MONTHYEARML18068A6852018-03-0909 March 2018 License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System (LDCN 16-0013) Project stage: Request ML18107A7482018-04-17017 April 2018 NRR E-mail Capture - Acceptance Review for EPID L-2018-LLA-0062 Callaway LAR Callaway TS Change for Class 1E AC system-- Status Accepted Project stage: Acceptance Review ML18156A4042018-06-19019 June 2018 Regulatory Audit Plan for September 18-19, 2018, in Support of License Amendment Request to Incorporate New Technical Specification 3.7.20 Project stage: Other ML18353B0162019-01-0404 January 2019 Regulatory Audit Summary License Amendment Request to Incorporate a New Technical Specification 3.7.20 Project stage: Other ML19009A3442019-01-0909 January 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Callaway Plant Class 1E LAR, L-2018-LLA-0062 Project stage: RAI ML19010A0102019-01-0909 January 2019 NRR E-mail Capture - Correction of RAI Response Date -- Ref: Formal Release of RAIs Ref: Callaway Plant Class 1E LAR, L-2018-LLA-0062 Project stage: RAI ML19024A4752019-01-23023 January 2019 Attachment 5 - List of Regulatory Commitments Project stage: Request ULNRC-06477, Supplement to License Amendment Request for Additional of New Technical Specification 3.7.20, Class IE Electrical Equipment Air Conditioning (A/C) System (LDCN 16-0013)2019-01-23023 January 2019 Supplement to License Amendment Request for Additional of New Technical Specification 3.7.20, Class IE Electrical Equipment Air Conditioning (A/C) System (LDCN 16-0013) Project stage: Supplement ML19024A4692019-01-23023 January 2019 Supplement to License Amendment Request for Additional of New Technical Specification 3.7.20, Class IE Electrical Equipment Air Conditioning (A/C) System (LDCN 16-0013) Project stage: Request ML19024A4712019-01-23023 January 2019 Attachment 1 - NRC Audit Questions and Responses Project stage: Request ML19039A3522019-02-0808 February 2019 Response to Request for Additional Information Pertaining to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System. Project stage: Request ULNRC-06482, Response to Request for Additional Information Pertaining to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System2019-02-0808 February 2019 Response to Request for Additional Information Pertaining to License Amendment Request for Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System Project stage: Response to RAI ML19039A3542019-02-0808 February 2019 RAI Questions and Responses Project stage: Request ML19044A5052019-02-21021 February 2019 License Conditions Associated with License Amendment Regarding Addition of New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System Project stage: Other ULNRC-06491, Additional Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class IE Electrical Equipment Air Conditioning (A/C) System (LDCN 16-0013)2019-03-0707 March 2019 Additional Supplement to License Amendment Request for Addition of New Technical Specification 3.7.20, Class IE Electrical Equipment Air Conditioning (A/C) System (LDCN 16-0013) Project stage: Supplement ML19073A0012019-04-18018 April 2019 Issuance of Amendment No. 219 to Add New Technical Specification 3.7.20, Class 1E Electrical Equipment Air Conditioning (A/C) System Project stage: Approval 2019-01-04
[Table View] |
Text
Attachment 5 to ULNRC-06477 Page 1 of2 List of Regulatory Commitments to ULNRC-06477 Page 2 of 2 LIST OF REGULATORY COMMITMENTS Planned modifications are in process to achieve the capability for one Class 1 E electrical equipment NC train to provide adequate cooling for both trains of electrical equipment during normal and accident conditions by design changes. The planned modifications include the following:
Computer points are used to verily the DC switchboard rooms and ESF switchgear room temperatures are less than 87°F and provide an alarm to alert Control Room personnel.
The temperature limits established for these rooms is 87°F (this includes an allowance for instrument error of +/-3°F). The alarm setpoint on the associated temperature indicators will be lowered to 83°F.
Two circulating fans with isolation dampers, door penetrations and associated ductwork will be installed on the 2016 Level of the Control Building in the battery and switchboard rooms.
Four recirculation fans with isolation dampers and associated ductwork will be installed in the ESF switchgear rooms on the 2000 Level of the Control Building The wattage of the Control Room Pressurization heater will be reduced to 5 +/-
1 KW.
Ameren Missouri will revise the Callaway Emergency Operating Procedures to provide instructions for restarting the supplemental cooling system for the case when operation of the supplemental cooling system is desired or needed due to the inoperability of a Class 1 E electrical equipment NC train during or at the onset of an event/accident involving a loss of offsite power.
The planned modifications and procedure revisions will be completed prior to Mode 4 ascending during the Spring 2019 Refueling Outage The following table identifies those actions committed to by Ameren Missouri in this document.
Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.
Commitment Regulatory Commitment Due Date Tracng Number 50428 50429 50430