Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Results
Other: ML20028E327, ML20072P134, ML20087E615, ML20112J098, ML20136F665, ML20149M290, ML20151B003, ML20154B806, ML20154B813, ML20155E842, ML20195B498, ML20195B548, ML20209F446, ML20210B061, ML20210S419, ML20211P829, ML20214P575, ML20235B009
|
MONTHYEARML19347C0651980-10-0101 October 1980 Forwards Application for Amend of License DPR-34,changing Tech Specs 2.0 & Tables 3.3.1 & 4.4-1 Through 4.4-4 to Revise Instrument Setpoints Project stage: Request ML19347C0701980-10-0101 October 1980 Application for Amend of License DPR-34,changing Tech Specs 2.0 & Tables 3.3.1 & 4.4-1 Through 4.4.4 to Revise Instrument Setpoints Project stage: Request ML19347C0731980-10-0101 October 1980 Proposed Changes to Tech Specs 2.0 & Tables 3.3.1 & 4.4-1 Through 4.4-4,revising Instrument Setpoints.Supporting Documentation Encl Project stage: Request ML20028E3271983-01-14014 January 1983 Requests Technical Assistance W/Proposed Tech Spec Setpoint Revs Requested by Util.Region Will Provide Assistance,Act as Contact Between NRR & Util & Process & Issue Change.Nrr Will Review Request & Issue Ser.W/O Encl Project stage: Other ML20072P1341983-07-11011 July 1983 Proposed Tech Spec Changes Assuring Operability of Plant Protective Sys Limiting Conditions for Operation Defining Trip Setpoint Operability Project stage: Other ML20087E6151984-02-17017 February 1984 Rev a to Work Spec WS-93-0004, Reevaluation of Plant Protection Sys Setpoints Project stage: Other ML20087E5941984-03-0909 March 1984 Forwards Rev a to Work Spec WS-93-0004, Reevaluation of Plant Protection Sys Setpoints, as Result of 831027 Agreement to Revise Previous Application for Amend to Tech Specs Project stage: Request ML20112J0981985-03-18018 March 1985 Advises That Setpoint Reevaluation Program & Tech Spec Update Program Adopted.Proposed Amend to License DPR-34 for Plant Protective Sys Setpoints Will Be Submitted on or Before 850501 Project stage: Other ML20127P1071985-06-21021 June 1985 Advises That Util 850607 Submittal Re Draft Tech Specs for Control Rod Operability Acceptable Provided That Listed Changes Made.Confirmatory Submittal by Licensee of Revised Draft Tech Specs Should Be Provided Prior to Restart Project stage: Request ML20209F4231985-06-21021 June 1985 Forwards Application for Amend to License DPR-34,revising Tech Specs Re Limiting Conditions for Operation of Protective Sys Instrument Setpoints & Allowable Values Project stage: Request ML20209F4401985-06-21021 June 1985 Application for Amend to License DPR-34,revising Tech Specs Re Limiting Conditions for Operation of Protective Sys Instrument Setpoints & Allowable Values.Fee Paid Project stage: Request ML20209F4461985-06-21021 June 1985 Proposed Tech Specs Re Limiting Conditions for Operation of Protective Sys Instrument Setpoints & Allowable Values Project stage: Other ML20136F6651985-12-31031 December 1985 Informs of Continuation of Reviews Re Allowable Value & Trip Setpoint.Tech Spec Changes Submitted in .After Acceptable Margin Established Analyses Will Be Performed. Tech Spec Change Request Will Be Submitted by 860401 Project stage: Other ML20137P8021986-01-24024 January 1986 Forwards Draft Safety Evaluation Re 850621 Request to Change Tech Specs on Plant Protection Sys Instrumentation Setpoints.Resubmittal of Proposed Tech Specs to Reflect Acceptable Setpoints Requested within 45 Days Project stage: Draft Approval ML20140F8271986-03-25025 March 1986 Ack Receipt of NRC Re Proposed Tech Spec Change Request for Plant Protective Sys Trip Setpoints.Reevaluation of Basis & Analyses for Setpoint Justification for Fixed Feedwater Flow Low Parameter in Progress Project stage: Request ML20155E8421986-04-14014 April 1986 Advises That Addl Time Required to Fully Integrate Tech Spec Changes Re Plant Protection Sys Setpoints Into Existing Format.Tech Spec Amend Request Will Be Submitted by 860516 Project stage: Other ML20210S3261986-05-15015 May 1986 Forwards Application for Amend to License DPR-34,changing Plant Protective Sys Trip Setpoints & Surveillance Requirements.Summary of Proposed Changes & Comments on Draft SER Also Encl.Fee Paid Project stage: Draft Request ML20210S3291986-05-15015 May 1986 Application for Amend to License DPR-34,changing Plant Protective Sys Trip Setpoints & Surveillance Requirements Project stage: Request ML20210S4191986-05-15015 May 