Requests Schedule for Submittal of Safety Analysis for Design of Computer Based SPDS within 60 Days of Ltr Receipt. Safety Analysis Originally Submitted on 830928.Safety Evaluation Supporting Proposed SPDS for Interim Use Encl
ML20140C695
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/12/1986
From: Gears G
Office of Nuclear Reactor Regulation
To: Bauer E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20140C700 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8603250456
Download: ML20140C695 (2)


Text

_

l Docket Nos: 50-277 DISTRIBUTION:

50-278 gDocketzFile

~~

SNorris M 12 3 ~NRC PDR ACRS (10)

Local PDR LBeltracchi Mr. Edward G. Bauer, Jr. Gray File Vice President and General Counsel RBernero Philadelphia Electric Company OELD 2301 Market Street EJordan Philadelphia, Pennsylvania 19101 BGrimes JPartlow

Dear 11r. Bauer:

GGears

SUBJECT:

INTERIli, ANALOG-BASED SAFETY PARAMETER DISPLAY SYSTEM (SPDS)

Re: Peach Botton Atomic Pcwer Station, Units 2 and 3 In response to the requirements for a Safety Parameter Display System (SPDS) identified in Supplement 1 to NUREG-0737, a Safety Analysis on the Peach Bottom SPDS was submitted on September 28, 1983 by the <

Philadelphia Electric Company (the licensee or PECo) for staff review.

The staff reviewed the Safety Analysis and also conducted an audit of the Peach Bottom SPDS. The results of the staff's review were transmitted to the licensee on April 3,1985. In our April 3, 1985 transmittal, it was stated that we were unable to confirm that the Peach Bottom SPDS satisfied NRC requirements. The licensee requested a meeting to discuss these findings and conclusions. The June 14, 1985 meeting and the licensee's subsequent follow-up submittal of August 9, 1985 form the bases of the enclosed Safety Evaluation. The conclusion of our evaluation is that the proposed analog-based SPDS is acceptable for operational use until. the design and installation of the new, computer-based SPDS is completed.

In reference to the new computer-based SPDS, we request that you submit a schedule for the submittal of a safety analysis for the design of the new SPDS within 60 days of the receipt of this letter.

The staff's enclosed Safety Evaluation provides more detailed guidance as to the specific areas requiring licensee's evaluation and NRC staff review and approval.

Should you have any questions concerning the above, please do not hesitate to contact us.

pisinal r ictalby Gerald E. Gears, Project Manager BWR Project Directorate #2 Division of BWR Licensing

Enclosure:

As stated 0FFICIAL RECORD COPY a nc B603250456 860312 3 / 4 /86 9 3g,/86 PDR ADOCK 05000277 p PDR

Mr. E. G. Bauer, Jr. Peach Bottom Atomic Power Station, Philadelphia Electric Company Units 2 and 3 CC:

  • Mr. Eugene J. Bradley Mr. R. A. Heiss, Coordinator Assistant General Counsel Pennsylvania State Clearinghouse Philadelphia Electric Company Governor's Office of State Planning 2301 Market Street and Development Philadelphia, Pennsylvania 19101 P.O. Box 1323 Harrisburg, Pennsylvania 17120 Troy B. Conner, Jr., Esq.

1747 Pennsylvania Avenue, N.W. ,

Mr. Thomas M. Gerusky, Director Washington, D.C. 20006 Bureau of Radiation Protection Pennsylvania Department of

~.homas A. Deming, Esq. Environmental Resources Assistant Attorney General P.O. Box 2063 Department of Natural Rescurces Harrisburg, Pennsylvania 17120 Annapolis, Maryland 21401 ,

Mr. Albert R. Steel, Chairman Philadelphia Electric Company Board of Supervisors ATTN: Mr. R. Fleishmann Peach Bottom Township Peach Bottom Atomic R. D. #1 Power Station Delta, Pennsylvania 17314 Delta, Pennsylvania 17314 Mr. M. J. Cooney, Superintendent Generation Division - Nuclear Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101 Mr. Anthony J. Pietrofitta, General Manager Power Production Engineering Atlantic Electric P. O. Box 1500 1199 Black Horse Pike Pleasantville, New Jersey 08232 .

Resident Inspector U.S. Nuclear Regulatory Commission Peach Bottom Atomic Power Station -

P.O. Box 399 Delta, Pennsylvania 17314 Regional Administrator, Region I U.S. Nuclear. Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 -

O

=

.