June 15, 2023
SUBJECT:
CALLAWAY PLANT - COMPREHENSIVE ENGINEERING TEAM INSPECTION (CETI) INSPECTION REPORT 05000483/2023011
Dear Fadi Diya:
On May 25, 2023, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Callaway Plant and discussed the results of this inspection with Brent Jungmann, Senior Director, Nuclear Engineering, and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely, Vincent G. Gaddy, Chief Engineering Branch 1 Division of Operating Reactor Safety Docket No. 05000483 License No. NPF-30
Enclosure:
As stated
Inspection Report
Docket Number:
05000483
License Number:
Report Number:
Enterprise Identifier:
I-2023-011-0006
Licensee:
Ameren Missouri
Facility:
Callaway Plant
Location:
Steedman, MO
Inspection Dates:
May 08, 2023 to May 25, 2023
Inspectors:
J. Braisted, Senior Reactor Inspector
D. Bryen, Reactor Inspector
W. Cullum, Senior Reactor Inspector
C. Franklin, Reactor Inspector
N. Okonkwo, Reactor Inspector
D. Reinert, Senior Reactor Inspector
F. Thomas, Reactor Inspector
C. Young, Senior Reactor Analyst
Approved By:
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Operating Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a comprehensive engineering team inspection (CETI) inspection at Callaway Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
===71111.21M - Comprehensive Engineering Team Inspection The inspectors evaluated the following components and listed applicable attributes, permanent modifications, 10 CFR 50.59 evaluations/screens, and operating experience samples:
Structures, Systems, and Components (SSCs) (IP section 03.01)===
- (1) CGD02A, Cooling Tower Electrical Room Supply Fan A
Compliance with the updated final safety analysis report (UFSAR), technical specifications (TS), and TS bases
Component modifications and associated evaluations
Design calculations including fan motor minimum voltage, control logic, and heat transfer capacity/heat balance
Visual inspection of fan, dampers, and instruments during walkdown
Vendor and design requirements
Applicable operating experience relevant to sample
- (2) EFHV0066, Essential Service Water Cooling Tower Train B Bypass Valve
Design basis documents
System level procedures
Visual inspection of component during walkdown
System calculations
Logic for valve operation
Corrective action program documents
Preventative maintenance tasks and procedures
- (3) NB0113, Feeder Breaker to NG01 Control Building Load Center
Compliance with the UFSAR, TS, and TS bases
Design calculations including voltage analysis and short circuit calculations
Visual inspection of equipment and surrounding area
Electrical drawings
Component maintenance history and corrective action program documents
Procedures for circuit breaker inspection, maintenance, and testing
- (4) NG01B, A Train 480 VAC Auxiliary Building Motor Control Center
Compliance with the UFSAR, TS, and TS bases
Design calculations including voltage analysis and short circuit calculations
Visual inspection of equipment and surrounding area
Vendor and design requirements
Thermography procedure and results
- (5) NK01, 125 VDC Distribution Panel Class IE Group 1
Compliance with UFSAR, TS, and TS bases and plant procedures
Visual inspection of charger and associated system during walkdown
Environmental conditions of equipment
Surveillance procedure, testing, operations and maintenance records
Protection setting and coordination study
Design basis document
Vendor manual for conformance with manufacturer instructions for installation and maintenance
Preventive maintenance and periodic verification testing and post-test analyses
Schematic and wiring drawings
System health report
Corrective action program documents
- (6) NK21, 125 VDC Vital Battery Charger 1
Compliance with UFSAR, TS, and TS bases and plant procedures
Visual inspection of charger and associated system during walkdown
Environmental conditions of equipment
Design basis document
