Enclosure 1 to U LN RC-06654 Callaway Unit 1 Presentation Information for Planned Pre-Application Meeting (Public Meeting)
b%W
,t iIaway VQPPre-S Ubmittal Meeting
Ameren Callaway MISSOURI Energy Center cawa VQP Pre-Submittal Meethig Stephanie Banker - Ameren - Vice President Nuclear Engineering & Support
. Welcome
. Meeting Purpose to provide the NRC with information on the Vendor Qualification Program (VQP) of Framatome as a supplier of nuclear fuel to Callaway Energy Center
. Desired Outcomes to solicit questions I comments and gain insight from the NRC regarding the VQP information presented.
I 9
t
Stephanie Banker Steve Meyer Tom Elwood Jim Little Don Rickard Brian Richardson Jim Knaup Justin Vinyard Jim Mcinvale Rick Williamson Tom Gardner Christy White Greg Borza Morris Byram Jerry Hoim Kevin Segard Philippe Bellanger Tom George Gordo Wissinger Pam Reed Brian Painter Contract Manager Project Manager Technical PM Thermal-Hydraulics Licensing Licensing Neutronics Thermal-Mechanics Safety Analysis LOCA Analysis Mechanical Design Mechanical Analysis Team Members Presenters in Bold Ameren Team Titles Members WAmerell Callaway MISSOURI Energy Center
. Framatome I Titles Team Members j Vice President Nuclear Engineering &
Support Manager, Regulatory Affairs Supervising Engineer, Regulatory Affairs Regulatory Affairs Engineer RegulatoryAffairs Engineer Supervising Engineer, Reactor Engineering I Safety Analysis I Fuels Reactor Engineer I Core Design Reactor Engineer I Fuels Consultant Reactor Engineer
Agenda
. Purpose of Meeting I Desired Outcomes
. Background
. GAlA Fuel Assembly Design Description
. GAlA Experience
. Analyses
. Summary of NRC Approved Methods
. Technical Specification Changes
. Schedule Callaway Callaway Framatome Framatome Framatome Framatome Callaway Callaway Ameren Callaway MISSOURI Energy Center
Backriround Ameren Callaway MISSOURI Energy Center
. Callaway LEA I VQP Program for Framatome Fuel Lead Fuel Assemblies (LFA) 4 Fuel Assemblies 3 cycles starting in Cycle 25 e
Non-UmWng OperaUon Vendor Qualification Program (VOP)
Fuel Transition LIcensing Submittal VQP Lead Fuel Assemblies 4 Fuel Assemblies 3 cycles starting in Cycle 27 Fully Licensed Operation
. GAlA Fuel Design
. Based on currently approved methods (with some changes)
. Technical Specification changes to add Framatome methods
Fuel Assembly Design Description Ameren cailaway (ANP-10342P-A Revision 0, GAlA Fuel Assembly Mechanical Design)
MISSOURI Energy Center
. Standard Reconstitutable Top Nozzle
. M5 Fuel Rods t :41T1r
. M5 GAlA Mixing Grid (6x)
. M5 Intermediate GAlA Mixer (1GM) Grids (3x)
. Alloy 718 HMP Top (Relaxed) and Bottom Spacer Grids
. Q12 MONOBLOC Guide Tubes (24x)
. Q12 InstrumentTube
. GRIP Bottom Nozzle
Operating Experience (GAlA 12 ft. Design)
Amerell Callaway MISSOURI Energy Center I
LTAs have successfully completed failure-free performance in US and European reactors.
Plant (Year)
Cycle Length us Plant (201 52O1 9) 3x I 8month cycles Europe Plant (2012-2017) 5x 12-month cycles In the US, GAlA fuel assemblies in batch quantity will be in operation in 2021, as will GAlA LFAs at Callaway. GAlA LFAs with EATF features are in operation at another US Plant since 2019.
Callaway LFAs (4)
Begin operation in Cycle 25, 3 cycles Callaway VQP LFAs (4)
Begin operation in Cycle 27, 3 cycles In Europe, GAlA fuel assemblies in batch quantity are in their first cycle of operation at two plants.
VQP Analyses Ameren Callaway J
MISSOURI Enerçy Center
. Fuel rod thermal-mechanical
. Fuel assembly mechanical
. Neutronics
. Thermal-hydraulics
. Non-LOCA Rod Ejection Analysis Method meets new RG I P236
. LOCA
gre.
Summary of Methods (1 of 2)
Ameren MISSOURI Functional Area I Topical Report COBRA-FLX (ANP-1 031 1 P-A Revision I)
Non-LOCA S-RELAP5 (EMF-231 OP-A Revision I)
GAlA (ANP-10341P-A)
AREA (ANP-10338P-A)
GALILEO (ANP-10323P-A)
S-RELAP5 (EMF-2328P-Aand SIP-A)
S-RELAP5 (EMF-2103P-A Revision 3)
Neutronics Callaway Enerq Center ARCADIA (ANP-I 0297 Supplement I P-A fl Revision I)
ThermalHydraulic Power Distribution Control PDC-3 (ANF-88-054P-A)
XCOBRA-I1IC (XN-NF-82-21 P-A and XN-NF 3 c 75-21 P-A Revision 2),
DNBR Correlation i:;e Control Rod Ejection SB LOCA LB LOCA I
Summary of Methods (2 of 2)
Functional Area Topical Report rAmeren Callaway MISSOURI Energy Center COPERNIC (BAW-1 0231 P-A),
4 CROV (BAW-10084PA Revision 3)
AN P-I 0337P-A and Supplement I P-A Fuel Performance Code External Loads GAlA Mechanical Design Cladding Statistical Setpoints Fuel Rod Bow DNB Propagation ANP-1 0342P-A
BAW-1O%4OPA, BAW-10227P-A Rev I EMF-9%-08I P-A a
I a
XN-75-32P-A XN-NF-82-06P-A
Technical Specification Changes Ameren Tech Spec 2.1.1 Reactor Core Safety Limits
Revise to add Framatome DNBR and FCM limits Tech Spec 32i Heat Flux Hot Channel Factor (FQ(Z))
Revise to reflect PDC-3 for power distribution control Tech Spec 323 Axial Flux Difference (AFD) (Relaxed Axial Offset Control Methodology, RAOC)
Revise to reflect PDC-3 for power distribution control Tech Spec 42.1-Reactor Core
Revise to refer to Zirconium clad Tech Spec 56.5 Core Operating Limits Report (COLR)
Revise to add Framatome methods to list of methods used to support COLR Tech Spec 31.1 7 Spent Fuel Assembly Storage and Tech Spec 4.3 Fuel Storage
Potentially impacted, an evaluation of the fuel storage rack subcriticality analysis is ongoing.
Dependent upon the results of the evaluation of the analysis, these Tech Specs may require revision.
Exemntion Renuest Ameren Callaway IW MISSOURI Energy Center
. M5 Cladding 10 CFR 50A6 and 10 CFR 50 Appendix K Exemption Request
. Similar to M5 cladding exemption requests for other plants
Schedule Amerell Callaway MISSOURI Energy Center
. LAR submittal March 31, 2022 Pre-submittal Meeting January 2022 Ameren/Framatome can support NRC Audit, if requested
. LAR Supplemental Submittal (Rod Ejection)
September 30, 2022 Ameren/Framatome can support NRC Audit, if requested Supplemental submittal schedule to incorporate RG I.236 approved method
. Requested NRC approval of LAR September 30, 2023 Supports Fuel Cycle 27, RFO begins October 2, 2023 Questions
-h_*
z *: ZZZ7Z
g.
Amerefl Callaway MISSOURI Energy Center