|
---|
Category:Graphics incl Charts and Tables
MONTHYEARML24190A1452024-07-0808 July 2024 Public Meeting Slides for Arkansas Nuclear One 2023 Annual Assessment, Pope County Quorum Court ML24114A1302024-04-15015 April 2024 Redacted Updated Safety Analysis Report (WCGS Usar), Revision 37, List of Effective Pages (Loep) 2CAN012401, U.S. Additional Protocol2024-01-17017 January 2024 U.S. Additional Protocol ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components ML23062A6162022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-1, Revision 17, Nuclear Power and DNBR Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6432022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-2, Revision 17, Pressurizer Pressure and Vessel Average Temperature Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23067A1202022-12-29029 December 2022 Site Addendum, Chapter 9, Figures ML22259A1222022-09-0808 September 2022 ANO Service Water KM Version ML21354A7552021-12-20020 December 2021 Recertification of Foreign Ownership Control or Influence and Request for FOCI Redetermination - Part 10 of 18 ULNRC-06628, Annual Radiological Environmental Operating Report Errata2021-01-0707 January 2021 Annual Radiological Environmental Operating Report Errata ML18194A0772018-12-13013 December 2018 Log of Boring PV-53 ML18194A0962018-08-0606 August 2018 Log of Boring PV-46 ML18194A0922018-08-0606 August 2018 Log of Boring PV-43C ML18194A0912018-08-0606 August 2018 Log of Boring PV-43B ML18194A0902018-08-0606 August 2018 Log of Boring PV-43A ML18194A0892018-08-0606 August 2018 Log of Boring PV-43 ML18194A0952018-08-0606 August 2018 Log of Boring PV-45 ML18194A0942018-08-0606 August 2018 Log of Boring PV-44 ML18194A0872018-08-0606 August 2018 Log of Boring PV-62 ML18194A0822018-07-13013 July 2018 Log of Boring PV-57 ML18194A1532018-07-13013 July 2018 Log of Boring PV-11 ML18194A1522018-07-13013 July 2018 Log of Boring PV-10 ML18194A1502018-07-13013 July 2018 Log of Boring PV-15 ML18194A1492018-07-13013 July 2018 Log of Boring PV-14 ML18194A1482018-07-13013 July 2018 Log of Boring PV-13 ML18194A1472018-07-13013 July 2018 Log of Boring PV-12 ML18194A1462018-07-13013 July 2018 Log of Boring PV-20 ML18194A1452018-07-13013 July 2018 Log of Boring PV-19 ML18194A1442018-07-13013 July 2018 Log of Boring PV-18 ML18194A1432018-07-13013 July 2018 Log of Boring PV-17 ML18194A1402018-07-13013 July 2018 Log of Boring PV-16 ML18194A1382018-07-13013 July 2018 Log of Boring PV-24 ML18194A0722018-07-13013 July 2018 Log of Boring PV-49 ML18194A0712018-07-13013 July 2018 Log of Boring PV-48 ML18194A3532018-07-13013 July 2018 Figure 2C-6, Geophysical Drill Hole Logs, GDDH-7, Gillespie Dam Alternate Siting Area ML18194A3522018-07-13013 July 2018 Figure 2C-5, Geophysical Drill Hole Logs, GDDH-6, Gillespie Dam Alternate Siting Area ML18194A3512018-07-13013 July 2018 Figure 2C-4, Geophysical Drill Hole Logs, GDDH-5, Gillespie Dam Alternate Siting Area ML18194A1612018-07-13013 July 2018 Log of Boring PV-1 ML18194A1602018-07-13013 July 2018 Log of Boring PV-7 ML18194A1592018-07-13013 July 2018 Log of Boring PV-6 ML18194A1582018-07-13013 July 2018 Log of Boring PV-5 ML18194A1572018-07-13013 July 2018 Log of Boring PV-4 ML18194A1562018-07-13013 July 2018 Log of Boring PV-3 ML18194A1552018-07-13013 July 2018 Log of Boring PV-2 ML18194A1512018-07-13013 July 2018 Log of Boring PV-9 ML18194A0862018-07-13013 July 2018 Log of Boring PV-61 ML18194A0852018-07-13013 July 2018 Log of Boring PV-60 ML18194A0842018-07-13013 July 2018 Log of Boring PV-59 ML18194A0832018-07-13013 July 2018 Log of Boring PV-58 ML18194A0802018-07-13013 July 2018 Log of Boring PV-56 2024-07-08
[Table view] |
Text
Plant Engineering Branch Closed Items Interim Safety Basis SITE ACT PEB Item Type Issue Planned Closure Disposition/Status/URI for Significance ORG LEAD Quarter Interim Safety Basis WC PEB RPM URI SDP List Approximately 20 CY 2004 Quarter 2 RPM provided draft SDP to SRA for review 20030 inches of fire 3/22. SRA has comments which will require 06-01 barrier between the The licensee additional inspection to address.
main steam immediately cleaned enclosure and out the debris, Unresolved for significance in IR 2003-006 auxiliary feedwater placed fire barrier dated February 3, 2004 system flow control material in the gap valve rooms was Closed in IR 2004-002 missing.
CWY PEB NFO URI SDP list Inadequate Alarm CY 2004 Quarter I 3 20030 Draft to Response Procedure revised E(gEib fe 07-04 DRP Procedure for prior to end of 2 e5 Smoke in Control inspection.
Room Ventilation Report was issued on November 28, 2003 Supply duct. indicating a URI for significance R:\ CW\2003\CW2003007-nfo.wod Closed in IR 2004-002 ANO PEB RLN URI SDP List Adequacy of CY 2004 Quarter 1 Regional Pre-SERP completed. SERP to be 20010 manual actions rescheduled next week.
06-02 used in lieu of Comp measures providing protection established _
for cables in FAs 98J and 99M
Plant Engineering Branch Closed Items Interim Safety Basis SITE ACT PEB Item Type Issue Planned Closure Disposition/Status/URI for Significance ORG LEAD Quarter I _Interim Safety Basis PV PEB RPM URI draft to Manual actions CY 2004 Quarter 1 Ray completed the review of the license basis 20030 DRP taken in lieu of Manual actions met and found the license basis included approval 07-01 providing physical IP interim criteria for of the as-found condition.
protection. safety (licensee says it's Closed in IR 2004-002 in the LB)
CGS PEB RPM URI SDP List Failure to provide CY 2004 Quarter 1 , jaL6thi Qtji .Eo-G=
20030 Draft to appropriate 5P-Ip- .fe 6rd ____
02-04 DRP corrective Licensee corrected jSmnL1yurrentR ictio -i measures to the problem during address CAQ last outage Unresolved for significance in IR 2003-02 affecting low dated June 2, 2003.
pressure coolant.
A known leaking Closed IR 2004-002 RHR check valve could adversely affect ASD during a control room fire.
CGS PEB RPM URI SDP List Procedure provided CY 2004 Quarter 1 $RW~q tefit 601 j. 9 20030 Draft to inadequate post fire Licensee revised RPP.IJ, wi C-o,v i -eee 02-03 DRP direction for control procedure R Ij room evacuation with two examples. Unresolved for significance in IR 2003-02 dated June 2, 2003.
Closed in IR 2004-002