Preventive maintenance and periodic verification testing and post-test analyses
Surveillance procedure, testing, operations and maintenance records
Vendor manual for conformance with manufacturer instructions for installation and maintenance
Schematic and wiring drawings reviews
Corrective action program documents
Thermography inspection results of equipment internals
System health report
Protective settings and coordination study
Load test data study of batteries
- (7) PEF01A, Essential Service Water Pump A
Design basis documents
System level procedures
Visual inspection of component during walkdown
System calculations
Water hammer analysis Thermal-hydraulic ultimate heat sink analysis
Preventative maintenance tasks and procedures
- (8) SGL10A, Residual Heat Removal Room Cooler A
Heat exchanger testing procedures and performance history to assure consistency with vendor and industry recommendations
Room cooler maintenance history to verify the monitoring of potential degradation
Design calculations including required heat capacity, maximum tube plugging limits, and limiting flows and temperature inputs
Corrective action program documents
- (9) TEG01A, Component Cooling Water Surge Tank A
Compliance with the UFSAR, TS, and TS bases
Calibration procedures and acceptance criteria calculations for level instrumentation
Component modifications and associated evaluations
Design calculations including minimum usable safety related inventory and tank level setpoints
Visual inspection of tank, valves, and instruments during walkdown
Review of vendor and design requirements
Evaluation of applicable operating experience relevant to sample
- (10) XNG01, Transformer Load Center NG01 Load Center
Thermography procedure and results
Voltage analysis and short circuit calculations
Visual inspection during equipment walkdown
Review of vendor manual and plant design drawings
Modifications (IP section 03.02) (5 Samples)
- (1) MP 18-0045, Approve Changes to NK Battery Connection System Required for RF23
- (2) MP 19-0002, Thermocouple Core Cooling Monitor Replacement
- (4) MP 19-0018, Ultimate Heat Sink Cooling Tower Return to Ultimate Heat Sink Pond
- (5) RFR 170223, Gas Void in Containment Spray Pump Suction from Emergency Recirculation Sump 10 CFR 50.59 Evaluations/Screening (IP section 03.03) (20 Samples)
- (1) CA2511-00892, MP 13-0001, Replace Essential Service Water Supply Fans CGD01A&B
- (2) CA2511-00936, MP 13-0037, Polar Crane Bridge and Trolley Motor Controls Upgrade
- (3) CA2511-01196, MP 19-0002, Thermocouple Core Cooling Monitor Replacement
- (4) CA2511-01221, MP 19-0085, Cooling Tower Basin Level Indication Phase 2
- (5) CA2511-01266, MP 19-0124, Replace KJV0820A/B, Diesel Generator Auxiliary Lube Oil Pump Pressure Relief Valves
- (6) CA2511-01267, MP 20-0006, UHS Cooling Tower Fan Motor Circuits Relay Replacement
- (8) CA2511-01272, MP-19-0018, Ultimate Heat Sink Cooling Tower Return to Ultimate Heat Sink Pond
- (9) CA2511-01318, MP 21-0009, Improve the Ground Fault Relaying on the C Phase of MA01
- (10) CA2511-01344, MP 21-0001, Eliminate the Main Feedwater Regulating Valve Single Point Vulnerability and Improve Reliability
- (11) CA2511-01363, MP 21-0020, Replace Batteries PK11 and PK12
- (12) CA2511/TABLE 8-8B, Maximum Allowable Number of Fuel Assemblies Offloaded to the Spent Fuel Pool vs. Time after Shutdown Refuel Outage 26 and Spent Fuel Pool Water Temperature Limit for Fuel Handling Operations
- (13) CA2512-00032, MP 19-0088, Atmospheric Steam Dump Valves Environmental Qualification
- (14) CA2512-00034, Reduction in Containment Passive Heat Sinks
- (15) CA2512-00036, MP 20-0012, Obsolete Transmitter - Vendor Cannot Quote Replacement Without Addition Information
- (17) MP 19-0088, Atmospheric Steam Dump Valves Environmental Qualification
- (18) MP 19-0116, Evaluate and Approve Electromagnetic Interference Improvements for New EGS Connectors/Connections
