November 26, 2013, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Union Electric Company (Ameren Missouri) Concerning Requests for Additional Information Pertaining to Callaway, Unit 1, License Renewal A
ML14223A532
Person / Time
Site: Callaway 
Issue date: 08/20/2014
From: Daily J
License Renewal Projects Branch 1
To:
CuadradoDeJesus S, 415-2946
References
TAC ME7708
Download: ML14223A532 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 20, 2014 LICENSEE: Union Electric Company (Ameren Missouri)

FACILITY: Callaway Plant, Unit 1

SUBJECT:

SUMMARY

OF TELEPHONE CONFERENCE CALL HELD ON NOVEMBER 26, 2013, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND UNION ELECTRIC COMPANY (AMEREN MISSOURI),

CONCERNING REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE CALLAWAY PLANT, UNIT 1, LICENSE RENEWAL APPLICATION (TAC. NO. ME7708)

The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on November 26, 2013, to discuss and clarify the applicants technical comment No. 41 on Callaways Safety Evaluation Report with Open Items. The discussion is also associated with Ameren Missouris responses to the staffs requests for additional information concerning the Callaway Plant, Unit 1 license renewal application. provides a listing of the participants and Enclosure 2 contains a description of the staff concerns discussed with the applicant. A brief description on the status of the items is also included.

The applicant had an opportunity to comment on this summary.

/RA/

John W. Daily, Sr. Project Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-483

Enclosures:

1. List of Participants
2. List of Requests for Additional Information cc w/encls: ListServ

ML14223A532 *Concurred via e-mail OFFICE LA:DLR PM:RPB1:DLR BC:RPB1:DLR PM:RPB1:DLR NAME *YEdmonds JDaily YDiaz-Sanabria JDaily DATE 8/14/14 8/20/14 8/20/14 8/20/14

SUMMARY

OF TELEPHONE CONFERENCE CALL CALLAWAY PLANT, UNIT 1 LICENSE RENEWAL APPLICATION LIST OF PARTICIPANTS November 26, 2013 PARTICIPANTS AFFILIATIONS Samuel Cuadrado de Jesús U.S. Nuclear Regulatory Commission (NRC)

James (Jim) Gavula NRC Dave Shafer Union Electric Company (Ameren Missouri)

Sarah Kovaleski Ameren Missouri Eric Blocher STARS Sharon Merciel Ameren Missouri Kenny Blair Ameren Missouri Ed Vaughn Ameren Missouri ENCLOSURE 1

SUMMARY

OF TELEPHONE CONFERENCE CALL CALLAWAY PLANT, UNIT 1 LICENSE RENEWAL APPLICATION November 26, 2013 The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of Union Electric Company (Ameren Missouri or the applicant) held a telephone conference call on November 26, 2013, to discuss and clarify Ameren Missouris technical comment No. 41 on the Safety Evaluation Report (SER) with Open Items and associated response to requests for additional information (RAIs) concerning the Callaway license renewal application (LRA). This was a continuation of the telephone conference call held on November 25, 2013.

Technical Comment No. 41: Flow-Accelerated Corrosion Program Discussion:

By letter dated June 5, 2013, Ameren Missouri provided technical and editorial comments on the staffs SER with Open Items related to the license renewal application of Callaway issued on April 23, 2013. Technical comment No. 41 is associated with the staffs evaluation of the Flow-Accelerated Corrosion Program and it states the following:

In the fourth paragraph on the page, the response to RAI B2.1.7-5a is paraphrased to state that ME-013 had been revised to limit the applicability to operability determinations and evaluations of reduced wall thickness due to corrosion and erosion. The wording in ME-013 does not specify reduced wall thickness due to corrosion and erosion, nor did the response to RAI B2.1.7-5a use this phrase.

The applicant also provided a suggested resolution for this comment by recommending the following change to the SER:

In its response dated November 8, 2012, the applicant stated that it had revised ME-013 to limit the applicability of the use of CMTRs to operability determinations and evaluations of reduced wall thickness due to corrosion and erosion to support continued plant operation until repairs could be implemented.

The staff stated that it had concerns with the applicants suggested resolution because the issues with the Engineering Design Guide ME-013 went beyond the use of certified material test reports (CMTRs). The staff noted that RAI B2.1.7-5a also addressed ME-013s basis for using a 10 percent increase in allowable stresses for wall thickness evaluations. Based on the recommended change, the staff stated that this potentially affected its previous evaluation of the applicants response to RAI B2.1.7-5a, and caused additional questions relating to the use of ME-013 for compliance with the ASME Code and the current licensing basis. Therefore, the staff stated that the applicants suggested revision in comment No. 41 was not acceptable, and the staff will contact the applicant to further discuss the issue and provide the staffs formal position.

Action: A follow-up telephone conference call will be scheduled.

ENCLOSURE 2

SUBJECT:

Summary of Telephone Conference Call conducted on November 26, 2013 DISTRIBUTION:

HARD COPY:

DLR RF E-MAIL:

PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource


JDaily SCuadrado FLyons JGavula YDiaz GPick