1986 Proposed Tech Specs,Changing Plant Protective Sys Trip Setpoints & Surveillance Requirements Project stage: Other ML20211P8291986-07-18018 July 1986 Ack Receipt of Re Plant Protective Sys Setpoints. Item Under Review w/860930 Target Completion Date Project stage: Other ML20211E0111986-10-16016 October 1986 Forwards Request for Addl Info Re NRC Review of Util Info on Plant Protective Sys Trip Setpoints & Surveillance Requirements Against Draft Safety Evaluation Forwarded on 860124 Project stage: Draft Approval ML20214P5751986-11-26026 November 1986 Recommends That Util Propose Tech Specs Based on Annual Allowable Values Re Plant Protective Sys Trip Setpoints. Response Requested within 60 Days of Ltr Date Project stage: Other ML20210B0611987-04-27027 April 1987 Requests That Submittal of Plant Protective Sys Setpoint Info Be Deferred Until 870831,in Response to NRC . Delay Due to Recent Efforts Focusing on Plant Restart Issues Project stage: Other ML20235A9971987-08-28028 August 1987 Forwards Response to NRC 861016 Request for Addl Info on Util 850621 & 860515 Requests for Amend to Tech Specs Re Trip Setpoints & Operating Requirements.Proposed Tech Specs Also Encl Project stage: Request ML20235B0091987-08-28028 August 1987 Proposed Tech Specs Re Trip Setpoints & Operating Requirements Project stage: Other ML20235R4161987-10-31031 October 1987 Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station Project stage: Draft Other ML20235V8871987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept Project stage: Draft Other ML20236V3191987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept Project stage: Draft Other ML20236V2941987-11-25025 November 1987 Forwards Draft EGG-NTA-7289, Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept.Discussion of Encl Draft W/Nrc at 871202 Meeting Proposed ML20237D6921987-12-15015 December 1987 Summary of 871203 Meeting W/Util & Inel Re Protective Sys Setpoints in Tech Specs.List of Meeting Attendees Encl Project stage: Meeting ML20149M2731988-02-0808 February 1988 Forwards Application for Amend to License DPR-34,revising Tech Specs on Plant Protective Sys Trip Setpoints & Operating Requirements Project stage: Request ML20149M2851988-02-0808 February 1988 Application for Amend to License DPR-34,revising Tech Specs Re Plant Protective Sys Trip Setpoints & Operating Requirements Project stage: Request ML20149M2901988-02-0808 February 1988 Proposed Tech Spec Re Plant Protective Sys Trip Setpoint & Operating Requirements Project stage: Other ML20151B0031988-03-31031 March 1988 Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept Project stage: Other ML20154B8061988-04-28028 April 1988 Forwards Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing Re 880208 Application Concerning Setpoints for Plant Protective Sys Project stage: Other ML20154B8131988-04-28028 April 1988 Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing.Amend Modifies Setpoints Used in Plant Protective Sys Project stage: Other ML20195B4981988-06-0303 June 1988 Forwards Notice of Environ Assessment & Finding of No Significant Impact Re Util 880208 Application Concerning Setpoints for Plant Protective Sys Project stage: Other ML20195B5481988-06-0303 June 1988 Notice of Environ Assessment & Finding of No Significant Impact Re Util 880208 Proposed Revised Setpoints for Plant Protective Sys to Allow for Administrative Errors.Commission Has Decided Not to Prepare EIS Project stage: Other ML20151A9881988-06-20020 June 1988 Forwards Amend 60 to License DPR-34,safety Evaluation & Technical Evaluation Rept EGG-NTA-7289.Amend Revises Setpoints for Plant Protective Sys to Allow for Instrumentation Error Project stage: Approval 1986-04-14
[Table View] |
Text
-
June 3,'1988 a j}.
r
- 3_
Docket No.. '50-267 m
(l.
Mr. R. 0, Willians, Jr.
Vice President, haclear Operations I
Public Service Corpar.y of Colorado-Post 0ffice Box 840 Denver, Colorado 30MI-0840
?:
Dear Mr. Williams:
I
SUBJECT:
ENVIRONMEM (L ASSESSMENT AND FINDING 0F NO SIGNIFICANT IMPACT l
- FORT ST. VRAIN NUCLEAR GENERATING STATION
,y Enclosed is a copy or the "Environrnental Assessment and F,ading of No Significant Impact". This notice relates to your application dated February 8, 1988 (P-88025) relating to set points for the Plant Protective System.
This notice is being forwarded to the Office ~ of the Federal Register for publication.
Sincerely,
.)
