MONTHYEARML20072P1341983-07-11011 July 1983 Proposed Tech Spec Changes Assuring Operability of Plant Protective Sys Limiting Conditions for Operation Defining Trip Setpoint Operability Project stage: Other ML20087E6151984-02-17017 February 1984 Rev a to Work Spec WS-93-0004, Reevaluation of Plant Protection Sys Setpoints Project stage: Other ML20087E5941984-03-0909 March 1984 Forwards Rev a to Work Spec WS-93-0004, Reevaluation of Plant Protection Sys Setpoints, as Result of 831027 Agreement to Revise Previous Application for Amend to Tech Specs Project stage: Request ML20112J0981985-03-18018 March 1985 Advises That Setpoint Reevaluation Program & Tech Spec Update Program Adopted.Proposed Amend to License DPR-34 for Plant Protective Sys Setpoints Will Be Submitted on or Before 850501 Project stage: Other ML20209F4231985-06-21021 June 1985 Forwards Application for Amend to License DPR-34,revising Tech Specs Re Limiting Conditions for Operation of Protective Sys Instrument Setpoints & Allowable Values Project stage: Request ML20209F4401985-06-21021 June 1985 Application for Amend to License DPR-34,revising Tech Specs Re Limiting Conditions for Operation of Protective Sys Instrument Setpoints & Allowable Values.Fee Paid Project stage: Request ML20209F4461985-06-21021 June 1985 Proposed Tech Specs Re Limiting Conditions for Operation of Protective Sys Instrument Setpoints & Allowable Values Project stage: Other ML20127P1071985-06-21021 June 1985 Advises That Util 850607 Submittal Re Draft Tech Specs for Control Rod Operability Acceptable Provided That Listed Changes Made.Confirmatory Submittal by Licensee of Revised Draft Tech Specs Should Be Provided Prior to Restart Project stage: Request ML20136F6651985-12-31031 December 1985 Informs of Continuation of Reviews Re Allowable Value & Trip Setpoint.Tech Spec Changes Submitted in .After Acceptable Margin Established Analyses Will Be Performed. Tech Spec Change Request Will Be Submitted by 860401 Project stage: Other ML20137P8021986-01-24024 January 1986 Forwards Draft Safety Evaluation Re 850621 Request to Change Tech Specs on Plant Protection Sys Instrumentation Setpoints.Resubmittal of Proposed Tech Specs to Reflect Acceptable Setpoints Requested within 45 Days Project stage: Draft Approval ML20140F8271986-03-25025 March 1986 Ack Receipt of NRC Re Proposed Tech Spec Change Request for Plant Protective Sys Trip Setpoints.Reevaluation of Basis & Analyses for Setpoint Justification for Fixed Feedwater Flow Low Parameter in Progress Project stage: Request ML20155E8421986-04-14014 April 1986 Advises That Addl Time Required to Fully Integrate Tech Spec Changes Re Plant Protection Sys Setpoints Into Existing Format.Tech Spec Amend Request Will Be Submitted by 860516 Project stage: Other ML20210S3261986-05-15015 May 1986 Forwards Application for Amend to License DPR-34,changing Plant Protective Sys Trip Setpoints & Surveillance Requirements.Summary of Proposed Changes & Comments on Draft SER Also Encl.Fee Paid Project stage: Draft Request ML20210S3291986-05-15015 May 1986 Application for Amend to License DPR-34,changing Plant Protective Sys Trip Setpoints & Surveillance Requirements Project stage: Request ML20210S4191986-05-15015 May 1986 Proposed Tech Specs,Changing Plant Protective Sys Trip Setpoints & Surveillance Requirements Project stage: Other ML20211P8291986-07-18018 July 1986 Ack Receipt of Re Plant Protective Sys Setpoints. Item Under Review w/860930 Target Completion Date Project stage: Other ML20211E0111986-10-16016 October 1986 Forwards Request for Addl Info Re NRC Review of Util Info on Plant Protective Sys Trip Setpoints & Surveillance Requirements Against Draft Safety Evaluation Forwarded on 860124 Project stage: Draft Approval ML20214P5751986-11-26026 November 1986 Recommends That Util Propose Tech Specs Based on