MONTHYEARML19347C0651980-10-0101 October 1980 Forwards Application for Amend of License DPR-34,changing Tech Specs 2.0 & Tables 3.3.1 & 4.4-1 Through 4.4-4 to Revise Instrument Setpoints Project stage: Request ML19347C0701980-10-0101 October 1980 Application for Amend of License DPR-34,changing Tech Specs 2.0 & Tables 3.3.1 & 4.4-1 Through 4.4.4 to Revise Instrument Setpoints Project stage: Request ML19347C0731980-10-0101 October 1980 Proposed Changes to Tech Specs 2.0 & Tables 3.3.1 & 4.4-1 Through 4.4-4,revising Instrument Setpoints.Supporting Documentation Encl Project stage: Request ML20028E3271983-01-14014 January 1983 Requests Technical Assistance W/Proposed Tech Spec Setpoint Revs Requested by Util.Region Will Provide Assistance,Act as Contact Between NRR & Util & Process & Issue Change.Nrr Will Review Request & Issue Ser.W/O Encl Project stage: Other ML20072P1341983-07-11011 July 1983 Proposed Tech Spec Changes Assuring Operability of Plant Protective Sys Limiting Conditions for Operation Defining Trip Setpoint Operability Project stage: Other ML20087E6151984-02-17017 February 1984 Rev a to Work Spec WS-93-0004, Reevaluation of Plant Protection Sys Setpoints Project stage: Other ML20087E5941984-03-0909 March 1984 Forwards Rev a to Work Spec WS-93-0004, Reevaluation of Plant Protection Sys Setpoints, as Result of 831027 Agreement to Revise Previous Application for Amend to Tech Specs Project stage: Request ML20112J0981985-03-18018 March 1985 Advises That Setpoint Reevaluation Program & Tech Spec Update Program Adopted.Proposed Amend to License DPR-34 for Plant Protective Sys Setpoints Will Be Submitted on or Before 850501 Project stage: Other ML20127P1071985-06-21021 June 1985 Advises That Util 850607 Submittal Re Draft Tech Specs for Control Rod Operability Acceptable Provided That Listed Changes Made.Confirmatory Submittal by Licensee of Revised Draft Tech Specs Should Be Provided Prior to Restart Project stage: Request ML20209F4231985-06-21021 June 1985 Forwards Application for Amend to License DPR-34,revising Tech Specs Re Limiting Conditions for Operation of Protective Sys Instrument Setpoints & Allowable Values Project stage: Request ML20209F4401985-06-21021 June 1985 Application for Amend to License DPR-34,revising Tech Specs Re Limiting Conditions for Operation of Protective Sys Instrument Setpoints & Allowable Values.Fee Paid Project stage: Request ML20209F4461985-06-21021 June 1985 Proposed Tech Specs Re Limiting Conditions for Operation of Protective Sys Instrument Setpoints & Allowable Values Project stage: Other ML20136F6651985-12-31031 December 1985 Informs of Continuation of Reviews Re Allowable Value & Trip Setpoint.Tech Spec Changes Submitted in .After Acceptable Margin Established Analyses Will Be Performed. Tech Spec Change Request Will Be Submitted by 860401 Project stage: Other ML20137P8021986-01-24024 January 1986 Forwards Draft Safety Evaluation Re 850621 Request to Change Tech Specs on Plant Protection Sys Instrumentation Setpoints.Resubmittal of Proposed Tech Specs to Reflect Acceptable Setpoints Requested within 45 Days Project stage: Draft Approval ML20140F8271986-03-25025 March 1986 Ack Receipt of NRC Re Proposed Tech Spec Change Request for Plant Protective Sys Trip Setpoints.Reevaluation of Basis & Analyses for Setpoint Justification for Fixed Feedwater Flow Low Parameter in Progress Project stage: Request ML20155E8421986-04-14014 April 1986 Advises That Addl Time Required to Fully Integrate Tech Spec Changes Re Plant Protection Sys Setpoints Into Existing Format.Tech Spec Amend Request Will Be Submitted by 860516 Project stage: Other ML20210S3261986-05-15015 May 1986 Forwards Application for Amend to License DPR-34,changing Plant Protective Sys Trip Setpoints & Surveillance Requirements.Summary of Proposed Changes & Comments on Draft SER Also Encl.Fee Paid Project stage: Draft Request ML20210S3291986-05-15015 May 1986 Application for Amend to License DPR-34,changing Plant Protective Sys Trip Setpoints & Surveillance Requirements Project stage: Request ML20210S4191986-05-15015 May 1986 Proposed Tech Specs,Changing Plant Protective Sys Trip Setpoints & Surveillance Requirements Project stage: Other ML20211P8291986-07-18018 July 1986 Ack Receipt of Re Plant Protective Sys Setpoints. Item Under Review w/860930 Target Completion Date Project stage: Other ML20211E0111986-10-16016 October 1986 Forwards Request for Addl Info Re NRC Review of Util Info on Plant Protective Sys Trip Setpoints & Surveillance Requirements Against Draft Safety Evaluation Forwarded on 860124 Project stage: Draft Approval ML20214P5751986-11-26026 November 1986 Recommends That Util Propose Tech Specs Based on Annual Allowable Values Re Plant Protective Sys Trip Setpoints. Response Requested within 60 Days of Ltr Date Project stage: Other ML20210B0611987-04-27027 April 1987 Requests That Submittal of Plant Protective Sys Setpoint Info Be Deferred Until 870831,in Response to NRC . Delay Due to Recent Efforts Focusing on Plant Restart Issues Project stage: Other ML20235A9971987-08-28028 August 1987 Forwards Response to NRC 861016 Request for Addl Info on Util 850621 & 860515 Requests for Amend to Tech Specs Re Trip Setpoints & Operating Requirements.Proposed Tech Specs Also Encl Project stage: Request ML20235B0091987-08-28028 August 1987 Proposed Tech Specs Re Trip Setpoints & Operating Requirements Project stage: Other ML20235R4161987-10-31031 October 1987 Draft Eg&G Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station Project stage: Draft Other ML20235V8871987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept Project stage: Draft Other ML20236V3191987-10-31031 October 1987 Draft Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept Project stage: Draft Other ML20236V2941987-11-25025 November 1987 Forwards Draft EGG-NTA-7289, Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Technical Evaluation Rept.Discussion of Encl Draft W/Nrc at 871202 Meeting Proposed ML20237D6921987-12-15015 December 1987 Summary of 871203 Meeting W/Util & Inel Re Protective Sys Setpoints in Tech Specs.List of Meeting Attendees Encl Project stage: Meeting ML20149M2731988-02-0808 February 1988 Forwards Application for Amend to License DPR-34,revising Tech Specs on Plant Protective Sys Trip Setpoints & Operating Requirements Project stage: Request ML20149M2851988-02-0808 February 1988 Application for Amend to License DPR-34,revising Tech Specs Re Plant Protective Sys Trip Setpoints & Operating Requirements Project stage: Request ML20149M2901988-02-0808 February 1988 Proposed Tech Spec Re Plant Protective Sys Trip Setpoint & Operating Requirements Project stage: Other ML20151B0031988-03-31031 March 1988 Technical Evaluation Rept for Plant Protective Sys Trip Setpoints for Fort St Vrain Nuclear Generating Station, Informal Rept Project stage: Other ML20154B8061988-04-28028 April 1988 Forwards Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing Re 880208 Application Concerning Setpoints for Plant Protective Sys Project stage: Other ML20154B8131988-04-28028 April 1988 Notice of Consideration of Issuance of Amend to License DPR-34 & Opportunity for Hearing.Amend Modifies Setpoints Used in Plant Protective Sys Project stage: Other ML20195B4981988-06-0303 June 1988 Forwards Notice of Environ Assessment & Finding of No Significant Impact Re Util 880208 Application Concerning Setpoints for Plant Protective Sys Project stage: Other ML20195B5481988-06-0303 June 1988 Notice of Environ Assessment & Finding of No Significant Impact Re Util 880208 Proposed Revised Setpoints for Plant Protective Sys to Allow for Administrative Errors.Commission Has Decided Not to Prepare EIS Project stage: Other ML20151A9881988-06-20020 June 1988 Forwards Amend 60 to License DPR-34,safety Evaluation & Technical Evaluation Rept EGG-NTA-7289.Amend Revises Setpoints for Plant Protective Sys to Allow for Instrumentation Error Project stage: Approval 1986-04-14
[Table View] |
Text
,
C.
wag
[o o
UNITED STATES
'g NUCLEAR REGULATORY COMMISSION o
g E
W ASHINGTON, D. C. 20555
- 8 December 15, 1987
%***.*/
Docket No. 50-267 MEMORANDUM FOR:
Jose A. Calvo, Director Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects FROM:
Kenneth L. Heitner, Project Manager Project Directorate - IV i
Division of Reactor Projects - III, IV, V and Special Projects
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS PLANT PROTECTIVE SYSTEM (PPS) SETPOINTS, DECEMBER 3, 1987 (TAC NO. 47416)
The purpose of this meeting was to discuss the licensee's proposed changes to the PPS setpoints in the Technical Specifications.