/s/
Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects
Enclosure:
As stated p;
cc w/ enclosure:
See next page
. DISTRIBUTION EDocketFilej)
NRC PDR Local PDR PD4 Reading L. Rubenstein J. Calvo P. Noonan K..Heitner OGC-Rockville E. Jordan J. Partlow ACRS (10)
GPA/PA P"4 Plant File J
JCalvo [p%
PDIV:LA PDIV:PM OGC-Roc iple PDIV:D PNoonan b VHeitner:kab d ctw..
y 05/0/88 05/j 3/88 05/g/88 44B&/3 /88 j
k$j62jg36080603 K 0%O0267 P
PDR l
)
~
m
y-I June 3, 1988,
fi y
j' I
i, V
Docket No. 50-267 ti 1
Mr. R. O. Williams, Jr.
Vice President, Nuclear Oper *:icos f
Public Service Company of Colarado N
Post Office Box 840
.l
, ),,
Denver, Colorado 80201-020 i
n Dear Mr. Wil11aus.
s
SUBJECT:
ENVIRONFsNTALASSESSMENTAND,FINDINGOFNOSIGNIFICANTIM9'.CT \\
- FORT 51~. VRAIN NUCLEAR GENh?.ATING STATION
\\
I Enclosed is a copy cf the "Environmental Assessmetic'snd Finding of No Significant Impact", Yhis notice relates to yotir'appili.atIon dated February P,'
(
1988 (P-880?5) relating to set points for the P(ant Protective System.
This notice is being forwarded to the Office of the. Federal Mdister for
/ i i
publication.
Y
,p
~
w a;
s.,
i'
/
Sincerely, I
\\'
/s/
Kenneth L. Heitner, Project tianager p'
x Project Direct. orate s Y 1
Division of Reaktiv Trcjects - III, IV, V and Special Projects
\\
Encles ge: I i
As stated
)
y cc w/encle'sure:
h l
See next page
)
s I
i
(
DISTRIBUTION e
i Docket File NRC PDR Local PDR PD4 Reading s
L. Rubenstein J. Calvo P. Raonan K. Heitner OGC-Rockville E. Jordan J. Partlow ACRS (10) l GPA/PA PD4 P14nt File l
-\\
PDIV:LA PDIV:PM OGC-RocMiAle
,PDIV'.D 7%
PNoonan W KHeitner:kab i t.k U
'JCalvo 05/g,/88 (
608F/3/88 05/0/88 05/i? /88
/
u s.
e, Is
~,
t i
\\
1
x jf'.......'o,.
UNITED STATES s
NUCLEAR REGULATORY COMMISSION 3
.i WASHINGT ON, D. C. 20655 t
e
%...../
June 3 1988 1
Docket No. 50-267
?
Mr. R. O. Wi i. iams, Jr.
Vice President,lluclear Operations Public Service Company of Colorado Post Office Box 840 Denver, Colorado 80201-0840 De.ar Mr. Williams:
SUBJECT:
ENVIPONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT
- FORT ST. VRAIN NUCLEAR GENERATING STATION Enclosed is a copy of the "Environmental Assesse.ent and Finding of No Significant Impact". This notice relates to your application dated February 8, 1988 (P-88025) relating to set points for the Plant Protective System.
This notice is being forwarded to the Office of the Federal Register for publication.
l l
Sincerely, h~.
\\ [.N Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects
Enclosure:
As stated cc w/ enclosure:
See next page
f
/
\\
s Mr. R. O. Williams, Jr.
Public Service Company of Colorado Fort St.,Vrair CC:
Mr. D. W. Warembourg, Manager Albert J. Vazle, Director Nuclear Engineering Division Rad 9 tion Control Division Publid Service C spany
, Department of Health of Colorado 1210, East lith Avenue
~
P. O. Box 840
, ' Denver, Colorado 80220
,Cenver, Colorado 80201-0840 Mr. David Alberstein /M/159A Mr. R. O. Williams, Jr., Acting Manager GA Technologies, Inc.
Nucledr Production Division Post Office Box 856'/8 (
Public Service Company of Colorado San Diego, Cafffornia 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. prey, Manager Nuclear L) censing and Fuel Division Mr. P. F. Tomlinson, Manager Public Service Company of Colorado
/
Ouality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado 80201-0840 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Comission Mr. R. F. Walker P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Stansfield & 0'Donnell Public Service Company Building Comitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado' 80202 2420 W. 26th Ave.iSuite 100-D i
Denver, Colcredo 80211 1
Regional Adm;cistrator, Region IV i
a U.S. Nuclece Regulatory Comission 611,R y,, Plaza Drive, Suite 1000 Arlington,'exas 76011 Chairmar, Board of County Comissioners of Welq County, Colorado Greeley,Golorado 80631 3
Regional $epresentative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 3
I Denver, Coloradv 80202-2413 s
t i
--.