ML20247L648
| ML20247L648 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 05/24/1989 |
| From: | Kane W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20247L653 | List: |
| References | |
| NUDOCS 8906020228 | |
| Download: ML20247L648 (2) | |
See also: IR 05000277/1989015
Text
.
- - - - _ .
__ -- - -
-__
I
-
'
}'q f
,
,;
9
,.
y
1 -
.
.
~'
.24 MAY 1989
.
,
Docket Nos. 50-277/DPR-44-
!
'
50-278/DPR-56
L
Philadelphia Electric Company
i'
' Correspondence Control. Desk'
. ATTN: Mr. C. A. McNeill
Executive Vice. President-Nuclear'
P. 0. Box 7520-
.
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Combined Inspection 50-277/89-15; 50-278/89-15
This letter transmits.the findings of a special~ restart safety inspection by
-
Mr. T. P... Johnson. and members of the NRC restart- staff on April '2 to May 6,1989, .
at the Peach Bottom Atomic Power Station, Delta, Pennsylvania. These finding ~s
~
were based on observation.of activities, interviews, measurements and document
. reviews, and have been discussed with Mr. J. F. Franz of your staff.
' A4 copy of this letter and the' enclosures are-being placed in the NRC'Public-
. Document _ Room.
'Within.ttie scope 'of this inspection, no violations were observed. However. two
issues of concern remain unresolved.
The first-involved a high pressure coolant
injection system wiring-error that occurred during a plant modification
. installed.in March and April 1989. We are concerned that your root cause
analysis and subsequent corrective actions associated with your modification.
program problems failed.to detect, prevent or correct this item. -The second'
concern involves the apparent impact of a vacancy.for the fire protection
supervisor position on the-fire protection program as indicated by several .
minor deficiencies in this area. No written reply to these issues is required.
at this time.
Your' cooperation with us is appreciated.
Sincerely,
MAL StBMED CY
William F. Kane, Director,
Division of Reactor Projects
Enclosure: NRC Region I Combined Inspection Report No. 50-277/89-15 and
50-278/89-15
l
J
OFFICIAL RECORD COPY CIR PB 89-15/15 - 0001.0.0
l
05/18/89
g(
8906020228'890524
ADOCK 05000277
1
Q:
/
Ol
5
_
,
.-
_
_ _ _ _ _
(s.
.
'
,
i
Philadelphia Electric Company
2
24 MAY 1989
cc w/ encl:
John S. Kemper, Sr., Senior Vice President-Nuclear
Jack Urban, General Manager, Fuels Department, Delmarva Power
D. M. Smith, Vice President, Peach Bottom Atomic Power Station
D. Helwig, Nuclear Services
E. C. Kistner, Chairman, Nuclear Review Board
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic
Electric
B. W. Gorman, Manager-External Affairs, Public Service Electric & Gas
Company
J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station
Troy B. Conner, Jr. , Esquire (Without Report)
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations
t
W. M. Alden, Director, Licensing Section
Doris Poulsen, Secretary of Harford County Council
Dane Honan
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bcc w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
"
J. C. Linville Section Chief, DRP
K. Abraham, PA0
Robert J. Bores, DRSS
SRI, Limerick I
Karl Abraham, Public Affairs Officer (2)
R. E. Martin, Project Engineer, NRR
fRP
P
b
R DRP
/
yers
j/) Urban
ohnson (1111ams
inville
iger
/
5/[/39
5/jf/89
5/ /89
5/ /89
I
5/J/89
5
89
/
OFFICIAL RECORD COPY CIR PB 89-15/15 - 000
.0
05/17/89
_ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _