ML23062A616
From kanterella
Jump to navigation
Jump to search
ML23062A616 | |
Person / Time | |
---|---|
Site: | Callaway |
Issue date: | 12/29/2022 |
From: | Ameren Missouri, Union Electric Co |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML23067A139 | List:
|
References | |
ULNRC-06782 | |
Download: ML23062A616 (1) | |
Similar Documents at Callaway | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARML23062A6162022-12-29029 December 2022
[Table view]Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-1, Revision 17, Nuclear Power and DNBR Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6432022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-2, Revision 17, Pressurizer Pressure and Vessel Average Temperature Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23067A1202022-12-29029 December 2022 Site Addendum, Chapter 9, Figures ULNRC-06628, Annual Radiological Environmental Operating Report Errata2021-01-0707 January 2021 Annual Radiological Environmental Operating Report Errata ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ULNRC-05963, Enclosure 2 to ULNRC-05963, Amendment 22, LRA Changes from RAI Responses and Typographical Corrections, Summary Table2013-02-28028 February 2013 Enclosure 2 to ULNRC-05963, Amendment 22, LRA Changes from RAI Responses and Typographical Corrections, Summary Table ULNRC-05928, Enclosure 2 to ULNRC-05928, Amendment 15, LRA Updates2012-11-0808 November 2012 Enclosure 2 to ULNRC-05928, Amendment 15, LRA Updates ULNRC-05918, Enclosure 2 to ULNRC-05918, Callaway, Unit 1, Amendment 12, LRA Changes from RAI Responses2012-10-15015 October 2012 Enclosure 2 to ULNRC-05918, Callaway, Unit 1, Amendment 12, LRA Changes from RAI Responses ML12271A4742012-08-13013 August 2012 Enclosure 38 to ULNRC-05893 - Amerenue 2010c. Callaway Landfill Groundwater Quality Data 2006 - 2009. March ULNRC-05893, Callaway, Unit 1, Enclosure 38 to ULNRC-05893 - Amerenue 2010c. Callaway Landfill Groundwater Quality Data 2006 - 2009. March2012-08-13013 August 2012 Callaway, Unit 1, Enclosure 38 to ULNRC-05893 - Amerenue 2010c. Callaway Landfill Groundwater Quality Data 2006 - 2009. March ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML12096A3692012-04-20020 April 2012 Request for Concurrence with List of Federally Protected Species and Habitats for the Proposed Callaway Plant License Renewal ML1210105572012-04-0909 April 2012 Attachment 3 ML1035103132010-12-16016 December 2010 Draft TS Mark-up Provided by Licensee as Clarification of Mutual Understanding Following NRC-Licensee TS Modification Discussions at 11/18/10 Public Mtg Re CT Extensions for TS 3.3.2 License Amendment Request ML1019004182010-06-28028 June 2010 Quick View Chart ML1016200532010-06-0909 June 2010 Borehole Identification Tables, Callaway Power Plant, Terracon Project No. 09067011T ML12271A4792009-12-31031 December 2009 Enclosure 40 to ULNRC-05893 - Mdnr (Missouri Department of Natural Resources) 2009b. Callaway #2 Water District Pwss Report 3024085 ULNRC-05893, Callaway, Unit 1, Enclosure 40 to ULNRC-05893 - Mdnr (Missouri Department of Natural Resources) 2009b. Callaway 2 Water District Pwss Report 30240852009-12-31031 December 2009 Callaway, Unit 1, Enclosure 40 to ULNRC-05893 - Mdnr (Missouri Department of Natural Resources) 2009b. Callaway #2 Water District Pwss Report 3024085 ML0729505272007-10-22022 October 2007 Summary of Meeting with Amerenue Callaway Plant to Discuss Various Topics, Including: Essential Service Water; Current Problem Identification & Resolution Crosscutting Issue; Recent Human Performance Improvements ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0630502032006-10-25025 October 2006 Callaway, Requests for Relief from ASME Section Xi Code Inservice Examination Requirements ML0426101132004-09-13013 September 2004 Plant Engineering Branch Open Items Interim Safety Basis (URI 2002003-01) 2022-12-29 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML23318A1082023-12-28028 December 2023
[Table view]FSAR Chapter 1, Figures Redacted ULNRC-06822, FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.192023-06-14014 June 2023 FSAR Markup for FSAR Site Addendum (SA) Sections 13.1.3.1, 13.1.3.1.18, and 13.1.3.1.19 ML23062A6062022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Electric Power ML23062A6072022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figure 5.2-2, Primary Coolant Leak Detection Response Time ML23062A6082022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Figures ML23062A6092022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML23062A6112022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Sections ML23062A6122022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figures ML23062A6132022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, List of Effective Tables ML23062A6152022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Figures ML23062A6162022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-1, Revision 17, Nuclear Power and DNBR Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6172022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 14, Initial Test Program ML23062A6182022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23062A6192022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, General Table of Contents ML23062A6202022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Figures ML23062A6212022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figure 18.2-12, Functional Diagram Reactor Core Subcooling Monitor ML23062A6222022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23062A6232022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Index to NRC Questions and Responses ML23062A6242022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 19, License Renewal Supplement ML23062A6252022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Figures ML23062A6262022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 11, Figures ML23062A6272022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 7, Figures ML23062A6282022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Figures ML23062A6292022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Figures ML23062A6302022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 2, Site Characteristics ML23062A6312022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 4, Reactor ML23062A6322022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Figures ML23062A6332022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23062A6342022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 10, Figures ML23062A6352022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Accident Analysis ML23062A6362022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23062A6372022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Change Notice Log ML23062A6382022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Figures ML23062A6392022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 8, Figures ML23062A6402022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant ML23062A6412022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 12, Radiation Protection ML23062A6422022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23062A6432022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 15, Figure 15.6-2, Revision 17, Pressurizer Pressure and Vessel Average Temperature Transients for Inadvertent Opening of a Pressurizer Safety Valve ML23062A6442022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23062A6452022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23062A6472022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 6, Figures ML23062A6502022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Clarification of TMI Action Plan Requirements ML23062A6512022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Technical Requirements ML23062A6522022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 16, Figures ML23062A6532022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 17, Quality Assurance ML23062A6542022-12-29029 December 2022 Revision OL-26 to Final Safety Analysis Report, Chapter 18, Figures ML23062A6492022-12-29029 December 2022 Submittal of Revision OL-26 to Final Safety Analysis Report and Revision 18 to Technical Specification Bases ML22335A5102022-12-0101 December 2022 Attachment 1 - Proposed FSAR Change (Markups) ML21348A7492021-12-16016 December 2021 FSAR Revision 25 Chapter 1 Figures Redacted ML21335A4582021-12-0101 December 2021 Enclosure 6: Proposed Final Safety Analysis Report Changes (Mark-up - for Info Only) 2023-06-14 |
Text
0::: OJI La.I 3,::
0 a.-z
().6
~g
(.)
z (),4
0.2
25 50 75 100
4
2
1-+-.......___._...... ______......._ _____....... ______....._ __....... _
0 25 50 75 100 TIME {sec)
CALLAWAY PLANT
FIGURE 15.6-1 NUCLEAR POWER AND DNBR TRANSIENTS FOR INADVERTENT OPENING OF A PRESSURIZER SAFETY VALVE REV. 17 11/22
Retrieved from "https://kanterella.com/w/index.php?title=ML23062A616&oldid=3710255"