Summary of (COVID-19) Presubmittal Public Teleconference W/Union Electric Company Postponement of Steam Generator Eddy Current Testing, by One Refueling Outage, for Callaway Plant, Unit No. 1
ML20189A199
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/13/2020
From: Mahesh Chawla
Plant Licensing Branch IV
To:
Union Electric Co
Chawla M
References
EPID L-2020-LRM-0054
Download: ML20189A199 (4)


Text

July 13, 2020 LICENSEE: Union Electric Company FACILITY: Callaway Plant, Unit No. 1

SUBJECT:

SUMMARY

OF JUNE 24, 2020, COVID-19 RELATED PRESUBMITTAL TELECONFERENCE WITH UNION ELECTRIC COMPANY DBA AMEREN MISSOURI REGARDING POSTPONEMENT OF STEAM GENERATOR EDDY CURRENT TESTING, BY ONE REFUELING OUTAGE FOR CALLAWAY PLANT, UNIT NO. 1 (EPID L-2020-LRM-0054)

On June 24, 2020, a Category 1, public meeting was held by teleconference between the U.S. Nuclear Regulatory Commission (NRC) and representatives of Union Electric Company, dba Ameren Missouri (the licensee). The purpose of the meeting was to discuss a planned license amendment request regarding postponement of steam generator eddy current testing, currently scheduled for the upcoming refueling outage starting in the fall of 2020, to the next refueling outage scheduled for the spring of 2022. The meeting notice and agenda, dated June 10, 2020, are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML20163A645. A list of attendees is enclosed.

During the meeting, the licensee presented meeting slides (ADAMS Accession No. ML20170A203), which provided the basis for the request, the technical specification requirements, the inspection scope, an outline of the design features of the steam generators, and the proposed schedule for the project.

Also, during the meeting, the NRC staff asked the licensee to clarify some information regarding the historical performance of the steam generators, the current condition monitoring, the degradation mechanism, and the schedule requirements during the upcoming outage.

The licensees reason for submitting this request is due to the difficulty present in scheduling these activities, to maintain social distancing and observing all the recommended practices needed to maintain the health and safety of the workers, due to the current physical health emergency, COVID-19.

No regulatory decisions were reached at this meeting. No members of the public attended the meeting. No Public Meeting Feedback forms were received.

Please direct any inquiries to me at 301-415-8371, or by e-mail at Mahesh.Chawla@nrc.gov.

/RA/

Mahesh Chawla, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-483

Enclosure:

List of Attendees cc: Listserv

Meeting Notice ML20163A645 Meeting Summary ML20189A199 Meeting Slides ML20170A203 *via e-mail OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DNRL/NCSG/BC*

NAME MChawla PBlechman SBloom DATE 7/06/2020 7/9/2020 7/9/2020 OFFICE NRR/DSS/STSB/BC* NRR/DORL/LPL4/BC* NRR/DORL/LPL4/PM*

NAME VCusumano JDixon-Herrity MChawla DATE 7/10/2020 7/13/2020 7/13/2020 LIST OF ATTENDEES JUNE 24, 2020, [COVID-19] PRESUBMITTAL TELECONFERENCE WITH UNION ELECTRIC COMPANY FOR POSTPONEMENT OF STEAM GENERATOR EDDY CURRENT TESTING AT CALLAWAY PLANT, UNIT NO. 1 U. S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation Division Name Title Mahesh Chawla Project Manager DORL LPL4i Jennifer Dixon-Herrity Branch Chief Steven Bloom Branch Chief Paul Klein Senior Materials Engineer DNRL NCSGii Gregory Makar Materials Engineer Andrew Johnson Materials Engineer DSS STSBiii Clinton Ashley Safety and Plant Systems Engineer James Drake Senior Reactor Inspector Region IV Isaac Anchondo-Lopez Reactor Inspector Union Electric Company dba Ameren Missouri Barry Cox Site Vice President Stephanie Banker Vice President, Engineering Greg Kremer Director, Work Management Roger Wink Manager, Regulatory Affairs Tom Elwood Supervising Engineer, Regulatory Affairs/Licensing David Brownawell Engineer, Regulatory Affairs/Licensing Carissa Richardson Engineer, Steam Generator Program Joseph Howard Engineer, Chemistry Steve Sample Operating Supervisor, Operations Framatome Craig Kelley Tube Integrity Engineer i

DORL LPL4 - Division of Operating Reactor Licensing, Plant Licensing Branch 4 ii DNRL NCSG - Division of New and Renewed Licenses, Chemical Corrosion and Steam Generator Branch iii DSS STSB - Division of Safety Systems, Technical Specifications Branch Enclosure