Annual Allowable Values Re Plant Protective Sys Trip Setpoints. Response Requested within 60 Days of Ltr Date Project stage: Other ML20210B0611987-04-27027 April 1987 Requests That Submittal of Plant Protective Sys Setpoint Info Be Deferred Until 870831,in Response to NRC . Delay Due to Recent Efforts Focusing on Plant Restart Issues Project stage: Other ML20235A9971987-08-28028 August 1987 Forwards Response to NRC 861016 Request for Addl Info on Util 850621 & 860515 Requests for Amend to Tech Specs Re Trip Setpoints & Operating Requirements.Proposed Tech Specs Also Encl Project stage: Request ML20235B0091987-08-28028 August 1987 Proposed Tech Specs Re Trip Setpoints & Operating Requirements Project stage: Other ML20236V3191987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept Project stage: Draft Other ML20235V8871987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept Project stage: Draft Other ML20235R4161987-10-31031 October 1987 Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station Project stage: Draft Other ML20236V2941987-11-25025 November 1987 Forwards Draft EGG-NTA-7289, Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept.Discussion of Encl Draft W/Nrc at 871202 Meeting Proposed ML20237D6921987-12-15015 December 1987 Summary of 871203 Meeting W/Util & Inel Re Protective Sys Setpoints in Tech Specs.List of Meeting Attendees Encl Project stage: Meeting ML20149M2731988-02-0808 February 1988 Forwards Application for Amend to License DPR-34,revising Tech Specs on Plant Protective Sys Trip Setpoints & Operating Requirements Project stage: Request ML20149M2851988-02-0808 February 1988 Application for Amend to License DPR-34,revising Tech Specs Re Plant Protective Sys Trip Setpoints & Operating Requirements Project stage: Request ML20149M2901988-02-0808 February 1988 Proposed Tech Spec Re Plant Protective Sys Trip Setpoint & Operating Requirements Project stage: Other ML20151B0031988-03-31031 March 1988 Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept Project stage: Other ML20154B8061988-04-28028 April 1988 Forwards Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing Re 880208 Application Concerning Setpoints for Plant Protective Sys Project stage: Other ML20154B8131988-04-28028 April 1988 Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing.Amend Modifies Setpoints Used in Plant Protective Sys Project stage: Other ML20195B4981988-06-0303 June 1988 Forwards Notice of Environ Assessment & Finding of No Significant Impact Re Util 880208 Application Concerning Setpoints for Plant Protective Sys Project stage: Other ML20195B5481988-06-0303 June 1988 Notice of Environ Assessment & Finding of No Significant Impact Re Util 880208 Proposed Revised Setpoints for Plant Protective Sys to Allow for Administrative Errors.Commission Has Decided Not to Prepare EIS Project stage: Other ML20151A9881988-06-20020 June 1988 Forwards Amend 60 to License DPR-34,safety Evaluation & Technical Evaluation Rept EGG-NTA-7289.Amend Revises Setpoints for Plant Protective Sys to Allow for Instrumentation Error Project stage: Approval 1986-05-15
[Table View] |
|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20138G7291996-12-0303 December 1996 Summary of 961203 Meeting W/Psc in Plattville Co Re Decommissioning & License Termination of Fsv.Slides,Encl ML20137H2471995-04-12012 April 1995 Summary of 950405-06 Meeting W/Utility at Fort St Vrain Re Stier,Anderson & Malone Rept.Attendees Listed ML20128G1851993-01-29029 January 1993 Summary of 930128 Meeting W/Psc in Rockville,Md Re Briefing of NRC Staff on Status of Fsv Decommissioning Activities. Meeting Agenda & Summary of PSCs Briefing Encl ML20055J3931990-07-31031 July 1990 Summary of 900725 Meeting W/Util in Rockville,Md Re Defueling & Decommissioning of Facility.Attendees List Encl ML20246D9231989-08-18018 August 