ML20211E694
| ML20211E694 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 08/26/1999 |
| From: | Buckley B NRC (Affiliation Not Assigned) |
| To: | Hutton J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| TAC-MA6053, NUDOCS 9908300076 | |
| Download: ML20211E694 (5) | |
Text
&
August 26, 1999
- Mr. James A. Hutton Director-Licensing, MC 62A-1.
PECO Energy Company Nuclear Group Headquarters
. Correspondence Control Desk '
P.O. Box No.1951, Wayne, PA 19087-0195
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 - MINIMUM CRITICAL POWER RATIO (TAC NO. MA6053).
Dear Mr.'Hutton:
'. Based on our evaluation of your submittal dated July 12,1999, we find that additional information, as delineated in the enclosure, is required to continue our review. On August 18, 1999, we discussed these issues with members of your staff and a 30-day response from receipt of this letter was mutually acceptable.
' Should you have any questions regarding this request, please contact me at (301) 415-1483.
Sincerely, Original signed by:
Bartholomew C. Buckley, Sr. Project Manager, Section 2 Project Directorate 1 :
Division of Ucensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-278 -
Enclosure:
Request for Additional Information j
cc w/ encl: See next page DISTRIBUTION:
~
g{
J Docket File; B. Black OGC i
r PUBLIC M. O'Brien ACRS PDI-2 R/F.
B. Buckley M. Oprendek, RI i
DOCUMENT NAME: G:\\PDI-2\\PEACHBOTTOM\\RAl6053.WPD To receive a copy of this document, Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with 4ttachment/ enclosure "N" = No copy 0FFICE PM:PDI-2 Rj% l E LA:PDI-2, e NJ { l SC:PDI h /
l l
l NAME BBuckley/rs)-
M0'Brien ///@
JCliffoYd DATE 08/%/99 08/3 / /99 08//h /99 08/ /99 08/
/99 Official Record Copy 4
9908300076 990826 PDR ADOCK 05000278 P
T-l *, -
August 26,,1999 i.*
1i ey Mr. James' A. Hutton Director-Licensing, MC 62A-1 PECO Energy Company i
Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.195 i
Wayne, PA 19087-0195
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 - MINIMUM CRITICAL POWER RATIO (TAC NO. MA6053)
Dear Mr. Hutton:
Based on our evaluation of your submittal dated July 12,1999, we find that additional information, as delineated in the enclosure,is required to continue our review. On August 18, 1999, we discussed these issues with members of your staff and a 30-day response from receipt of this letter was mutually acceptable.
Should you have any questions regarding this request, please contact me at (301) 415-1483.
Sincerely, Original signed by:
Bartholomew C. Buckley, Sr. Project Manager, Section 2 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-278
Enclosure:
Request for Additional Information cc w/ encl: See next page DISTRIBUTION:
Docket File B. Black OGC PUBLIC M. O'Brien ACRS PDI-2 R/F B. Buckley M. Oprendek, RI DOCUMENT NAME: G:\\PDI-2\\PEACHBOTTOM\\R A16053.WPD To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy i
l with attachment / enclosure "N" = No copy 0FFICE PM:PDI-2 &*6 l E LA:PDI.2 l
SC:PDI-A /
l l
l NAME BBuckley/rsl M0'Brien /.
JC11ffoYd DATE 08/g/99 08/.. /99 08f//f /99 08/
/99 08/
/99 Official Record Copy l
l l
m j*g ga RtCO lI y
2%
UNITED STATFe.
j j
NUCLEAR REGULATORY COMMISSION
'C WASHINGTON, D.C. 20555 0001 August 26, 1999 1
l Mr. James A. Hutton Director-Licensing, MC 62A-1 PECO Energy Company l
Nuclear Group Headquarters l
Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION REGARDING PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 - MINIMUM CRITICAL POWER RATIO (TAC NO. MA6053)
Dear Mr. Hutton:
l Based on our evaluation of your submittal dated July 12,1999, we find that additional information, as delineated in the enclosure, is required to continue our review. On August 18, 1999, we discussed these issues with members of your staff and a 30-day response from receipt of this letter was mutually acceptable.
Should you have any questions regarding this request, please contact me at (301) 415-1483.
Sincerely, 0M W Al Bartholomew C. Buckley, Sr. Project Man ger, Section 2 Project Directorate i L
Division of Licensing Project Management
]
Office of Nuclear Reactor Regulation j
Docket No. 50-278
Enclosure:
Request for Additional Information cc w/ encl: See next page
3 Peach Bottom Atomic Power Station, Units 2 and 3 cc:
J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company Board of Suprevisors ATTN: Mr. J. Doering, Vice President Peach Bottom Township Peach Bottom Atomic Power Station R. D. #1 1848 Lay Road Delta, PA 17314 Delta, PA 17314 Public Service Commission of PECO Energy Company Maryland ATTN: Regulatory Engineer, A4-SS Engineering Division Peach Bottom Atomic Power Station Chief Engineer Chief Engineer 6 St. Paul Center 1848 Lay Road Baltimore, MD 21202-6806 Delta, PA 17314 Mr. Richard McLean Resident laspector Power Plant and Environmental U.S. Nuclear Regulatory Commission Review Division Peach Bottom Atomic Power Station Department of Natural Resources P.O. Box 399 B-3, Tawes State Office Building Delta, PA 17314 Annapolis, MD 21401 Regional Administrator, Region I Dr. Judith Johnsrud U.S. Nuclear Regulatory Commission National Energy Committee 475 Allendale Road Sierra Club King of Prussia, PA 19406 433 Orlando Avenue State College, PA 16603 Mr. Roland Fletcher Department of Environment Manager-Financial Control & Co-Owner 201 West Preston Street Affairs Baltirnore, MD 21201 Public Service electric and Gas Company A. F. Kirby, lil P.O. Box 236 External Operations - Nuclear Hacocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Manager-Peach Bottom Licensing Wilmington, DE 19899 PECO Energy Company Nuclear Group Headquarters PECO Energy Company Correspondence Control Desk Plant Manager P.O. Box No.195 Peach Bottom Atomic Power Station Wayne, PA 19087-0195 1848 Lay Road De:ta, PA 17314
{
t i
i I
I
I. :. i.
'I i-I l
d REQUEST FOR ADDITIONAL INFORMATION PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 3 In order for the NRC staff to perform an independent verification of the safety limit analysis, provide the type and number of the fuel assemblies in the Cycle 13 core, identify any difference in the ccre loading pattern between Cycle 12 and Cycle 13 operation and if any difference is identified, describe its impact on the calculation of the safety limit minimum critical power ratio.
i f
Enclosure i