The licensee's current proposal is contained in a letter dated August 28, 1987 (P-87278).
The staff requested thct a technical evaluation of this submittal be performed by an NRC contractor, EG&G Idaho, Inc.
A draft Technical Evaluation Report (TER) by the contractor was sent to the licensee by letter dated November 25, 1987.
The attendees at this meeting are listed in Enclosure 1.
l The licensee briefly reviewed the history of this project.
The NRC staff had i
pointed out that the original PPS setpoints were not conservative.
The staff recommended that the licensee adopt the appropriate ISA standards (ISA Standard 567.04-1982).
The licensee has been pursuing this objective for several years, beginning with the licensee's letter cated March 9, 1984 (P-84078).
The focus of the discussion then shifted to the licensee's methods for obtaining the setpoints. The licensee's methodology is summarized on pages 3.3-4 and 3.3-5 of the proposed Technical Specifications change.
These methodologies t
were discussed in detail to ascertain how the licensee included both measured and estimated sources of error in the determination of allowable values and setpoints.
The licensee's methodology was also reviewed against the staff's letter of November 26, 1986 on this subject.
After considerable discussion, the staff and it's contractor (EG&G Idaho, Inc.)
agreed that the licensee's methods met the ISA standards, were consistent with the staff's guidance, and were conservative.
The staff and it's contractor also briefly reviewed certain minor points i
discussed in the draft TER.
These included:
Clarifying the limits anc' basis for the PCRV rupture discs and the PCRV relief valves.
Expanding the basis for the rod withdrawal prohibits associated with l
the Interlock Sequence Selector Switch, and That certain other items be clarified in footnotes, tables, and bases.
$g22ggg{ %o 7
P
I I
.g-The licensee agreed to these revisions and stated that they would provide a final draft of the proposed changes by January 3, 1988.
The staff and licensee agreed this schedule would allow implementation of these changes prior to the fourth refueling.
This would constitute a first phase of the PPS setpoint changes.
The staff and licensee agrced to pursue the remaining outstanding items as follows:
The licensee would complete the analysis of the fixed low feedwater flow trip value and submit this to the staff by January 30, 1988.
The licensee was continuing to analyze the programmed low feedwater flow trip value.
The staff woul_d review the proposed surveillance requirements and undervoltage protection setpoints in the June 21, 1985 (P-85214) submittal.
The staff would provide comments to the licensee in order to assure a correct final submittal.
The staff noted the licensee's submittal concerning the use of the internal test signal dated April 23, 1987 (P-87100) was in legal review pending final approval.
pl Kenneth L. Heitner, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects
Enclosure:
As stated cc:
See.next page DISTRIBUTION
-Docket or Central File NRC POR Local PDR PD4 Reading J. Calvo Project Manager 0GC-Bethesda E. Jordan J. Partlow NRC Participants ACRS (10)
PD4 Plant File (PD4/Pb JCalvo/MG PD4/D PD4/LA:k PNoonan KHeitner
'12/ty/87 12/Jj/87 12//f/87 I
'4 4
Mr. R. O. Williams, Jr.
Public Service Company of Colorado Fort St. Vrain cc:
Mr. D. W. Warembourg, Manager Albert J. Hazle, Director Nuclear Engineering Division Radiation Control Division Public Service Company Department of Health of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201-0840 Mr. David Alberstein,14/159A Mr. R. O. Williams, Jr., Acting Manager GA Technologies, Inc.
Nuclear Production Division Post Office Box 85608 Public Service Company of Colorado San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. P. F. Tomlinson, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado. 80201-0840 16805 Weld County Road 19-1/2 Platteville, Colorado -80651 Senior Resident Inspector U.S. Nuclear Regulatory Comission Mr. R. F. Walker P. O. Box 640 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Stansfield & 0'Donnell Public Service Company Building Comitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-0 Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission i
611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 Regional Representative Radiation Programs Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413
~. 7
~
l Enclosure 1 ATTENDEES NRC-PSC PPS Setpoints Meeting December 3, 1987 Lp, NAME ORGANIZATION' R-H. Holmes PSC - Licensing J. C. Selan-PSC - Licensing M. E. Deniston PSC - Operations J. L. Mauck NRC/NRR/ DEST /ICSB J' Stachew INEL K. Heitner.
NRC/NRR/PD-IV J. J. McCauley PSC - Licensing
-J. R.' Johns PSC - Licensing
-S..Chesnutt PIC - Licensing 4
1 l
1 1
I u
.I