1989 Summary of 890718 Meeting W/Util to Discuss Defueling of Plant.List of Attendees,Agenda & Viewgraphs Encl ML20236C9921989-03-13013 March 1989 Summary of 890307 Meeting W/Util & Ga Technologies Re Plant Coastdown & Defueling.Attendance List,Agenda & Viewgraphs Encl ML20195D5591988-10-26026 October 1988 Summary of 881013 & 14 Meeting W/Util to Discuss Potential Decommissioning of Facility.W/O Stated Encl ML20154E4031988-09-0909 September 1988 Summary of 880831 Meeting W/Util Re Fire Protection Issues at Plant.Meeting Attendees Encl ML20151K6901988-07-18018 July 1988 Summary of Operating Reactors Events Meeting 88-28 on 880712.Viewgraphs & List of Attendees Encl ML20151K7361988-04-15015 April 1988 Summary of Operating Reactors Events Meeting 88-15 on 880412.List of Attendees & Viewgraphs Encl ML20153A8551988-03-0909 March 1988 Summary of 880304 Meeting W/Util to Discuss 880122 Submittal Re Helium Circulator Failure & Recovery.Attendee List & Viewgraphs Encl ML20149L4981988-02-12012 February 1988 Summary of 871207 Meeting W/Utils in Bethesda,Md Re Licensees Revised Proposal to Comply W/Nrc Requirement for Simulation Facilities Under 10CFR55.45(b).List of Attendees & Util Simulation Facility Group Guideline Encl ML20147D8901988-01-12012 January 1988 Summary of 881202-03 Meeting W/Util,Inel & ORNL Re Status of Tech Spec Upgrade Program.Meeting Attendees & Listed Ref Encl ML20237D6921987-12-15015 December 1987 Summary of 871203 Meeting W/Util & Inel Re Protective Sys Setpoints in Tech Specs.List of Meeting Attendees Encl ML20237D2251987-12-15015 December 1987 Summary of 871204 Meeting W/Util Re Licensee Latest Proposals for Licensing Actions Concerning CRD Mechanism Temp Requalification & Position Instrumentation.List of Attendees & Related Info Encl ML20236B9121987-10-20020 October 1987 Summary of 871002 Meeting W/Util Re Specific Aspects of Util Approach to Conform w/10CFR55 for Facility.List of Attendees & Util Presentation Matl Encl ML20236A9731987-10-13013 October 1987 Summary of 870915-16 Meetings W/Four Facility Licensees in Bethesda,Md Re Proposal to Apply for NRC Approval for Simulation Facilities.Viewgraphs & Related Documents Encl ML20235Z5891987-10-0808 October 1987 Summary of 871006 Operating Reactor Events Meeting 87-34 Re Events Occurring Since 870929 Meeting.List of Attendees & Presentation Matl Encl ML20235H4401987-09-21021 September 1987 Summary of 870911 Meeting W/Util in Arlington,Tx Re Failure of Plant Circulator S/N C-2101 & Licensee Program to Recover from Failure.Licensee Rept, Preliminary Rept of Helium Circulator S/N C-2101 Damage & Justification... Encl ML20207S6271987-03-12012 March 1987 Summary of 870210 Meeting W/Util Re Emergency Diesel Generator Electrical Independence.List of Attendees Encl ML20210P0191987-02-0505 February 1987 Summary of 870113 Meeting W/Util Re Completion of Equipment Qualification Program & Program & Approvals Required for Plant Restart ML20212D8641986-12-24024 December 1986 Summary of 861209 Meeting W/Util Re Plant Emergency Electrical Power Sys.Fsar Commitment Re Emergency Diesel Generators revised.Marked-up Draft Rept Re Ac Standby Power Sys Encl ML20207B9781986-12-15015 December 1986 Summary of 861027-30 Meetings W/Util,Eg&G Idaho,Inc & ORNL at Site Re Tech Spec Upgrade Program.List of Attendees & NRC Comment Resolution Encl ML20214U7071986-12-0202 December 1986 Summary of 861120 Meeting W/Util,Ornl,Ga Technologies & Eg&G Re Temp Profiles for Equipment Qualification.List of Attendees & Viewgraphs Encl ML20214P8511986-11-25025 November 1986 Summary of 861105 Meeting W/Lasl Re Technical Evaluation Rept on Prestressed Concrete Reactor Vessel Tendons.Staff Requires Determination Re Listed Items.List of Attendees Encl ML20214Q0951986-11-25025 November 1986 Summary of 861027 Meeting W/Util to Discuss Schedule for Ie/Nrr