512 / ON/A (perAPA-ZZ-00143)

Screener Initial IP IN Reviewer 111/ttal I PIN (Dept. Head or Designated Approver) Is a Change Management Plan required? OYes ~No (IF YES, attach CAl.773 or CA2774)

Is a Cross-Disciplinary review required? OYes ~No 7.0 Approval (Either approval must be qualified as PATIAPVR or PATIGAPR in Qua/Master) 181 Senior Director Nuclear Operations Approval (per APA-ZZ-00101) [8J ORC is required in accordance with APA-ZZ-00091

[8] Depart<3J5ent

~ du:*nal Review and Approval

  • /L"JTi 11/4-r/~~2.1 Dept. Head or Designated Approver (Signature/PIN/Date)

Note: Page 2 provides inslrnctions to complete this/arm and may be discarded A190.0001, 2, 5, 35 -A210.0062, 65, 69; Ml90.0001 Page I of2 APA-ZZ-00101 ORC Meeting: tE~

t,f}~,,1-.1~ o3f/6,~-?-;lJ Senior Director Nuclear Operations (Signature/PIN/Date)

CA0033 Rev. 002

Address the questions below for all aspects of the activity. If the answer is YES for any portion of the activity, apply the identified procedures to that portion of the activity. Note that it is not unusual to have more than one process apply to a given activity. Refer to Section 4 of the 10 CFR 50.59 Resource Manual (RM) and the instructions on pages 5-6 for additional guidance.

I.

Activity/Document Number: EIP-ZZ-C00IO Addendum B

Title:

Protective Measures Coordinator Checklist Brief Description of activity (what is being changed and why):

Revision Number:_0.:.cl:....;0 __

CR202306515 revised Operations section step 3 - time requirement for follow-up notifications changed from 30 to 60 minutes.

II.

Does the proposed activity fall within the scope of an activity that has been previously approved by the NRC or for which a 50.59/72.48 Screen or evaluation has already been performed?

(See Section 4.2 of the RM.)

III.

Does the proposed ~ti~ity involve a change to the:

1. Technical Specifications or the Renewed Operating License? (See 10 CFR 50.90.)
2. Quality Assurance Plan? (See 10 CFR 50.54(a).)
3. Security Plan which also includes the Cyber Security Plan?

(See 10 CFR 50.54(p).)

4. Radiological Emergency Response Plan (RERP) or Emergency Action Levels (EALS)? (See 10 CFR 50.54(q).)

Note: If your proposed change alters a RERP implementing procedure [any EIP-ZZ-XXXX], equipment identified as important to emergency response [ refer to KDP-ZZ-00013], or could alter response time, staffing, or other items covered in the 16 Planning Standards or in Appendix E to Part 50.47(b) [refer to KDP-ZZ-00400],

answer this question YES.

APA-ZZ-00143 Al 70.0010 Page 1

Response

IZ!NO YES

Response

IZ!NO YES

[8JNO YES

[8JNO YES ONO IZI YES IfYES, no further 50.59 (or 72.48) review beyond this Applicability Determination (AD) is required, but complete the remainder of this form.

Identify the applicable 50.59/72.48 Evaluation Log No., License Amendment No., or applicable document number.

Document#

See Section 4.2.1 of the RM.

IfYES, process per APA-ZZ-00108 and FDP-ZZ-00103.

IfYES, process per APA-ZZ-00108 and GDP-ZZ-00600 and related facility or procedure change programs.

IfYES, process per APA-ZZ-00108 and SOP-ZZ-00030 for Security Plan and related facility or procedure change programs.

IfYES, process per APA-ZZ-00108 and KDP-ZZ-00400 for RERP and related facility or procedure change programs.

CA2510 Rev.005

.!- -:-.:.--=-:.,- *-.-, ' --~:- --- -- - - --

.. :.... ~~.. ~*---~ :~------ --- -.. (-:~*-\\~::~~i:::.:.~=~)

5. IST Program Plan? (See 10 CFR 50.55a(t).)
6. ISI Program Plan? (See 10 CFR 50.55a(g).)
7. Fire Protection Program? (See Operating License Condition 2.C(S).)
8. Storage Cask Certificate of Compliance (CoC), including appendices? (See 10 CFR 72.244.)
9. Does the proposed activity impact other programs (e.g.,

the ODCM) that are controlled by regulations, the Operating License (including Orders and License Conditions) or the Technical Specifications? (See Section 4.2.1 of the RM.)

IV. Does the orooosed activitv involve:

1. Maintenance which restores SSCs to their original (as designed) condition? (See 10 CFR 50.65(a)(4).)

~NO YES

~NO YES

~NO YES If'./~~: p::-,J,:~.:-).-~:..-~'_;\\-ZZ-JU355 ~\\):*

_i\\S~:lE co~ie c(::.:-.-1_?!:~.:;.cc ~::::d r-::}=.:c(l f::icility or pro::edure ch::mge programs.

IfYES, process per EDP-ZZ-01003 for ASME code compliance and related facility or procedure change programs.

