Forwards Amend 60 to License DPR-34,safety Evaluation & Technical Evaluation Rept EGG-NTA-7289.Amend Revises Setpoints for Plant Protective Sys to Allow for Instrumentation Error
ML20151A988
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/20/1988
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20151A991 List:
References
TAC-47416, NUDOCS 8807200189
Download: ML20151A988 (4)


Text

,

4 June 20,.1988-i Docket No. 50-267 Mr. R. 0 Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FORT ST VRAIN NUCLEAR GENERATING STATION, AMENDMENT NO. 60 TO FACILITY OPERATING LICENSE NO. DPR-34 (TAC NO. 47416)

The Commission has issued the enclosed Amendment No. 60 to Facility Operating License No. DPR-34 for the Fort St. Vrain Nuclear Generating Station. This amendment consists of changes to the Technical Specifications (TS) in response to your application dated February 8,1988.

The amendment revises certain setpoints for the Plant Protective System to allow for instrumentation errors. The proposed changes have been reviewed by, our contractor, Idaho National Engineering Laboratory (INEL). <

A copy 'of the Safety Evaluation and Notice of Issuance are also enclosed.

The Notice of Issuance will be published in the Federal Recister .

~

The staff and INEL have also identified a series of future actions which Public Service Company of Colorado should pursue. These actions are necessary to fully reflect instrumentation errors in the setpoints contained in the TS.-

We request that you provide us with your current schedule to submit the identi-fied items for staff review. This schedule should be.provided within 45 days of the date of this letter. The information requested in this letter affects fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511. .

Sincerely, Kenn/s/eth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosures:

l So 1. Amendment No. 60 to DPR-34 oNo 2. Safety Evaluation

$8' 3. Technical Evaluation Report l

, @@ 4. Notice of Issuance 0{\

l 20 cc / enclosures: L g

om a next page 58 D,STRIBUTION: i oc \ pocket File JPartlow NRC PDR TBarnhart(4) l 8" Local PDR Wanda Jones PD4 Reading EButcher  !

h ma PNoonan(3)

JCalvo ACRS (10)

ARM /LFMB KHeitner OGC-Rockville GPA/PA DHaoan 1

"" EJordan S. Newberry Plant File

~

j

.PD4/L PD4/PM N N SI (D c ville PD4/D//N PNoon KHeitner:sr S erry Adeneer

/ JCalvo i 05 @ 88 05/tt/88 h/88 $/[/88

I 4

i June 20,1988 p

Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuciaar Operations Public Service Company of Colorade Post Office Box 840 Cenver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FORT ST. VRAIN NUCLEAR GENERATING STATION AMENDMENT NO. 60 TOFACILITYOPERATINGLICENSENO.DPR-34fTACNO.47416)

The Comission has issued the enclosed Amendment No. 60 to Facility Operating License No. DPR-34 for the Fort St. Vrain Nuclear Generating Station. This amendment consists of changes to the Technical Specifications (TS) in response to your application dated February 8,1988.

The amendment revises certain setpoints for the Plant Protective System to allow for instrumentation errors. The proposed changes have been revnwed by our contractor, Idaho National Engineering Laboratory (INEL).

A copy of the Safety Evaluation and Notice of Issuance are also enclosed.

The Notice of Issuance will be published in the Federal Register .

The staff and INEL have also identified a series of future actions which Public Service Company of Colorado should pursue. These actions are necessary to fully reflect instrumentation errors in the setpoints contained in the TS.

We request that you provide us with your current schedule to submit the identi-fied iters for staff review. This schedule should be provided within 45 days of the date of this letter. The information requested in this letter affects fewer than 10 respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely, Kenn/s/

eth L. Heitner, Project Manager Project Directorate - IV 1

Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosures:

1. Amendment No. 60 to DPR-34
2. Safety Evaluation i
3. Technical Evaluation Report
4. Notice of Issuance ec w/ enclosures:

See next page 1 DISTRIBUTION: '

Docket File JPartlow NRC PDR TBarnhart(4)

Local PDR Wanda Jones PD4 Reading EButcher PNoonan(3) ACRS (10) KHeitner GPA/PA JCalvo ARM /LFMB OGC-Rockville DHagan EJordan S. Newberry Plant Fi PD4/L b; PD4/PM I b SI ille PD4/D [/fd PNoon KHeitner:sr S erry w/ JCalvo 05 $ 88 05/tt/88 h/89 QI/[/88 g i

  • 4 l

[

3- -

%>o#

t, UNITED STATES NUCLEAR REGULATORY COMMISSION j

1L j wAssiNoToN. o. c. 20sss o f

, June 20, 1988 Docket No. 50-267 Mr. R. O. Williams, Jr.

Vice President, Nuclear Operations Public Service Company of Colorado Post Office Box 840 Den',er, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

FORT ST. VRAIN NUCLEAR GENERATING STATION, AMENDMENT NO.

TO FACILITY CPERATING LICENSE NO. DPR-34 (TAC NO. 47416) 60 The Comissien has issued the enclosed Arendment No.60 to Facility Operating License No, OPP-34 for the Fort St. Vrain Nuclear Generating Station. This amendrcent consists of changes to the Technical Specifications (TS) in response to ycur application dated February 8, 1988.

The amend. tent revists certain setpoints for the ulent Protective Syster t, aller for instrumentation errors. The proposed changes have been reviewed by our contractor, Idaho National Engineering Laboratory (INEL).

A copy of the Safety Evaluation and hotice of Issuance are also enclosed.

The Notice of Issuance will be published in the Federal Register .

The staff and INEL have also identified a series of future actions which Public Service Company of Colorado should pursue. These actions are necessary to fully reflect instrurrentation errors in the setpoints contained in the TS.

We request that you provide us with your current schedule to submit the identi-fied items for staff review. This schedule should be provided vithin 4E days of the date of this letter. The infomation requested in this letter affects fewer than 10 respendents; therefore, CMB clearance is not required under P.L.06-511.

Sincerely, Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosures:

1. Amendment No. 60 to DPR-34
2. Safety Evaluation
3. Technical Evaluation Report
4. Notice of Issuance cc w/ enclosures:

See next page t

o i I t . '

Mr. 9. O. Williams, Jr.

Public Service Company of Colorado Fort St. Vrain cc:

Mr. D. W. Warembourg, Manager Albert J. Hazle, Director '

Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201-0840 Mr. David Alberstein, 14/159A Mr. R. O. Williams, Jr. , Acting Manager GA Technologies, Inc. ,

Nuclear Production Division l Post Office Box 85668 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80661 Mr. H. L. Brey, Manager Nuclear Licensing ;nd Fuel Division Mr. P. F. Tomlinson, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado 80201-0840 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Comissien Mr. R. F. Walker P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Kelley, Stansfield & 0'Donnell Public Service Company Building Commitment Control Program l Room 900 Coordinator l 550 15th Street Public Service Company of Colorado l Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-0  !

Denver, Colorado 80211 .

l Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 l

Cheirvan, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413