Insp of Equipment Qualification Program.Attendance List & Viewgraphs Encl ML20197B8651986-10-28028 October 1986 Summary of 861001-02 Meetings W/Util,Inel & ORNL Re Staff Comments on Plant Tech Spec Upgrade Program.Nrc Comments Not Intended to Require Plant Mod or Changes to Licensing Basis of Plant ML20215L2101986-09-12012 September 1986 Summary of ACRS Subcommittee on Gas-Cooled Reactor Plants 860626 Public Meeting W/Nrc & Util in Washington,Dc Re Bases Used to Impose Requirements on Facility & Possibility of Severe Accidents.Attendance List & Viewgraphs Encl ML20215L2001986-09-12012 September 1986 Summary of ACRS Subcommittee on Fort St Vrain 860402 Public Meeting W/Nrc & Util at Facility Re Technical Problems Addressed During Recent Extended Outage & Mgt Charges. Attendance List & Viewgraphs Encl ML20206P5971986-08-15015 August 1986 Summary of 860724 Meeting W/Util,Inel,Wyle Labs,Sargent & Lundy & Tenera in Bethesda,Md Re Util Draft Documentation to Justify Qualification of safety-related Cabling at Plant. List of Attendees Encl ML20211Q6161986-07-23023 July 1986 Summary of Operating Reactor Events Meeting 86-25 on 860721 Re Events Since 860714 Meeting.List of Attendees,Discussion of Events & Status of Assignments Encl.Response Requested for Incomplete Assignments ML20207H0281986-07-21021 July 1986 Summary of 860627 Meeting W/Util Re Status of Tech Spec Upgrade Program.List of Attendees Encl ML20207H1211986-07-18018 July 1986 Trip Rept of 860625-27 Site Visit to Review QA Program, Observe Equipment Qualification Mods & Obtain Unescorted Access Status ML20203B6181986-07-15015 July 1986 Summary of 860613 Meeting W/Util in Bethesda,Md Re Status of Plant Equipment Qualification Program.List of Attendees, Environ Qualification of Plant Safe Shutdown Cable & Cable Qualification Binders Encl ML20199K4911986-06-27027 June 1986 Summary of 860604 Meeting W/Util Re Status of Licensing Actions.List of Attendees,Summary of NRC Responses to Actions & Summary of Actions Encl ML20205S2341986-06-0101 June 1986 Summary of 860502 Meeting W/Util & Inel in Bethesda,Md Re Equipment Qualification Program Problem Areas.Attendees List & Supporting Documentation Encl ML20198H4561986-05-27027 May 1986 Summary of 860505 Meeting W/Util Re Status of Equipment Qualification Program.Considerable Work Remains Before Approval of Full Power Operation Can Be Granted.Staff Recommended Util Continue to Complete Program ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20197F6541986-05-0707 May 1986 Summary of 860423-24 Meetings W/Util,Ga Technologies & S&W at Site Re Fuel Block Cracking,Bldg 10 Const,Seismic Instrumentation,Pcrv Tendons & Integrated Leak Rate Testing. Attendance List & Viewgraphs Encl ML20203E8051986-04-18018 April 1986 Summary of Operating Reactors Events Meeting 86-12 on 860414 Re Events Since 860407.List of Attendees,Viewgraphs & Supporting Documentation Encl ML20205J9221986-04-18018 April 1986 Summary of ACRS 312th Meeting on 860410-12 in Washington,Dc Re Proposed NRC Safety Goal Policy Statement & Need for Guidance in Environ & PRA for Quantification of Public Health Risks to Nearby Populations ML20205S2591986-04-10010 April 1986 Summary of 860326 Site Meeting W/Util,Dibenedetto Assoc,Inc, Sandia & Sargent & Lundy Re Status of Qualifications of 10CFR50.49 Cables & Maint Records History Review.Viewgraphs & Attendees List Encl ML20141B7451986-03-28028 March 1986 Summary of 860313 Meeting W/Util in Arlington,Tx Re Tech Spec Limiting Condition for Operation 4.1.9 Covering Frequency of Manipulation of Reactor Controls.Supporting Documentation Encl ML20142A0661986-03-14014 March 1986 Summary of 860116 Meeting W/Util,Training Co,Inc & SM Stoller Corp Re Performance Enhancement Program. Viewgraphs Encl ML20141P1771986-03-14014 March 1986 Summary of 860130 Meeting W/Util,Inel,Tenera & Sargent & Lundy Re Equipment Qualification (EQ) Program.List of Attendees,Test Profiles & Review of Sample EQ Package Encl ML20142A0441986-03-12012 March 1986 Summary of 860221 Onsite Meeting W/Util,Inel,D Benedetto Assoc,S&W,Tenera,Ned & NPD Re Equipment Qualification Program & Steam Line Rupture Detection & Isolation Sys ML20138R7331985-10-31031 October 1985 Summary of 851029 Meeting W/Util & ORNL Re Schedule Extension to Equipment Qualification Rule.List of Attendees, Agenda & Matls Presented by Util Encl ML20138P0081985-10-21021 October 1985 Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 ML20134F3081985-08-15015 August 1985 Summary of 850722-26 Meetings W/Util & Ga Technologies Re Tech Spec Upgrade.List of Attendees Encl ML20129E6721985-05-28028 May 1985 Summary of 850803 Meeting W/Util & Ga Technologies Re CRD Mechanism Tech Spec Problem.List of Attendees Encl 1996-12-03
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20138G7291996-12-0303 December 1996 Summary of 961203 Meeting W/Psc in Plattville Co Re Decommissioning & License Termination of Fsv.Slides,Encl ML20137H2471995-04-12012 April 1995 Summary of 950405-06 Meeting W/Utility at Fort St Vrain Re Stier,Anderson & Malone Rept.Attendees Listed ML20128G1851993-01-29029 January 1993 Summary of 930128 Meeting W/Psc in Rockville,Md Re Briefing of NRC Staff on Status of Fsv Decommissioning Activities. Meeting Agenda & Summary of PSCs Briefing Encl ML20055J3931990-07-31031 July 1990 Summary of 900725 Meeting W/Util in Rockville,Md Re Defueling & Decommissioning of Facility.Attendees List Encl ML20246D9231989-08-18018 August 1989 Summary of 890718 Meeting W/Util to Discuss Defueling of Plant.List of Attendees,Agenda & Viewgraphs Encl ML20236C9921989-03-13013 March 1989 Summary of 890307 Meeting W/Util & Ga Technologies Re Plant Coastdown & Defueling.Attendance List,Agenda & Viewgraphs Encl ML20195D5591988-10-26026 October 1988 Summary of 881013 & 14 Meeting W/Util to Discuss Potential Decommissioning of Facility.W/O Stated Encl ML20154E4031988-09-0909 September 1988 Summary of 880831 Meeting W/Util Re Fire Protection Issues at Plant.Meeting Attendees Encl ML20151K6901988-07-18018 July 1988 Summary of Operating Reactors Events Meeting 88-28 on 880712.Viewgraphs & List of Attendees Encl ML20151K7361988-04-15015 April 1988 Summary of Operating Reactors Events Meeting 88-15 on 880412.List of Attendees & Viewgraphs Encl ML20153A8551988-03-0909 March 1988 Summary of 880304 Meeting W/Util to Discuss 880122 Submittal Re Helium Circulator Failure & Recovery.Attendee List & Viewgraphs Encl ML20149L4981988-02-12012 February 1988 Summary of 871207 Meeting W/Utils in Bethesda,Md Re Licensees Revised Proposal to Comply W/Nrc Requirement for Simulation Facilities Under 10CFR55.45(b).List of Attendees & Util Simulation Facility Group Guideline Encl ML20147D8901988-01-12012 January 1988 Summary of 881202-03 Meeting W/Util,Inel & ORNL Re Status of Tech Spec Upgrade Program.Meeting Attendees & Listed Ref Encl ML20237D6921987-12-15015 December 1987 Summary of 871203 Meeting W/Util & Inel Re Protective Sys Setpoints in Tech Specs.List of Meeting Attendees Encl ML20237D2251987-12-15015 December 1987 Summary of 871204 Meeting W/Util Re Licensee Latest Proposals for Licensing Actions Concerning CRD Mechanism Temp Requalification & Position Instrumentation.List of Attendees & Related Info Encl ML20236B9121987-10-20020 October 1987 Summary of 871002 Meeting W/Util Re Specific Aspects of Util Approach to Conform w/10CFR55 for Facility.List of Attendees & Util Presentation Matl Encl ML20236A9731987-10-13013 October 1987 Summary of 870915-16 Meetings W/Four Facility Licensees in Bethesda,Md Re Proposal to Apply for NRC Approval for Simulation Facilities.Viewgraphs & Related Documents Encl ML20235Z5891987-10-0808 October 1987 Summary