Forwards Application for Amend to License DPR-34,changing Plant Protective Sys Trip Setpoints & Surveillance Requirements.Summary of Proposed Changes & Comments on Draft SER Also Encl.Fee Paid
ML20210S326
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 05/15/1986
From: Walker R
PUBLIC SERVICE CO. OF COLORADO
To: Berkow H
Office of Nuclear Reactor Regulation
Shared Package
ML20210S328 List:
References
P-86279, TAC-47416, NUDOCS 8605210170
Download: ML20210S326 (3)


Text

- . .

N I

c_,2;~Jc _

O Public Service ~ Iiendr7cYeo201-os40 May 15, 1986 Fort St. Vrain R. F. WALKER PRESIDENT Unit No. 1 P-86279 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 Attn: Mr. H.N. Berkow, Director Standardization and Special Projects Directorate Docket No. 50-267

SUBJECT:

Technical Specification Change Request to the Plant Protective System Trip Setpoints

REFERENCE:

1) PSC Letter, Lee to Johnson, Dated June 21, 1985 (P-85214)
2) NRC Le+ cer, Berkow to Walker, Dated January 24, 1986 (G 'A053)

Dear Mr. Berkow:

Public Service Company of Colorado (PSC) submitted by letter dated June 21, 1985 (Reference 1), an amendment request to the Fort St.

Vrain (FSV) Technical Specifications on the Plant Protective System (PPS) Trip Setpoints and Surveillance Requirements. The amendment request was based on re-analyses of the trip setpoints to include consideration for instrumentation uncertainties.

The NRC staff, by letter dated January 24, 1986 (Reference 2),

addressed the results of their review of FSV's amendment request and recommended that an amendment to the existing Technical Specifications be submitted to incorporate those setpoints found acceptable.

PSC is submitting in the following attachments the NRC's requested Technical Specification changes fe:- the FSV PPS trip setpoints and comments on the NRC's draft safety evaluation report (SER). PSC's comments on the SER are editorial in nature and are noted as a markup to the " Draft" SER.

i 8605210170 860515 PDR ADOCK 05000267 PDR 00 \

P khO

y _

, P-86279 May 15, 1986 4

Attachment 1: Summary of proposed changes to the existing FSV Technical Specifications.

Attachment 2: Proposed changes to LSSS 3.3 and LC0 4.4.1 of the FSV Technical Specifications.

Attachment 3: PSC's editorial markups on the NRC's Draft Safety Evaluation Report.

The Significant Hazards Consideration submitted in the amendment application of Reference 1 remains applicable to this application addenda. Therefore, a separate Significant Hazards Consideration is not being included with this amendment request.

In accordance with the provisions of 10CFR170, an application fee of

$150.00 was sent in Reference 1. Since this amendment request is an addenda to the original application, an additional $150.00 application fee is not being enclosed.

A 180 day period after i.pproval of these revisions by the Commission is requested before the revised sections are incorporated into the FSV Technical Specifications. The 180 day period is required by PSC to revise the System Operating Procedures, computer software, Plant Protective System daily log sheets, the Surveillance Procedures, the

. Emergency Procedures, the Technical Specification Compliance Log, and the Overall Plant Operating Procedures. This time is'also required to retrain all licensed personnel.

PSC recognizes from past commitments that we still owe the NRC staff the results of the additional analyses and trip setpoint justification for the PPS parameter, programmed feedwater flow-low.

While this parameter is not currently in the existing Technical Specifications, we do plan to incorporate it into the overall Technical Specification Upgrade Program. PSC will be submitting the results of the analyses and trip setpoint justification for your information and review, under a separate cover letter, in the very near future.

Should you have any questions concerning this matter, please contact Mr. M.H. Holmes at (303) 480-6960.

Very truly yours, k.Y(k)dLYllr R.F. Walker President RFW/JS:jmt

s UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In.the Matter )

)

Public Service Company of Colorado ) Docket No. 50-267 Fort St. Vrain Unit No. 1 )

AFFIDAVIT R. F. Walker, being first duly sworn, deposes and says; That he is President of Public Service Company of Colorado, the Licensee herein; that he has read the foregoing Application of Amendment to Appendix A of Facility Operating License and knows the contents thereof, and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

.T. W ur

  • R. F. Walker President STATE OF (d d )

)

COUNTY OF /)04.ou/ )

Subscribe 9and sworn to before me, a Notary Public on this

/ft/d day of 6 , 1986.

/

a]SLU Notary Public My commission expires (d * /' d 8 , 193_7