See FP Screening questions in EDP-ZZ-04044. If any of the screening questions are answered YES, a Fire Protection review is needed in accordance with EDP-ZZ-04044.

IF YES, then contact Regulatory

~ NO O YES Affairs/Licensing to determine next steps.

IfYES, indicate the applicable

~ NO O YES program in Brief Description Section.

Resoonse See Section 4.2.2 of the RM lfYES, process change per

~NO YES Note: If the maintenance is on ISFSI or cask-related items, AP A-ZZ-00101 for procedure changes or AP A-ZZ-00320/330/340 for Maintenance activities.

the Maintenance Rule does NOT apply, and the activity is subject to a 10 CFR 72.48 Screen on a CA3145.

2. A temporary alteration (to procedures or the facility) supporting maintenance (T ASM) that will be in effect during at-power operations for 90 days or less?

APA-ZZ-00143 A170.0010 Page2 181NO YES IfYES, process per APA-ZZ-00101 for procedure changes or AP A-ZZ-00605 for facility changes or Procedurally Controlled Temporary Modifications or MDP-ZZ-FS00l for Freeze Seals.

Evaluate risk using AP A-ZZ-00315, Appendix.A.

CA2510 Rev. 005

VI.

i. FSAT.:.. ~

i*~O LJ YES If the above response is NO, check NIA in the Response column at right.

If the above response is YES, does the proposed activity involve an FSAR change that may be excluded from the requirement to perform a 50.59-Screen/Evaluation by NEI 96-07 or NEI 98- 03? (Provide a YES or NO response to this question in the Response column at right.)

Note: In lieu of the exclusion criteria of RM Section 4.2.3, a YES response may also be provided if the FSAR change requires no further 50.59 review based on a YES resp~ns~ to the question in Section II of this Applicability Determmatlon form.)

2. Technical Specification Bases? [2l NO DYES If the above response is NO, check N/ A in the Response column at right.

If the above response is YES, does the proposed activity involve a TS Bases change comparable to that which may be excluded from the requirement to perform a 50.59 Screen/Evaluation by NEI 96-07 or NEI 98-03 (as described for an FSAR change)? (Provide a YES or NO response to this question in the Response column at right.)

Note: In lieu of the exclusion criteria of RM Section 4.2.3, a YES response may also be provided if the TS Bases change requires no further 50.59 review based on a YES response to the question in Section II of this Applicability Determination form.)

Does the proposed~tivitv involve a chan,ze to:

1. Managerial or administrative procedures, controls, or activities (including software used only for the implementation of administrative procedures, controls, or activities) governing the conduct of facility operations (subject to the control of 10CFR50. Aooendix B)?

---2-. Regulatory commitment not covered by another regulation ba_s_ed_ chang~rocess? (See NEI 99-04.)

VII. Does the proposed activity potentially affect the design, operation, or maintenance of the ISFSI facility as described in the dry cask storage FSAR or the 72.212 Report? (See FDP-ZZ-00105 and Attachment I of APA-ZZ-00143.)

APA-ZZ-00143 A170.0010 Page3

~,._*=;~: ::~:**.

ONO YES

[2l N/A 0NO YES

[2l N/A Resoonse APA-ZZ-00103 mid FDJJ-ZZ-0Qi03 for revising License Documents.

Note:

A NO response in the Response column at left means that the FSAR/TS Bases change is one that requires further 50.59 review (i.e., is not excludable from further review).

A YES response means that the FSAR does NOT require further 50.59 review.

Process the TS Bases change per AP A-ZZ-00 l 08 and FDP-ZZ-00103 for revising License Documents.

Note:

A NO response in the Response column at left means that the TS Bases change is one that requires further 50.59 review (i.e., is not excludable from further review).

A YES response means that the TS Bases Change does NOT require further 50.59 review.

See Section 4.2.4 / 4.2.6 of the RM.

l'vl NO YES IfYES, process per APA-ZZ-00101

~

or APA-ZZ-00109.

l'vl NO YES IfYES, process per

~

APA-ZZ-00540.

[2]NO YES IfYES, perform a 72.48 Screen per APA-ZZ-00143 unless the change is completely covered by the response to Section II.

Note:

Editorial or administrative changes are excluded from the requirement to perform a 72.48 Review.

CA2510 Rev.005

The chai:ge for i:o~i~icatio:1 follow fr;:;quency from 30 to GO minutes is controlled folly by 10CFRS0.54(q) as controlled by KDP-ZZ-00400. Therefore 1 0CFR 50.59 assessment is not required.

IX.

Conclusion:

~ All aspects of the activity are controlled by one or more of the procedures above, therefore a 50.59 Screen is not required.

0 A portion of the activity is not controlled by one or more of the procedures above, therefore a 50.59 Screen IB required.

X. Signoffs:

Qualified Preparer: ~Jo::-=s7e:r:h~ Fo::'.!rtm

~ an

==--

~~fi~.,.£-~.
::::...(...-:::"."'=-::~:-I---J.J,,L....!tt,~ Date: _jJ_J _aiJ ~

(Print name)

Qualified Reviewer: _*-.!.:11_"";_lo

--::.!kv

~..:..