- (19) MP 21-0021, RFR 210061, Reconfigure Select Intermediate Range Instruments
- (20) MP 22-0018, Replacement of Protective Relay PA0210211F
Operating Experience Samples (IP section 03.04) (3 Samples)
- (1) CR 201906202, Part 21 Fisher Information Notice 2019-01, Mechanical Setting of Disk/Stem Taper Pins for Fisher Type 7600, 7700, 7800, 9100, 9200, and 9500 Series Butterfly Valves
- (2) CR 202101555, Adverse to Quality Condition Found From Cook Unit 2 Operating Experience Review
- (3) CR 202104699, Wolf Creek DBAI Minor Violation of 10CFR50.65(a)(4) For Inadequate Model of the Startup Time of the NSAFWP Risk Value in PRA
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
On May 25, 2023, the inspectors presented the comprehensive engineering team inspection (CETI) inspection results to Brent Jungmann, Senior Director, Nuclear Engineering, and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
CN-CRA-19-5
Callaway Steam Tunnel GOTHIC Modeling Upgrade
E-B-13
Voltage Analysis
EDP-ZZ-01113
Infrared Thermography Program Guide
EF-45
Acceptance Criteria Used in Essential Service Water Flow
Balance Procedures
GD-342
Cooling Tower Electrical Room Ventilation
GK-05
Short Circuit Calculation
GL-137
SGL10A/B Room Cooler Heat Removal Capabilities
J-UEF03
Instrument Loop Uncertainty Estimate: UHS Cooling Tower
Fan Speed and Bypass Valve Control
M-EF-52
Heat Exchanger Performance Based on Reduced ESW
Temperature and Flow
M-EG-05 ADD 2
NPSH Available to the CCW Pumps with the Surge Tank
Empty
M-GK-370
Post-Accident Battery Room H2 Concentration Levels
001
NAI-2114-001
Evaluation of Gas Accumulation in Callaway Containment
Spray Suction Piping
NAI-2163-001
Callaway Energy Center UHS Thermal Performance
Analysis Using GOTHIC
NB-05
System NB Protective Relay Setpoints
004
NK-05
Class 1E Battery Capacity
010
NK-06
Class 1E DC Power System Fault Tree Model
000
NK-06 ADD 1
Class IE DC Power System Fault Tree Model
10/20/1998
NK-10
NK System DC Voltage Drop
2
NK-10
Attachments C, D, E, F, G, and K for NK-10 Calculation
2
ZZ-214
MOV Voltage Drop Calculation
ZZ-534
Quarter-turn MOV Capability and Margin Calculation
Calculations
ZZ-62
Plant Load Flow Calculation
Corrective Action
Documents
Condition Report
201904041, 201701094, 201901943, 201905148,
201906023, 202203343, 202203419, 201601612,
2002721, 202003059, 202003062, 202004888,
2100215, 202100247, 202101093, 202101766,
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
2200624, 202201540, 202001783, 202100910,
2101555, 202102021, 202102548, 202201363,
2300457, 200701515, 202007410, 201803185,
200408670, 200002868, 200409206, 202000763,
2201665, 200800976, 200901546, 201000245,
201004897, 201706920, 201803958, 201904646,
2005745, 202203112, 202204558, 202204863,
201901616, 201803185, 201802828, 201300761,
200801763, 202303127, 202302551, 202300381,
201806334, 201806919, 201905572, 201906202,
201905708, 202101276, 202103720, 201108964,
200803462, 201203653, 201305408, 202203151
Corrective Action
Documents
Resulting from
Inspection
Condition Report
2303237, 202303240, 202303241, 202303254,
2303269, 202303325, 202303400, 202303497,
2303510, 202303592, 202303596, 202303615,
2303621, 202303622, 202303623, 202303634,
2303643, 202303645, 202303676
10466-M-619.2-
23-01
1UEWOC Fan Curves
04/07/1978
E-009-00023
Metal-Clad Switchgear - Power & Control Circuits Electrical
Diagram - NB0113
E-050-00006
Batteries NK11 & NK14 60 Cell NCN-23S Layout ON-2-S07-
074530-816 Racks
014
E-050-00009
Batteries NK12 & NK13 - 60 Cell NCN-13S Layout ON-2-
S07-07 520-816 Racks
013
E-050-00032
Batteries - NCN & NCX Typical Termination Assemblies
003
E-051-00058
3PH SRC Controller Battery Charger Schematics
2
E-051-00079
Battery Chargers Wiring Diagram
009
E-051-00090
Phase Thyristor Control Class 1E 130V Battery Charger
NK21, NK22, NK23, NK24, NK25
011
E-21005(Q)
List of Loads Supplied by Emergency Diesel Generator.
