Letter Sequence Other |
---|
|
Results
Other: ML20072P134, ML20087E615, ML20112J098, ML20136F665, ML20149M290, ML20151B003, ML20154B806, ML20154B813, ML20155E842, ML20195B498, ML20195B548, ML20209F446, ML20210B061, ML20210S419, ML20211P829, ML20214P575, ML20235B009
|
MONTHYEARML20072P1341983-07-11011 July 1983 Proposed Tech Spec Changes Assuring Operability of Plant Protective Sys Limiting Conditions for Operation Defining Trip Setpoint Operability Project stage: Other ML20087E6151984-02-17017 February 1984 Rev a to Work Spec WS-93-0004, Reevaluation of Plant Protection Sys Setpoints Project stage: Other ML20087E5941984-03-0909 March 1984 Forwards Rev a to Work Spec WS-93-0004, Reevaluation of Plant Protection Sys Setpoints, as Result of 831027 Agreement to Revise Previous Application for Amend to Tech Specs Project stage: Request ML20112J0981985-03-18018 March 1985 Advises That Setpoint Reevaluation Program & Tech Spec Update Program Adopted.Proposed Amend to License DPR-34 for Plant Protective Sys Setpoints Will Be Submitted on or Before 850501 Project stage: Other ML20209F4231985-06-21021 June 1985 Forwards Application for Amend to License DPR-34,revising Tech Specs Re Limiting Conditions for Operation of Protective Sys Instrument Setpoints & Allowable Values Project stage: Request ML20209F4401985-06-21021 June 1985 Application for Amend to License DPR-34,revising Tech Specs Re Limiting Conditions for Operation of Protective Sys Instrument Setpoints & Allowable Values.Fee Paid Project stage: Request ML20209F4461985-06-21021 June 1985 Proposed Tech Specs Re Limiting Conditions for Operation of Protective Sys Instrument Setpoints & Allowable Values Project stage: Other ML20127P1071985-06-21021 June 1985 Advises That Util 850607 Submittal Re Draft Tech Specs for Control Rod Operability Acceptable Provided That Listed Changes Made.Confirmatory Submittal by Licensee of Revised Draft Tech Specs Should Be Provided Prior to Restart Project stage: Request ML20136F6651985-12-31031 December 1985 Informs of Continuation of Reviews Re Allowable Value & Trip Setpoint.Tech Spec Changes Submitted in .After Acceptable Margin Established Analyses Will Be Performed. Tech Spec Change Request Will Be Submitted by 860401 Project stage: Other ML20137P8021986-01-24024 January 1986 Forwards Draft Safety Evaluation Re 850621 Request to Change Tech Specs on Plant Protection Sys Instrumentation Setpoints.Resubmittal of Proposed Tech Specs to Reflect Acceptable Setpoints Requested within 45 Days Project stage: Draft Approval ML20140F8271986-03-25025 March 1986 Ack Receipt of NRC Re Proposed Tech Spec Change Request for Plant Protective Sys Trip Setpoints.Reevaluation of Basis & Analyses for Setpoint Justification for Fixed Feedwater Flow Low Parameter in Progress Project stage: Request ML20155E8421986-04-14014 April 1986 Advises That Addl Time Required to Fully Integrate Tech Spec Changes Re Plant Protection Sys Setpoints Into Existing Format.Tech Spec Amend Request Will Be Submitted by 860516 Project stage: Other ML20210S3261986-05-15015 May 1986 Forwards Application for Amend to License DPR-34,changing Plant Protective Sys Trip Setpoints & Surveillance Requirements.Summary of Proposed Changes & Comments on Draft SER Also Encl.Fee Paid Project stage: Draft Request ML20210S3291986-05-15015 May 1986 Application for Amend to License DPR-34,changing Plant Protective Sys Trip Setpoints & Surveillance Requirements Project stage: Request ML20210S4191986-05-15015 May 1986 Proposed Tech Specs,Changing Plant Protective Sys Trip Setpoints & Surveillance Requirements Project stage: Other ML20211P8291986-07-18018 July 1986 Ack Receipt of Re Plant Protective Sys Setpoints. Item Under Review w/860930 Target Completion Date Project stage: Other ML20211E0111986-10-16016 October 1986 Forwards Request for Addl Info Re NRC Review of Util Info on Plant Protective Sys Trip Setpoints & Surveillance Requirements Against Draft Safety Evaluation Forwarded on 860124 Project stage: Draft Approval ML20214P5751986-11-26026 November 1986 Recommends That Util Propose Tech Specs Based on Annual Allowable Values Re Plant Protective Sys Trip Setpoints. Response Requested within 60 Days of Ltr Date Project stage: Other ML20210B0611987-04-27027 