IR 05000321/1986006

From kanterella
Revision as of 07:21, 20 January 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Ack Receipt of 870127 Ltr Providing Addl Info Re Violations Noted in Insp Repts 50-321/86-06 & 50-366/86-06.Util Justification for Denial of Violation Ii.B Not Adequate as Discussed in Encl.Encl Withheld (Ref 10CFR2.790(d) & 73.21)
ML20212R610
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/17/1987
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: James O'Reilly
GEORGIA POWER CO.
References
EA-86-069, EA-86-69, NUDOCS 8704270277
Download: ML20212R610 (2)


Text

- - _ _

" APR 171987 Docket Nos. 50-321, 50-366 License Nos. DPR-57, NPF-5 EA 86-69 Georgia ATTN: Mr.Power James P.Company'Reilly O

Senior Vice President-Nuclear Operations P. O. Box 4545 Atlanta, GA 30302 Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-321/86-06 AND 50-366/86-06 Thank you for your response of January 27, 1987, to our request for additional information concerning violations II.B, II.D, and II.E. We have evaluated your corrective actions for violations II.D and II.E and found that they meet the requirements of 10 CFR 2.210. We will examine the implementation of these actions during future inspection For the reasons presented in the enclosure to this letter, your stated basis for denial of violation II.B is not considered to be adequate justification for withdrawal of this violation. Therefore, in accordance with 10 CFR 2.210(a),

please submit to this office within 30 days of the date of this letter your written statement describing steps which have been taken to correct the the results achieved, corrective steps which will be taken to avoid violation, further vio lations, and the date when full compliance will be achieve In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and security measures are exempt from public disclosure; therefore, the enclosure to this letter will not be placed in the NRC Public Document Roo The responses directed by this letter are not subject to the clearance procedure of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, PL 96-51

Sincerely, J. Nelson Grace Regional Administrator Enclosure:

Staff Assessment of Licensee Response (Safeguards Information)

ct w/ enc 1: (See page 2)

'

SAFEGU ARDS IN FORM ATlhestnt C 8704270277 870417 pAgg is DECONTgoLLI PDR ADOCK 05000321 _

0 PDR .- g

_ _ - _ - _ - - _ _ _ _ - - - - - - - - _ _ - _- - . _ _ _ - - _ -

- Georgia Power Company 2 cc w/ enc 1:

J. T. Beckham, Vice President, Plant Hatch H. C. Nix, Site Operations General Manager A. Fraser, Acting Site QA Supervisor L. Gucwa, Manager, Nuclear Safety and Licensing bcc w/ encl:

IE File NMSS/SGPL NRR/DL/SSPB bec w/o encl:

NRC Resident Inspector State of Georgia Document Control Desk

1b lin 'J o tntis AW p 87 4g 87 04////87 /87 0//f/8 4/j/87

/

RII RII RI ,

RII RII VBrownlee LRe es ins RGoddard t 04/t 7 87 04/1/87 / 04/ /87 04///87 [ 04/G /87

\

t

,,

ENCLOSUan CCHT UPON SEPA PAGE IS DECONT

.

i

'

,.e

.

,, Georg a Power Comca v

.p 333 P ecmcet Ave %e o At'a-'a Georg a 103CS e 1 *e+ct'cre 4C4 525 7W

.

S$3d"y v Ad3'933 Na"Sf,;'aNc2 ENCLOSURE CONTAINS UPUN SEPARATION THIS PAGE DECONTROLLED James P. o'ReiHy 3+ cr V ce P uear coe,'es: cent at e s SL-1865 0061b u

January 27, 1987 *

c

.7 m

l

.. '

U.S. Nuclear Regulatory Commission w U ATTN: Document Control Desk  ?. ( >

"

Washington, D.C. 20555

- o]

NRC DOCKETS 50-321, II 50-366 '

P7 OPERATING LICENSES DPR-57, II NPF-5 A pl EDWIN I. HATCH NUCLEAR PLAN UNITS 1, 2 '8" INSPECTION REPORT 86-06 Gentlemen:

This letter is in response to Inspection Report Nos. 50-321/86-06 and 50-366/86-06 and the Notice of Violation, dated May 28, 1986, and the request for additional information dated December 23, 198 The referenced report relates to an NRC inspection conducted on February 24-28 and March 18-19, 198 As noted in the response to Inspection Report 86-37, and as indicated in previous correspondence and meetings, Georgia Power Conpany (GPC) has urkrtaken numerous security improvements at both Plant Hatch and Plant Vogtle, and at our Corporate office to further enhance the Nuclear Security Program. We specifically wish to note that GPC has created and fully staffed a corporate nuclear security organization that monitort and provides assistance and direction to Plant Security Operations. The recent Regulatory Effectiveness Review of Plant Hatch, which concentrated on actual physical security issues, resulted in a favorable preliminary report on the security operation of the plant. We believe this review is but another confirmation of our efforts to achieve excellence and the exemplary results accomplished in the past yea .

The Georgia Power Company does not wish to pursue our request for mitigation on problems identified in early 1986 any further even though our l view has not changed. The Georgia Power Company has focused its attention on excellence in 1987 and plans not only to fully meet NRC security interpretations and standards but to exceed them in areas and matters important to our circumstances and need ENCLOSURE CONTAINS UPUN 5EPAHAfl0N IHIb PAGE ULCUNTRULLEU

_

-

-

.

.*

.* .

.

U.S. Nuclear Regulatory Commission January 27, 1987 Page two The enclosure addresses additional information related to Violations II.8, II.D. II.E in Inspection Report 86-0 The enclosures contain safeguards information and should be withheld from public disclosure in accordance with the requirements of 10 CFR 2.790(d) and 10 CFR 73.2 GEORGIA POWER COMPANY By: m k. U')' k . Ja s P. O'Reilly MJB/sjb Enclosure c: w/o Enclosure Geortfa Power Company U.S. Nuclear Regulatory Commission tir. V. T. Beckham, J Regfonal Administrator, Region II Plant Hatch Senior Resident Inspector ENCLOSURE CONTAINS urun straxmilun IMis est Id utcuRTRUI.TEU

.