Letter Sequence Meeting |
---|
CAC:MF8118, Clarify Application of Setpoint Methodology for LSSS Functions, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Open) CAC:MF8119, Clarify Application of Setpoint Methodology for LSSS Functions, Addition of New Tech Spec on RCS Boron Limits and Revisions to Tech Spec 3.3.1 to Address Rwfs, Revise Containment Requirements During Handling Irradiated Fuel and Core Alterations (Open) |
|
MONTHYEARML16236A0972016-08-25025 August 2016 Operating Corporation - August 25, 2016, Core Design and Safety System Analysis Methodology Transition License Amendment Request Revised Project stage: Request ML16243A5132016-09-0101 September 2016 Summary of August 25, 2016, Public Meeting with Wolf Creek Nuclear Operating Corporation and Amerenue Regarding a Proposed Application for a New Technical Specification for the Class 1E Electrical Equipment Air Conditioning System (MF8118 a Project stage: Meeting ML18068A6922018-03-0909 March 2018 Attachment 6 - List of Regulatory Commitments Project stage: Other ML18068A6912018-03-0909 March 2018 Attachment 5 - Proposed TS Bases Changes (for Information Only) Project stage: Other ULNRC-06401, Attachment 4 - Revised Technical Specification Pages2018-03-0909 March 2018 Attachment 4 - Revised Technical Specification Pages Project stage: Other ML18068A6892018-03-0909 March 2018 Attachment 3 - Proposed Technical Specification Changes (Mark-Up) Project stage: Other ML18068A6882018-03-0909 March 2018 Attachment 2 - Evaluation of the Proposed Change Project stage: Request ML18068A6862018-03-0909 March 2018 License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System (Ldcn 16-0013) Project stage: Request 2016-09-01
[Table View] |
|
---|
Category:Meeting Summary
MONTHYEARML24268A0722024-09-24024 September 2024 Summary of August 28, 2024, Public Meeting to Discuss Cyber Security Regulatory Issues Regarding Wolf Creeks Implementation of Advanced Remote Monitoring Using Wireless ML24212A0372024-08-0707 August 2024 Summary of July 23, 2024, Teleconference with Wolf Creek Nuclear Operating Corporation Regarding Wolf Creek Generating Station, Unit 1, Amendment No. 237, Allowing the Use of Portable Lighting ML24088A3122024-04-0101 April 2024 Summary of March 25, 2024, Teleconference with Wolf Creek Nuclear Operating Corporation Regarding Revised Safety Evaluation for Wolf Creek Generating Station Unit 1, Amendment No. 237, Allowing the Use of Portable Lighting ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23303A2182023-11-0606 November 2023 Summary of October 16, 2023, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a License Amendment Request to Adopt TSTF-505 for Wolf Creek Generating Station, Unit 1 ML22259A1192022-10-12012 October 2022 Summary of Pre-Application Teleconference with Union Electric Company to Discuss Approval to Insert Framatome Gaia Fuel Assemblies in Its Core Reload Quantities for Callaway Plant, Unit No. 1 ML22181A0012022-07-22022 July 2022 Summary of June 29, 2022, Public Meeting - Union Electric Company, Dba Ameren Missouri to Discuss Upcoming License Amendment Request to Revise Technical Specifications to Reflect Revised Spent Fuel Pool Criticality Safety Analysis ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22089A2292022-04-0606 April 2022 February 28, 2022, Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatome Gaia Fuel Assemblies in Their Core in Reload Quantities for Callaway Plant, Unit No. 1 ML22011A0862022-01-11011 January 2022 Summary of January 10, 2022, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a License Amendment Request to Use Portable Lighting for Wolf Creek Generating Station, Unit 1 ML21333A1312021-12-0707 December 2021 Summary of Meeting with Wolf Creek Nuclear Operating Corporation Diesel Generator Completion Time License Amendment Request for Wolf Creek Generating Station ML21308A0742021-11-17017 November 2021 Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatomes Gaia Fuel Assemblies in Its Core in Reload Quantities for Callaway Plant, Unit No. 1 ML21243A0042021-09-0707 September 2021 Summary of Teleconference Meeting with Union Electric Company Regarding Proposed License Amendment Request to Revise the Emergency Plan ML21216A2002021-08-11011 August 2021 Summary of Public Webinar with Ameren Missouri to Discuss the Nuclear Regulatory Commission 2020 Annual Assessment of Callaway Plant Docket No. 50-483 ML21200A1102021-07-21021 July 2021 Summary of July 13, 2021, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a Temporary Emergency Preparedness Exercise Exemption Request ML21168A0022021-07-0101 July 2021 Summary of Partially Closed Pre-Application Teleconference with Union Electric Company Regarding Approval to Insert Framatome'S Gaia Fuel Assemblies in Their Core in Reload Quantities for