April 1987 Requests That Submittal of Plant Protective Sys Setpoint Info Be Deferred Until 870831,in Response to NRC . Delay Due to Recent Efforts Focusing on Plant Restart Issues Project stage: Other ML20235A9971987-08-28028 August 1987 Forwards Response to NRC 861016 Request for Addl Info on Util 850621 & 860515 Requests for Amend to Tech Specs Re Trip Setpoints & Operating Requirements.Proposed Tech Specs Also Encl Project stage: Request ML20235B0091987-08-28028 August 1987 Proposed Tech Specs Re Trip Setpoints & Operating Requirements Project stage: Other ML20236V3191987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept Project stage: Draft Other ML20235V8871987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept Project stage: Draft Other ML20235R4161987-10-31031 October 1987 Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station Project stage: Draft Other ML20236V2941987-11-25025 November 1987 Forwards Draft EGG-NTA-7289, Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept.Discussion of Encl Draft W/Nrc at 871202 Meeting Proposed ML20237D6921987-12-15015 December 1987 Summary of 871203 Meeting W/Util & Inel Re Protective Sys Setpoints in Tech Specs.List of Meeting Attendees Encl Project stage: Meeting ML20149M2731988-02-0808 February 1988 Forwards Application for Amend to License DPR-34,revising Tech Specs on Plant Protective Sys Trip Setpoints & Operating Requirements Project stage: Request ML20149M2851988-02-0808 February 1988 Application for Amend to License DPR-34,revising Tech Specs Re Plant Protective Sys Trip Setpoints & Operating Requirements Project stage: Request ML20149M2901988-02-0808 February 1988 Proposed Tech Spec Re Plant Protective Sys Trip Setpoint & Operating Requirements Project stage: Other ML20151B0031988-03-31031 March 1988 Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept Project stage: Other ML20154B8061988-04-28028 April 1988 Forwards Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing Re 880208 Application Concerning Setpoints for Plant Protective Sys Project stage: Other ML20154B8131988-04-28028 April 1988 Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing.Amend Modifies Setpoints Used in Plant Protective Sys Project stage: Other ML20195B4981988-06-0303 June 1988 Forwards Notice of Environ Assessment & Finding of No Significant Impact Re Util 880208 Application Concerning Setpoints for Plant Protective Sys Project stage: Other ML20195B5481988-06-0303 June 1988 Notice of Environ Assessment & Finding of No Significant Impact Re Util 880208 Proposed Revised Setpoints for Plant Protective Sys to Allow for Administrative Errors.Commission Has Decided Not to Prepare EIS Project stage: Other ML20151A9881988-06-20020 June 1988 Forwards Amend 60 to License DPR-34,safety Evaluation & Technical Evaluation Rept EGG-NTA-7289.Amend Revises Setpoints for Plant Protective Sys to Allow for Instrumentation Error Project stage: Approval 1986-05-15
[Table View] |
|
---|
Category:FEDERAL REGISTER NOTICES
MONTHYEARML20202D6581997-12-0404 December 1997 Notice Informing of Closing of Local Public Document Room Records Re Ft St Vrain Nuclear Generating Station Located at Weld Library District,Lincoln Park Branch,Greeley,Co, Effective 971221 ML20141C8761997-05-0505 May 1997 Notice of Issuance of License Amend for Psc,Fort St Vrain Re Redesignated Approved Decommissioning Plan,Approved Suppl to Environ Rept & Approved Final Radiation Survey Plan as License Termination Plan ML20136D6171997-03-0404 March 1997 Notice of Receipt of PSC Decommissioning/Termination Plan for Plant ML20134G2641996-11-0505 November 1996 Notice of Public Meeting W/Psc on Decommissioning & License Termination of Fsv in Plattville,Co ML20059C1431990-08-27027 August 1990 Notice of Consideration of Issuance of Amend to License DPR-34 & Proposed NSHC Determination & Opportunity for Hearing.Amend Reflects Reduction in Scope to Cover Only Storage of Spent Fuel in Physical Security Plan ML20196B7581988-06-20020 June 1988 Notice of Issuance of Amend 60 to License DPR-34.Amend Revised Certain Setpoints for Plant Protective Sys to Allow for Instrumentation Errors ML20154B8131988-04-28028 April 1988 Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing.Amend Modifies Setpoints