of 871006 Operating Reactor Events Meeting 87-34 Re Events Occurring Since 870929 Meeting.List of Attendees & Presentation Matl Encl ML20235H4401987-09-21021 September 1987 Summary of 870911 Meeting W/Util in Arlington,Tx Re Failure of Plant Circulator S/N C-2101 & Licensee Program to Recover from Failure.Licensee Rept, Preliminary Rept of Helium Circulator S/N C-2101 Damage & Justification... Encl ML20207S6271987-03-12012 March 1987 Summary of 870210 Meeting W/Util Re Emergency Diesel Generator Electrical Independence.List of Attendees Encl ML20210P0191987-02-0505 February 1987 Summary of 870113 Meeting W/Util Re Completion of Equipment Qualification Program & Program & Approvals Required for Plant Restart ML20212D8641986-12-24024 December 1986 Summary of 861209 Meeting W/Util Re Plant Emergency Electrical Power Sys.Fsar Commitment Re Emergency Diesel Generators revised.Marked-up Draft Rept Re Ac Standby Power Sys Encl ML20207B9781986-12-15015 December 1986 Summary of 861027-30 Meetings W/Util,Eg&G Idaho,Inc & ORNL at Site Re Tech Spec Upgrade Program.List of Attendees & NRC Comment Resolution Encl ML20214U7071986-12-0202 December 1986 Summary of 861120 Meeting W/Util,Ornl,Ga Technologies & Eg&G Re Temp Profiles for Equipment Qualification.List of Attendees & Viewgraphs Encl ML20214P8511986-11-25025 November 1986 Summary of 861105 Meeting W/Lasl Re Technical Evaluation Rept on Prestressed Concrete Reactor Vessel Tendons.Staff Requires Determination Re Listed Items.List of Attendees Encl ML20214Q0951986-11-25025 November 1986 Summary of 861027 Meeting W/Util to Discuss Schedule for Ie/Nrr Insp of Equipment Qualification Program.Attendance List & Viewgraphs Encl ML20197B8651986-10-28028 October 1986 Summary of 861001-02 Meetings W/Util,Inel & ORNL Re Staff Comments on Plant Tech Spec Upgrade Program.Nrc Comments Not Intended to Require Plant Mod or Changes to Licensing Basis of Plant ML20215L2101986-09-12012 September 1986 Summary of ACRS Subcommittee on Gas-Cooled Reactor Plants 860626 Public Meeting W/Nrc & Util in Washington,Dc Re Bases Used to Impose Requirements on Facility & Possibility of Severe Accidents.Attendance List & Viewgraphs Encl ML20215L2001986-09-12012 September 1986 Summary of ACRS Subcommittee on Fort St Vrain 860402 Public Meeting W/Nrc & Util at Facility Re Technical Problems Addressed During Recent Extended Outage & Mgt Charges. Attendance List & Viewgraphs Encl ML20206P5971986-08-15015 August 1986 Summary of 860724 Meeting W/Util,Inel,Wyle Labs,Sargent & Lundy & Tenera in Bethesda,Md Re Util Draft Documentation to Justify Qualification of safety-related Cabling at Plant. List of Attendees Encl ML20211Q6161986-07-23023 July 1986 Summary of Operating Reactor Events Meeting 86-25 on 860721 Re Events Since 860714 Meeting.List of Attendees,Discussion of Events & Status of Assignments Encl.Response Requested for Incomplete Assignments ML20207H0281986-07-21021 July 1986 Summary of 860627 Meeting W/Util Re Status of Tech Spec Upgrade Program.List of Attendees Encl ML20203B6181986-07-15015 July 1986 Summary of 860613 Meeting W/Util in Bethesda,Md Re Status of Plant Equipment Qualification Program.List of Attendees, Environ Qualification of Plant Safe Shutdown Cable & Cable Qualification Binders Encl ML20199K4911986-06-27027 June 1986 Summary of 860604 Meeting W/Util Re Status of Licensing Actions.List of Attendees,Summary of NRC Responses to Actions & Summary of Actions Encl ML20205S2341986-06-0101 June 1986 Summary of 860502 Meeting W/Util & Inel in Bethesda,Md Re Equipment Qualification Program Problem Areas.Attendees List & Supporting Documentation Encl ML20198H4561986-05-27027 May 1986 Summary of 860505 Meeting W/Util Re Status of Equipment Qualification Program.Considerable Work Remains Before Approval of Full Power Operation Can Be Granted.Staff