Callaway Plant, Unit No. 1 ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21127A1322021-05-11011 May 2021 Summary of April 16, 2021, Conference Call with Representatives of Wolf Creek Generating Station Regarding the Spring 2021 Steam Generator Tube Inspections ML21103A0032021-04-16016 April 2021 Summary of March 15, 2021, Teleconference Meeting with Union Electric Company Regarding Proposed License Amendment Request to Implement Alternative Source ML20332A0422020-12-0101 December 2020 Summary of November 19, 2020, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation an Emergency Response Organization Staffing License Amendment Request ML20332A0462020-11-30030 November 2020 Summary of November 18, 2020, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation a Risk-Informed Generic Safety Issue (GSI)-191 License Amendment Request ML20280A5632020-10-21021 October 2020 Summary of Teleconference Meeting with Union Electric Company (Dba Ameren Missouri) for Callaway Plant, Unit 1, on Pre-Application for LARs on TSTF-439, TSTF-505, and Title 10 CFR 50.69 Categorization Program (EPID L-2020-LRM-0072 ML20189A1992020-07-13013 July 2020 Summary of (COVID-19) Presubmittal Public Teleconference W/Union Electric Company Postponement of Steam Generator Eddy Current Testing, by One Refueling Outage, for Callaway Plant, Unit No. 1 ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19268A9772019-10-16016 October 2019 Summary of 9/12/2019 Meeting with Union Electric Company Related to Closure of Generic Letter 2004-02 for Callaway Plant, Unit 1 ML19143A4182019-05-21021 May 2019 Summary of Public Meeting with Wolf Creek Nuclear Operation Corporation ML19140A4742019-05-20020 May 2019 Closed Meeting with Wolf Creek Nuclear Operating Corporation to Conduct a Mediation Session Regarding Falsification of Documentation Associated with Licensee Maintenance Activities ML18313A2542018-11-16016 November 2018 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation Regarding License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses for Wolf Creek Generating Station ML18215A3752018-08-21021 August 2018 Summary of Pre-Submittal Meeting with Union Electric Company to Discuss an Alternate Source Term License Amendment Request ML17276B4892017-10-23023 October 2017 9/25/17 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation Regarding the Proposed LAR for Change in Emergency Plan Staff Augmentation Response Times for Wolf Creek Generating Station (CAC No. MG0174; EPID L-2017-LRM-001 ML16271A4822016-09-27027 September 2016 Summary of Regulatory Conference to Discuss Safety Significance of Wolf Creek Generating Station Emergency Generator Excitation Diode Apparent Violation ML16250A1652016-09-0909 September 2016 8/25/16 Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Amendment Request to Transition to Westinghouse Analyses Methodologies and Alternate Source Term at Wolf Creek Generating Station ML16243A5132016-09-0101 September 2016 Summary of August 25, 2016, Public Meeting with Wolf Creek Nuclear Operating Corporation and Amerenue Regarding a Proposed Application for a New Technical Specification for the Class 1E Electrical Equipment Air Conditioning System (MF8118 a ML16165A0042016-06-23023 June 2016 Summary of 6/1/2016 Public Meeting with Union Electric Company to Discuss Generic Safety Issue 191 and Callaway Plant Unit 1's Debris Testing Plan ML16106A1742016-04-22022 April 2016 Summary of Meeting with Wolf Creek Nuclear Operating Company to Discuss the Generic Safety Issue (GSI)-191 Testing Plan/Fiber Penetration and Head Loss Testing Approach for Wolf Creek Generating Station ML15182A0952015-06-30030 June 2015 Summary of Annual Assessment Meeting with Wolf Creek Nuclear Operating Corporation (WCNOC) Regarding Wolf Creek Generating Station 2014 Performance ML14281A3652015-02-23023 February 2015 May 2, 2014, Summary of Conference Call Held Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application ML14223A6022014-08-20020 August 2014 Summary of Telephone Conference Call Held on December 18, 2013, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) ML14223A5322014-08-20020 August 2014 November 26, 2013, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal A ML14177A5952014-07-0808 July 2014 Summary of Telephone Conference Call Held on February 12, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to the Callaway Plant, Un ML14175B4992014-07-0808 July 2014 Summary of Telephone Conference Calls Held on October 2 and 3, 2013, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Concerning Requests for Additional Information Pertaining to the Callaway Plan ML14188C4812014-07-0707 July 2014 Summary of Annual Assessment Meeting with Wolf Creek Generating Station ML14169A6372014-07-0303 July 2014 Summary of Telephone Conference Call Held on April 28, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) Pertaining to the Callaway Plant, Unit 1, LRA ML14169A6042014-07-0303 July 2014 April 30, 2014, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application ML14169A4412014-07-0303 July 2014 Summary of Telephone Conference Call Held on April 21, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application (Tac. No. ME7708 ML14125A1992014-07-0303 July 2014 Summary of Telephone Conference Call Held on April 9, 2014, Between the U.S. Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri), Pertaining to the Callaway Plant, Unit 1, License Renewal Application (Tac. No. ME7708) ML14121A5532014-06-18018 June 2014 November 25, 2013, Summary of Telephone Conference Call Held Between NRC and Union Electric Co., (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal Application ML14134A1842014-05-14014 May 2014 Summary of Public Meeting to Discuss an Apparent Violation Identified at Wolf Creek Generating Station ML14093B3382014-04-14014 April 2014 01/30/2014, Summary of Telephone Conference Call Held Between NRC and Union Electric Co., (Ameren Missouri), Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal Application ML14087A2102014-04-0808 April 2014 Summary of 3/25/14 Verbal Relief Telephone Conference, Relief Request I3R-16, Temporary Non-Code Repair of the Train a Component Cooling Water Heat Exchanger to Control ESW Leakage, Third 10-Year Inservice Inspection Interval 2024-09-24
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 1, 2016 LICENSEES: Wolf Creek Nuclear Operating Corporation AmerenUE FACILITIES: Wolf Creek Generating Station Callaway Plant, Unit 1
SUBJECT:
SUMMARY
OF AUGUST 25, 2016, PUBLIC MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION AND AMERENUE REGARDING A PROPOSED APPLICATION FOR A NEW TECHNICAL SPECIFICATION FOR THE CLASS 1E ELECTRICAL EQUIPMENT AIR CONDITIONING SYSTEM (CAC NOS. MF8118 AND MF8119)
On August 25, 2016, a Category 1 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Wolf Creek Nuclear Operating Corporation (WCNOC), Union Electric Company (dba AmerenUE or Ameren Missouri) and their contractor at NRC Headquarters, Rockville, Maryland. The purpose of the meeting was to discuss the licensees' planned request to add a new technical specification (TS) for Wolf Creek Generating Station (WCGS) and Callaway Plant, Unit 1 (Callaway) for the Class 1E electrical equipment air conditioning system. The meeting notice and agenda are located in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML16238A055.
The licensee presented information on the background, basis, and content of the proposed application, which is available at ADAMS Accession Nos. ML16236A095 (Public Version of the Licensee Slides for the Meeting Discussion), and ML16236A218 (Non-Public Version of the Licensee Slides for the Meeting Discussion; Security-Related Information).
The NRC staff queried the licensees about several aspects of the proposed application and provided feedback. The licensees intend to submit simultaneous license amendment requests by the end of December 2016, and plan to make related modifications online and during refueling outages (Spring 2018 for WCGS and Fall 2017 for Callaway). No regulatory decisions were made at the meeting.
A list of meeting attendees is enclosed. No members of the public attended.
Please direct any inquiries to me at 301-415-2296, or Fred.Lyon@nrc.gov.
Carl F. Lyon, Project Manager Plant Licensing Branch IV-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-482 and 50-483
Enclosure:
List of Attendees cc w/encl: Distribution via Listserv
LIST OF ATTENDEES AUGUST 25. 2016. PUBLIC MEETING WITH WOLF CREEK NUCLEAR OPERATING CORPORATION (WCNOC) AND AMERENUE CLASS 1E ELECTRICAL EQUIPMENT AIR CONDITIONING SYSTEM FOR WOLF CREEK GENERATING STATION AND CALLAWAY PLANT. UNIT 1 Licensee Attendees*
B. McDaniel, WCNOC R. Clemons, WCNOC W. Muilenburg, WCNOC J. Isch, WCNOC G. Curten, WCNOC J. McCoy, WCNOC S. Kovaleski, AmerenUE T. Elwood, Ameren Missouri L. Wilhelm, Ameren Missouri R. Pohlman, Ameren Missouri L. Eitel, Ameren Missouri W. Jostes, Ameren Missouri S. Wideman, Project Performance Improvement, Inc.
U.S. Nuclear Regulatory Commission N. Karipineni, SBPB P. Snyder, STSB L. Wheeler, STSB C. Tilton, STSB*
N. Khan, EEEB J. Zimmerman, EEEB' S. Matharu, EEEB*
K. West, EEEB F. Lyon, LPL4-1 J. Klos, LPL4-1
- by audiobridge. Several other licensee staff from WC NOC and AmerenUE also participated by audiobridge.
Enclosure
Meeting Notice ML16238A055 Summary ML16243A513, Handouts ML16236A095 (Public), ML16236A218 (Non-Public)
OFFICE NRR/DORL/LPL4-1 /PM NRR/DORL/LPL4-1 /LA NRR/DORL/LPL4-1 /BC NRR/DORL/LPL4-1 /PM NAME Fl yon JBurkhardt (PBlechman for) RPascarelli FL yon DATE 09/01/16 09/01/16 09/01/16 09/01/16