038
E-21NB01(Q)
Lower Medium Voltage System Class 1E 4.16KV Single Line
Meter and Relay Diagram
Drawings
E-21NG01
Single Line Diagram
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
E-21NK01(Q)
Class IE 125V DC System Meter & Relay Diagram
018
E-23NK10
25 Volt DC Class 1E Power System Schematic
29
E-23NN01
Class 1E Instrument AC Schematic
014
E-U3EF05A(Q)
Schematic Diagram Cooling Tower Inlet Bypass Valve
E-U3GD02
Schematic Diagram ESW Elect. Room Supply Fan
M-105A-00002
Component Cooling Water Surge Tank
M-105A-003-02
Support Leg Cross Bracing Detail
01/04/1978
M-105A-009-02
Support Leg Detail
03/24/1977
M-1184-00015
Crosby Pressure Relief Valves
M-22EG01
P&ID Component Cooling Water System
M-22KJ03
P&ID Standby Diesel Generator "A" Lube Oil System
M-22KJ06
P&ID Standby Diesel Generator "B" Lube Oil System
M-619.2-00144
Fan Assembly drawing Buffalo Forge Co. Fan 330 BL ARR
9l Class 1
M-U2GD01
P&ID ESW Pumphouse & UHS Elec. Rm. HVAC
M-UG082
UHS Cooling Tower Arrangement
EC-46
Fuel Cycle 26 Decay Heat Load Calculation
MP 13-0037
Polar Crane Bridge and Trolley Motor Controls Upgrade
2
MP 19-0002
Thermocouple Core Cooling Monitor Replacement
MP 19-0018
UHS Cooling Tower Return to UHS Pond
MP 19-0085
Cooling Tower Basin Level Indication Phase 2
MP 19-0088
Atmospheric Steam Dump Valves Environmental
Qualification
003
MP 19-0116
Electromagnetic Interference Improvements for New EGS
Connectors/Connections
001
MP 19-0124
Replace KJV0820A/B, DG Aux Lube Oil Pump Pressure
Relief Valves
Engineering
Changes
MP 21-0001
Eliminate the Main Feedwater Regulating Valve Single Point
Vulnerability and Improve Reliability
003
19508715.500
Clean and Inspect Battery Charger NK21
000
19511729 NK21
Thermography Inspection Control Building. EL. 2016
000
2508001.500
Thermography Inspection - Control Building EL. 2016
000
Miscellaneous
ARC-1599
Independent Review of Crosby Engineering Calculation EC-
06/04/2020
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
24, R0
CA2507
Curve Book Evaluation Table 8-8B
CA2510
Screening for MP 08-0010
000
CA2510-01463
Improve the Ground Fault Relaying on the C Phase of MA01
50.59 review CA2510-01463 - MP 21-0009
000
CA2510eB
Screening for MP 18-0045 R001
001
CA2511-01318
50.59 Screen for MP 21-0009
000
CA2511-eB
50.59 Screening for MP 18-0045 Approve changes to NK
battery connection system required for RF23
000
CA2512-00034
Reduction in Containment Passive Heat Sinks
E-009-00319
Instruction Manual for SEL-251D Distribution Relay
000
E-050-00016
IM Batteries and Battery Packs Gould Inc, System: NK
Manual
017
E-27000A
Termination List Notes
033
GEH-262IC
General Electric Installation and Maintenance Instructions
for AV-Line Switchboards
06/01/1973
GEK-7320F
General Electric Instructions for Types AM-4.16-350-2C &
AM-4.16-350-2H Magne Blast Circuit Breaker
2/01/1980
GNB Industrial
Power Letter
March 14, 2012-03-14 letter from Paul Mattaliano of GNB
industrial Power to Nicole Weber of Ameren Missouri -
Callaway Energy Center on NCN Hydrogen Generation
Rates
03/14/2012
HI 2004101
Health Risk and Solution Option Ranking -Thermocouple
Core Cooling Monitor (TCCM) Obsolescence Issues (OBS)
Thermocouple Core Cooling Monitor Operations and
Maintenance Manual
IM Atmosphere Relief Valve - Masoneilan International
055
LDCN 19-0011
FSAR Markup/ LDCR CR# 201901616
FSAR SP SEC 9.3.3.5 for MP 19-0012,