Recommended Util Continue to Complete Program ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20197F6541986-05-0707 May 1986 Summary of 860423-24 Meetings W/Util,Ga Technologies & S&W at Site Re Fuel Block Cracking,Bldg 10 Const,Seismic Instrumentation,Pcrv Tendons & Integrated Leak Rate Testing. Attendance List & Viewgraphs Encl ML20203E8051986-04-18018 April 1986 Summary of Operating Reactors Events Meeting 86-12 on 860414 Re Events Since 860407.List of Attendees,Viewgraphs & Supporting Documentation Encl ML20205J9221986-04-18018 April 1986 Summary of ACRS 312th Meeting on 860410-12 in Washington,Dc Re Proposed NRC Safety Goal Policy Statement & Need for Guidance in Environ & PRA for Quantification of Public Health Risks to Nearby Populations ML20205S2591986-04-10010 April 1986 Summary of 860326 Site Meeting W/Util,Dibenedetto Assoc,Inc, Sandia & Sargent & Lundy Re Status of Qualifications of 10CFR50.49 Cables & Maint Records History Review.Viewgraphs & Attendees List Encl ML20141B7451986-03-28028 March 1986 Summary of 860313 Meeting W/Util in Arlington,Tx Re Tech Spec Limiting Condition for Operation 4.1.9 Covering Frequency of Manipulation of Reactor Controls.Supporting Documentation Encl ML20142A0661986-03-14014 March 1986 Summary of 860116 Meeting W/Util,Training Co,Inc & SM Stoller Corp Re Performance Enhancement Program. Viewgraphs Encl ML20141P1771986-03-14014 March 1986 Summary of 860130 Meeting W/Util,Inel,Tenera & Sargent & Lundy Re Equipment Qualification (EQ) Program.List of Attendees,Test Profiles & Review of Sample EQ Package Encl ML20142A0441986-03-12012 March 1986 Summary of 860221 Onsite Meeting W/Util,Inel,D Benedetto Assoc,S&W,Tenera,Ned & NPD Re Equipment Qualification Program & Steam Line Rupture Detection & Isolation Sys ML20138R7331985-10-31031 October 1985 Summary of 851029 Meeting W/Util & ORNL Re Schedule Extension to Equipment Qualification Rule.List of Attendees, Agenda & Matls Presented by Util Encl ML20138P0081985-10-21021 October 1985 Summary of Operating Reactors Events Meeting 85-19 on 851007 W/Ofc Directors,Div Directors & Representatives on Events Which Occurred Since Last Meeting on 851007 ML20134F3081985-08-15015 August 1985 Summary of 850722-26 Meetings W/Util & Ga Technologies Re Tech Spec Upgrade.List of Attendees Encl ML20129E6721985-05-28028 May 1985 Summary of 850803 Meeting W/Util & Ga Technologies Re CRD Mechanism Tech Spec Problem.List of Attendees Encl ML20128P6271985-05-23023 May 1985 Summary of 850516 Meeting W/Util Re Emergency Electrical Power Sys Concerns Resulting from Staff Evaluation of Problems from Testing Emergency Diesel Generators on 841218. Justification for Continued Operation Requested 1996-12-03
[Table view] |
Text
, - - - - . _ _ - - _ _ _ - _ - _ - - - - - - _ - - _ - - - - - _ - - - -------- --------------- -
C.
wag
[o o
'g UNITED STATES o NUCLEAR REGULATORY COMMISSION g E W ASHINGTON, D. C. 20555
% ;8 December 15, 1987
%***.*/
Docket No. 50-267 MEMORANDUM FOR: Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, ;
IV, V and Special Projects FROM: Kenneth L. Heitner, Project Manager Project Directorate - IV i Division of Reactor Projects - III, IV, V and Special Projects
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS PLANT PROTECTIVE SYSTEM (PPS) SETPOINTS, DECEMBER 3, 1987 (TAC NO. 47416)
The purpose of this meeting was to discuss the licensee's proposed changes to the PPS setpoints in the Technical Specifications. The licensee's current proposal is contained in a letter dated August 28, 1987 (P-87278). The staff requested thct a technical evaluation of this submittal be performed by an NRC contractor, EG&G Idaho, Inc. A draft Technical Evaluation Report (TER) by the contractor was sent to the licensee by letter dated November 25, 1987. The attendees at this meeting are listed in Enclosure 1.