Used in Plant Protective Sys ML20237A9571987-12-0808 December 1987 Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Prior Hearing on 871001 Request Re Design of Effluent Monitor & Switches & Time Allowed to Rept Inoperable Noble Gas Monitor ML20138R2231985-12-23023 December 1985 Notice of Consideration of Issuance of Amend to License DPR-34 & Proposed NSHC Determination.Amend Changes Tech Specs to Delete Ref to Snubber Type,Allowing Licensee to Change or Modify Snubbers Under 10CFR50.59 ML20138R6381985-09-30030 September 1985 Notice of Amend to 10CFR50 Stating That Authority & Responsibility for Implementing NRC Nuclear Reactor Licensing Program Concerning Plant Will Be Transferred from Region IV to NRR ML20244A6591979-04-20020 April 1979 Notice of Issuance & Availability of Amend 20 to License DPR-34 1997-05-05
[Table view] Category:TEXT-CODE OF FEDERAL REGULATIONS
MONTHYEARML20202D6581997-12-0404 December 1997 Notice Informing of Closing of Local Public Document Room Records Re Ft St Vrain Nuclear Generating Station Located at Weld Library District,Lincoln Park Branch,Greeley,Co, Effective 971221 ML20141C8761997-05-0505 May 1997 Notice of Issuance of License Amend for Psc,Fort St Vrain Re Redesignated Approved Decommissioning Plan,Approved Suppl to Environ Rept & Approved Final Radiation Survey Plan as License Termination Plan ML20136D6171997-03-0404 March 1997 Notice of Receipt of PSC Decommissioning/Termination Plan for Plant ML20134G2641996-11-0505 November 1996 Notice of Public Meeting W/Psc on Decommissioning & License Termination of Fsv in Plattville,Co ML20059C1431990-08-27027 August 1990 Notice of Consideration of Issuance of Amend to License DPR-34 & Proposed NSHC Determination & Opportunity for Hearing.Amend Reflects Reduction in Scope to Cover Only Storage of Spent Fuel in Physical Security Plan ML20196B7581988-06-20020 June 1988 Notice of Issuance of Amend 60 to License DPR-34.Amend Revised Certain Setpoints for Plant Protective Sys to Allow for Instrumentation Errors ML20154B8131988-04-28028 April 1988 Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing.Amend Modifies Setpoints Used in Plant Protective Sys ML20237A9571987-12-0808 December 1987 Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Prior Hearing on 871001 Request Re Design of Effluent Monitor & Switches & Time Allowed to Rept Inoperable Noble Gas Monitor ML20138R2231985-12-23023 December 1985 Notice of Consideration of Issuance of Amend to License DPR-34 & Proposed NSHC Determination.Amend Changes Tech Specs to Delete Ref to Snubber Type,Allowing Licensee to Change or Modify Snubbers Under 10CFR50.59 ML20138R6381985-09-30030 September 1985 Notice of Amend to 10CFR50 Stating That Authority & Responsibility for Implementing NRC Nuclear Reactor Licensing Program Concerning Plant Will Be Transferred from Region IV to NRR ML20244A6591979-04-20020 April 1979 Notice of Issuance & Availability of Amend 20 to License DPR-34 1997-05-05
[Table view] |
Text
.. . . . .- .
. ,1 7590.-01 UNITED STATES NUCLEAR REGULATORY C0i44ISSION PUBLIC SERVICE COMPANY OF COLORADO DOCKET NO. 50-267
~ ~
NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE AND OPPORTUNITY FOR HEARING The United States Nuclear Regulatory Comission (the Comission) is considering issuance of an amendment to Facility Operating License No. DPR-34, issuedtoPublicServiceCompanyofColorado(thelicensee),foroperationof theFortSt.VrainNuclearGeneratingStation(FSV)locatedinWeldCounty, i Colorado.
The amendment would modify the setpoints used in the FSV Plant Protective
( ' System (PPS). It would bring the method of determining those setpoints into compliance with IST Standard S67.04-1982, "Setpoints for Nuclear Safety-Related Instrumentation Used in Nuclear Power Plants". The licensee has sumarized this matter in Attachment 3 to the amendment application, dated February 8,1988(P-88025).
The methodology developed by the licensee allows the PPS instrumentation setpoints to account for potential inaccuracies in the instrumentation.
Inaccuracies can arise frori several factors. These are:
- Accuracy of components not tested when the setpoint is measured M
P l - - . - _.
7-
- Accuracy of test equipment, and
- Environmental effects on equipment accuracy.