_ _,,:;,;;,,L-Jf.p!.~ci._----~'+-LU-=t __ Date: _!_!_; JlJ ?3 (Print name)

(Sign/PIN)

Ensure that once signed, this record is loaded into EB with the Activity/Document Number listed above or submit this form to either the Regulatory Affairs clerk or another member of Administration in accordance with APA-ZZ-00220.

APA-ZZ-00143 Al 70.0010 Page4 CA2510 Rev.005

50.54( q) Screening Form Document#, Rev#, &

Title:

EIP-ZZ-C00lO Addendum B, Rev 010, Protective Measures Coordinator Checklist EP Tracking#:..c2;;;;..0;;.;;2;;.;;3;..;;0-'4..c.0 _______ _

Activity Description and

References:

All the changes listed below are based offCR#202306515.

Operation Step 3 Note changed time for follow up notification from 30 minutes to 60 minutes.

,'I".".:;A.. \\Jt.)G.l

\\\\w11-)J Activity Scope:

YES NO Does this activity revise the Radiological Emergency Response Plan (RERP) or fmolementimz Procedures?........................ ~ D Change Type:

YES NO Is this activity editorial or typographical?......................................................................................................................................................... D 181 Previously Approved Change:

YES NO Is this activity being processed to conform to a previously approved activity?.................................................................................. ~ D If YES, what is the previously approved activity? Amendment 231 (ML2236 LA070)

Planning Standard Determination:

Does this activity impact any of the 50.47(b) Planning Standards or Part 50 Appendix E:

YES 50.47(b)(l) -Assignment of Responsibility (Organization Control)?.................................................................................. D 50.47(b)(2)- Onsite Emergency Organization?........................................................................................................................... D 50.47(b)(3)- Emergency Response Support and Resources?......................................... _....................................................... D 50.47(b)(4)- Emergency Classification System?........................................................................................................................ D 50.47(b)(5)- Notification Methods and Procedures?................................................................................................. *-************ D 50.47(b)(6)- Emergency Communications?............... u................................................................................................................ D 50.47(b)(7)- Public Education and Information?................................................................................................,....................... D 50.47(b)(8)- Emergency Facility and Equipment?..................................................................................................................... D 50.47(b)(9)- Accident Assessment?................................................................................................................................................ D 50.47(b)(l0)- Protective Response?.............................................................................................................,..,............................... D 50.47(b)(l l)- Radiological Exposure Control?........................................................................................................................... D 50.47(b)(12)- Medical and Public Health Support?...................................................................................................................

50.47(bXI3)- Recovery Planning and Post Accident Operations?....................................................................................... D 50.47(b)(14) - Drills and Exercises?................................................................................,................................................ -............. D 50.47(b)(15)

  • Emergency Responder Training?......................................................................................................................... D 50.47(b)(l6)- Emergency Plan Maintenance?........................-................................................................-................................... D Part 50 Appendix E?............................................................................................................................................................................

Commitment Impact Determination:

YES Does this activity impact a Site Specific EP Commitment not associated with a Planning Standard or Element?................ D If "Yes", record the Commitment number:

Explanation of Determination: (Enter an explanation to each determination-answer that needs clarification.)

Operation Step 3 Note changed time for follow up notification from 30 minutes to 60 minutes per the U.S.

NO 181 181 181 181 181 181 181 181 181 181 181 IZI 181 181 IZI IZI

)(J""

NO 181 Nuclear Regulatory Commission issuance of Amendment No. 231 to Renewed Facility Operating License No.

NPF-30 for Callaway Plant, Unit No. 1 on February 24, 2023 (ML22361A070). The amendment consists of changes to the Radiological Emergency Response Plan (RERP) in response to the application dated February 8, 2022, as supplemented by letter dated July 13, 2022. The amendment revises the RERP to make the following changes:

1.Extend the State and counties "follow-up" notification goal from 30 minutes to 60 minutes and allow for even further increases when conditions are stable, with the agreement of the State of Missouri and local counties. CR 202200483-001 Based on the above a evaluation per 1 0.CFR.50.54 (q) is not required.

File# A210.0038 KDP-ZZ-00400 Page 1 of2 CA1523 Rev. 002

50.54( q) Screening Form Screening Evaluation Results:

Based on the results of the information above, can the activity be implemented without performing a YES NO full 50.54(q) Effectiveness Evaluation?.......................................................................................................................................... ~ D Review/ Approval:

Preparer (Sign/PIN):.......... -;~~~,:.:.~~~~~S~Si;:;:;:-::f;./~<f.5::S:~8,~'$~--

763 <?0 Reviewer (Sign/PIN):....... _..::::::;;;1,:::::... _ __,,~~= =¥:.::-.,.._....J.~---:....::::.:=..:...::_ ___ _

Response Coordinator.

Emerll;ency Preparedness M File# A210.0038 KDP-ZZ-00400 G.34il Page2 of2 Date: I I 3 ').o;;3 CA1523 Rev.002