M-2024-00001
IM Nitrogen Isolation - Velan Engineering Company
000
M-612-00062
IM Air Handling Units (Room Coolers) Carrier Corporation
M-619.2-00136
Instruction Manual for Safety Related Fans
M-924
Specification For Safety Related Fans CGD01A & B /
CGM01A & B
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
M-U0GD
System Description Essential Service Water Pump House
Ventilation System and UHS Cooling Tower Electrical Room
Ventilation System
MP 08-0010
CA2511
50.59 Screening for Setpoint adjustment for Control Building
001
MP 18-0045
Approve changes to NK battery connection system required
for RF23
003
MP 19-0012
Setpoint re-adjustment (lower level) for Control Building
001
MP 21-0009
Improve the Ground Fault Relaying on the C Phase of MA01
2
MP 21-0020
RFR 200020 - Replace Batteries PK11 & PK12
001
N/A
SEL-351A, -1 Relay Distribution Protection System
Instruction Manual
09/08/2019
NG-22
NK21CB1 Feeder Breaker Application Sheet
001
OTA-RK-00024
Addendum 94F
Miscellaneous Sumps Level High
005
RFR
AK Correction Factors on Room Coolers
B
RFR 004371B
Interstep Cable Connector Part Numbers
B
RFR 007519
Eval. NK Battery Interstep Cable material Equiv.
A
RFR 017225A
Material Equiv. for a different Subtier on a GNB lug
A
RFR 020132A
Update E-050 I/M'S Due NK Battery Replacement
A
RFR 170208
Approve Part Number Change for GNB Batteries (NCN and
NCX Series)
000
RFR 170223
Gas Void in CTMT Spray Pump Suction from Emergency
Recirculation Sump
RFR 170223
Gas Void in CTMT Spray Pump Suction from Emergency
Recirculation Sump
RFR 180078
Approve changes to NK battery connection system required
for RF23 and the battery swap out being done during refuel
000
RFR 200135
Retire Installed Hydrogen Analyzers in the NK, PK and
Comm. Corridor Battery Rooms
000
RFR 20115
Evaluate NK Battery Interstep Cable Material Equiv
000
RFR 210110
External Indication of Ventilation Status For Communications
Corridor Battery Room No. 1
000
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
RFR 210112
Evaluate If NK Battery Room Hydrogen Monitors Are
Required
000
RFR 210113
Evaluate if Communications Corridor Radio Room/Battery
Room Hydrogen Monitor Can Be Retired
000
ULDBD-EG-001
Component Cooling Water
ULDBD-GD-001
Essential Service Water Pumphouse and Ultimate Heat Sink
Ventilation Systems
ULDBD-GL-001
Auxiliary Building Ventilation System
ULDBD-NB-001
Lower Medium Voltage (Class 1E 4.16KV)
ULDBD-NG-001
Low Voltage (480V) - Class 1E
APA-ZZ-00143
CFR 50.59 AND 10 CFR 72.48 Reviews
2
APA-ZZ-00320
Work Execution
2
APA-ZZ-00330
Preventive Maintenance Program Administrative Correction
059
APA-ZZ-00395
Significant Operator Response Timing
033
APA-ZZ-00396
Gas Intrusion Program
APA-ZZ-00500
Corrective Action Program
075
APA-ZZ-00604
Requests For Resolution
2
E-017-00397
IM Load Center Unit Substations General Electric Company,
System: NG
28
E-050-00038
Seismic Qualification Report of Cable Clamps
000
E-051-00090
Phase Thyristor Control Class 1E 130V Battery Charger
NK21, NK22, NK23, NK24, NK25
011
E-051B-00002
Instruction Manual for Installation and Operation pf Class 1E
Electrically Operated Manually controlled Transfer Switches,
NK71-Thru NK78
000
E-1
Loss of Reactor or Secondary Coolant
23
E-1052-00017
IM FOR LGSB13 AND LGSB2 Circuit Breakers, Nuclear
Logistics Inc. System: PG
003
E-2
Faulted Steam Generator Isolation
2
E-21013