l The licensee briefly reviewed the history of this project. The NRC staff had i pointed out that the original PPS setpoints were not conservative. The staff recommended that the licensee adopt the appropriate ISA standards (ISA Standard 567.04-1982). The licensee has been pursuing this objective for several years, beginning with the licensee's letter cated March 9, 1984 (P-84078).
The focus of the discussion then shifted to the licensee's methods for obtaining the setpoints. The licensee's methodology is summarized on pages 3.3-4 and t 3.3-5 of the proposed Technical Specifications change. These methodologies were discussed in detail to ascertain how the licensee included both measured and estimated sources of error in the determination of allowable values and setpoints. The licensee's methodology was also reviewed against the staff's letter of November 26, 1986 on this subject.
After considerable discussion, the staff and it's contractor (EG&G Idaho, Inc.)
agreed that the licensee's methods met the ISA standards, were consistent with the staff's guidance, and were conservative.
The staff and it's contractor also briefly reviewed certain minor points i discussed in the draft TER. These included:
Clarifying the limits anc' basis for the PCRV rupture discs and !
the PCRV relief valves. ;
Expanding the basis for the rod withdrawal prohibits associated with !
l the Interlock Sequence Selector Switch, and That certain other items be clarified in footnotes, tables, and bases.
$g22ggg{ %o 7 P '
I I
.g-The licensee agreed to these revisions and stated that they would provide a final draft of the proposed changes by January 3, 1988. The staff and licensee agreed this schedule would allow implementation of these changes prior to the fourth refueling. This would constitute a first phase of the PPS setpoint changes.
The staff and licensee agrced to pursue the remaining outstanding items as follows:
The licensee would complete the analysis of the fixed low feedwater flow trip value and submit this to the staff by January 30, 1988.
The licensee was continuing to analyze the programmed low feedwater flow trip value.
The staff woul_d review the proposed surveillance requirements and undervoltage protection setpoints in the June 21, 1985 (P-85214) submittal.
The staff would provide comments to the licensee in order to assure a correct final submittal.
The staff noted the licensee's submittal concerning the use of the internal test signal dated April 23, 1987 (P-87100) was in legal review pending final approval.
pl Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects
Enclosure:
As stated cc: See.next page DISTRIBUTION
-Docket or Central File NRC POR Local PDR PD4 Reading J. Calvo Project Manager 0GC-Bethesda E. Jordan J. Partlow NRC Participants ACRS (10)
PD4 Plant File PD4/LA:k (PD4/Pb PD4/D PNoonan KHeitner JCalvo/MG
'12/ty/87 12/Jj/87 12//f/87 I
'4
., 4 Mr. R. O. Williams, Jr.
Public Service Company of Colorado Fort St. Vrain cc:
Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201-0840 Mr. David Alberstein,14/159A Mr. R. O. Williams, Jr., Acting Manager GA Technologies, Inc. Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. P. F. Tomlinson, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado. 80201-0840 16805 Weld County Road 19-1/2 Platteville, Colorado -80651 Senior Resident Inspector U.S. Nuclear Regulatory Comission Mr. R. F. Walker P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Stansfield & 0'Donnell Public Service Company Building Comitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-0 Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission i 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413
~. 7
~
l Enclosure 1 ATTENDEES NRC-PSC PPS Setpoints Meeting December 3, 1987 L
p, NAME .
ORGANIZATION' R- H. Holmes PSC - Licensing J. C. Selan- PSC - Licensing M. E. Deniston PSC - Operations J. L. Mauck NRC/NRR/ DEST /ICSB J' Stachew
. INEL K. Heitner. NRC/NRR/PD-IV J. J. McCauley PSC - Licensing
-J. R.' Johns PSC - Licensing
-S..Chesnutt PIC - Licensing 4
1 l
1 1
I u
. --__--_-__--- _ _ .I