A separate safety evaluation has been provided for each parameter in the proposed Technical Specification changes. These are:
- Primary Coolant Pressure - High and Low
- Low Superheat Header Temperature and High Differential Tempera'ture --
between Loop 1 and Loop 2
- Circulator Speed Low
- Loss of Circulator Bearing Water and
- CirculatorSpeedHigh-Steam (Drive)
Prior to issuance of the proposed license amendment, the Comission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Comission's regulations.
By June 8,1988 , the licensee may file a request for a hearing with respect to issuance of the amendment to the subject facility operating l
i license and any person whose interest may be affected by this proceeding and who wishes to participate as a party in the proceeding must file a written request for a hearing and a petition for leave to intervene. Requests for a hearing and petitions for leave to intervene shall be filed in accordance with the Comission's "Rules of Practice for Domestic Licensing Proceedings" in 10 CFR Part 2. If a request for a hearing or petition for leave to intervene is filed by the above date, the Comission or an Atomic Safety and Licensing Board, designated by the Cocinission or by the Chaiman of the Atomic Safety and Licensing Board Panel, will rule on the request and/or petition, and the Secretary or the designated Atomic Safety and Licensing Board will issue a notice of hearing or an appropriate order.
As required by 10 CFR 62.714, a petition for leave to intervene shall set forth' with particularity the interest of the petitioner in the proceeding, and how that interest may be affected by the results of the proceeding. The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following factors: (1)thenature of tee 7e~titioner's right under the Act to be made a party to the proceeding;-
(2) the nature and extent of the petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any order which may be entered in the proceeding on the petitioner's interest. The petition should also identify the specific aspect (s) of the subject matter of the proceeding as to which petitioner wishes to intervene. Any person who has filed a petition l
for leave to intervene or who has been admitted as a party may amend the petition without requesting leave of the Board up to fifteen (15) days prior to the first prehearing conference scheduled in the proceedings, but such an amended petition must satisfy the specificity requirements described above.
( Not later than fifteen (15) days prior to the first prehearing conference l scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene which must include a list of the contentions which are sought to be litigated in the matter, end the bases for each centention set l
forth with reasonable specificity. Contentions shall be limited to matters within the scope of the amendment under consideration. A petitioner who fails i to file such a supplement which satisfies these requirements with respect to at least one contention will not be pemitted to participate as a party.
Those pennitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene, and have the
opportunity to participate fully in the conduct of the hearing, including the opportunity to present evidence and cross-examine' witnesses.
.A request for a hearing or a petition for leave to intervene shall be filed with the Secretary of the Comission, United States Nuclear Regulatory Comission, Washington, D.C. 20555, Attention: Docketing and Service Branch.
--or may-be delivered to the Corzission's Public Document Ro<n,1717 H Street. .
N.W., Washington, D.C. by the above date. Where petitio':s are filed during the last ten (10) days of the notice period, it is requested that the petitioner or representative for the petitioner promptly so infonn the Cornission by a toll-free telephone call to Western Union at 1-800-325-6000 (in Missouri 1-800-342-6700). The Western Union operator should be given Datagram identification Number 3737 and the following message addressed to Jose A. Calvo: petitioner's name and telephone number; date Petition was mailed; plant name; and publication date and page number of this FEDERAL REGISTER notice. A copy of the petition should also be sent to the Office of the General Counsel, U.S. Nuclear Regulatory Coneission, Washington, D.C. 20555, and to Kelly, Stansfield & 0'Donnell, Room 900, 550 15th Street, Denver, Colorado 80202, attorney for the licensee.
Montimely filings cf petitions for leave to intervene, amended petitions, supplemental petitions and/or requests for hearing will not be entertained absent a detennination by the Comission, the presiding officer or the presiding Atomic Safety and Licensing Board, that the petition and/or request should be granted based upon a balancing of the factors specified in 10 CFR 2.714(a)(1)(i)-(v)and2.714(d).
. o If a request for hearing is received, the Commission's staff may issue the amendment after it completes its technical review and prior to the completion of any required hearing if it publishes a further notice for public comment of its proposed finding of no significant hazards consideration in accordance with 10 CFR 50.91 and 50.92.
~ ~ ~ ~ ~ ' ~
For further details with respect to this action, see the application for '
amendment dated February 8,1988, which is available for public inspection at the Commission's Public Document Room,1717 H Street, N. W., Washington, D. C.
and at the Greely Public Library, City Complex, Greely, Colorado.
Dated at Rockville, Maryland this 28th day of April,1988.
FOR THE NUCLEAR PEGULATORY COMMISSION
' d. G< &
l Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation l
1 l
1