Installation, Inspection, and Testing Details For Electrical
Equipment and Cable
057
E-25000A
Cable and Raceway Notes, Details, and Tables
055
Procedures
E-3
Steam Generator Tube Rupture
25
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
ECA-0.0
Loss of All AC Power
2
EDP-ZZ-00396
Gas Intrusion Program Implementation
EDP-ZZ-01112
Heat Exchanger Predictive Performance Manual
EDP-ZZ-01113
Infrared Thermography Program Guide
2
EDP-ZZ-01133
Air Operated Valve Program Guide
26
CCW Surge TK 'A' Level Channel OP Test
LSELS Train A ESW and CCW Pump Start Inhibit Test
ITL-EG-00R09
CCW HX 'A' Inlet Process Rad Monitor Loop Cal
ITL-GD-00T51
LOOP-TMP; UHS Cooling Tower Elec. Rm Sply Fan
(CGD02A) Temp
ITM-ZZ-VT001
Diagnostic Calibration and Testing of Modulating Air
Operated Valves
25
MP 08-0010
Setpoint adjustment for Control Building Sump
001
MPE-NK-QB004
NK CLASS 1E Battery Charger Inspection
013
MPE-ZZ-QS003
Cleaning and Inspection of 120 VAC Distribution Panels,
25 VDC and 250 VDC Switchboards and Miscellaneous
Electrical Panels
014
MPE-ZZ-QS005
General Electric 4.16KV Breaker PM
034
MPE-ZZ-QS006
GE Magne Blast Breaker Overhaul
015
MPE-ZZ-QS008
G.E. 480 VOLT Load Center PM
29
MPM-ZZ-QH001
Inspection and Maintenance of Tornado Dampers
MPM-ZZ-QV009
Fisher Controls Nuclear Carbon Steel Butterfly Valves -
Disassembly Inspection and Reassembly
MPM-ZZ-QW002
Safety-Related Fan Belt Replacement/Tensioning
MPM-ZZ-QW002
Safety-Related Fan Belt Replacement/Tensioning
MSE-NK-QB002
Quarterly Surveillance on NK Quarterly Surveillance on NK
Large Station Batteries
016
MSE-NK-QB011
Inspection and Surveillance of NK11 Battery and Battery
Chargers NK21/NK25
27
MTE-ZZ-QB002
Battery Charger Maintenance, Field Adjustments, and
Troubleshooting
20
MTE-ZZ-QN005
Electrical Scheme Checkout
011
MTM-ZZ-QA002
Limitorque SMB-00 MOV Inspection and Overhaul
20
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
MTT-ZZ-00001
HVAC System Air Balancing
RHR Train A Inservice Test - Group A
Containment Spray System Venting
OTA-NK-00001,
Addendum 3A
Switchboard Bus Under Voltage
OTN-EG-00001
Component Cooling Water System
OTN-EG-00001
ADDENDUM 1
Transferring Water Between Surge Tanks
OTN-LF-00001
Addendum 9
Control Building Floor/Equipment Sump level High
004
OTO-EG-00001
CCW System Malfunction
Three-Month Response to NRC Generic Letter 2008-
01,"Managing Gas Accumulation In Emergency Core
Cooling, Decay Heat Removal, and Containment Spray
Systems" (TAC NO. MD7806)
04/10/2008
Three-Month Response to NRC Generic Letter 2008-
01,"Managing Gas Accumulation In Emergency Core
Cooling, Decay Heat Removal, and Containment Spray
Systems" (TAC NO. MD7806)
10/13/2008
Three-Month Response to NRC Generic Letter 2008-
01,"Managing Gas Accumulation In Emergency Core
Cooling, Decay Heat Removal, and Containment Spray
Systems" (TAC NO. MD7806)
2/04/2009
Supplemental Response to NRC Generic Letter 2008-
01,"Managing Gas Accumulation In Emergency Core
Cooling, Decay Heat Removal, and Containment Spray
Systems" (TAC NO. MD7806)
2/15/2014
Work Orders
Job
07510763.250, 10507443.250, 10507443.550,
11512464.500, 17004271.550, 20511173, 21502427,
2509934, 22500698, 20000796, 20002095, 13505629.500,
19508715.500, 19509000.500, 18000362.900,
18000363.900, 18000364.505, 18000365.520,
19003551.940, 21001642, 20511648, 14504618, 20509118,
21500183.500, 22001102.350, 22502362, 18512211.500