ML20217B405

From kanterella
Jump to navigation Jump to search

Forwards Amend 233 to License DPR-56 & Safety Evaluation. Amend Changes Minimum Critical Power Ratio Safety Limit & Approved Methodologies Referenced in Core Operating Limits Report
ML20217B405
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 10/05/1999
From: Buckley B
NRC (Affiliation Not Assigned)
To: Hutton J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20217B411 List:
References
TAC-MA6053, NUDOCS 9910120232
Download: ML20217B405 (4)


Text

F l#'

Mr. J:mes S. Hutton October 5, 1999 Dir:ct:r-Licensing, MC 62A-1 PECO Energy Comp:ny Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.195 Wayne, PA 19087-0195

SUBJECT:

PEA.CH BOTTOM ATOMIC POVER STATION, UNIT NO. 3 -ISSUANCE OF AMENDMENT RE: PROPOSED CHANGE TO MINIMUM CRITICAL POWER RATIO SAFETY LIMITS AND CORE OPERATING LIMITS REPORT (TAC NO.

MA6053)

Dear Mr. Hutton:

The Commission f.as issued the enclosed Amendment No. 233 to Facility Operating License No. DPR-56 for the Peach Bottom Atomic Power Station, Unit No. 3. This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated July 12, j

1999 and supplemented August 30,1999.

This amendment changes the minimum critical power rstio safety limit and the approved methodologies referenced in the core operating limits report.

A copy of the safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's Bi-Weekly Federal Reoister Notice.

Sincerely, Original signed by:

Bartholomew C. Buckley, Sr. Project Manager, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-278 I

Enclosures:

1. Amendment No. 233to l

License No. DPR-56 e

f

2. Safety Evaluation i

/ I cc w/encls: See next page plSTRIBUTION:

Docket Fire -

MO'Brien Mopendek, RGN-l BBuckley PUBLIC MFerdas ACRS WBeckner PDI-2 Reading OGC THuang GHill(2)

RScholl(E-Mail SE to RFS)

JClifford EAdensam(Email) kb I h

7, "a. r o

DOCUMENT NAME: G:\\PDl-2\\PeachBottom\\PB3MA605.3.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attrchment/ enclosure "N" = No copy n

OFFICE PM:PD!-2 (1/klE L.A:P01 2 u 4 e' 41 OGC l

SC:PD y V l

M:!#Xp/DSSA l f*

f NAME 9Buckley F/1 e.

M0'Brien / // //////

(' 'rM M / 6 JCLifkod ChrMo g,d DATE

(#') Ml Q 4

.,. / ' f, *,

9 / 1 i/ / @ (/

/st'(((F

' (\\\\ 'l 9 \\{AV\\

v, s a"" '"~"cial Recond Copy

\\

PDR ADOCK 05000278 P

PDR

E.

..umas vivup cavyuom.i.

Correspondence Control Desk i-P.O. Box No.195 Wayne, PA 19087-0195

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 3 -ISSUANCE OF AMENDMENT RE: PROPOSED CHANGE TO MINIMUM CRITICAL POWER RATIO SAFETY LIMITS AND CORE OPERATING LIMITS REPORT (TAC NO.

MA6053)

Dear Mr. Hutton:

The Commission has issued the enclosed Amendment No. 233 to Facility Operating License No. DPR-56 for the Peach Bottom Atomic Power Station, Unit No. 3. This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated July 12, 1999 and supplemented August 30,1999.

This amendment changes the minimum critical power ratio safety limit ai,J the approved methodologies referenced in the core operating limits report.

A copy of the safety evaluation is also enclosed. Notice of Issuance will be included in the Commission's Bi-Weekly Federal Reaister Notice.

Sincerely, Original signed by:

1 Bartholomew C. Buckley, Sr. Project Manager, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-278

Enclosures:

1. Amendment No. 233to License No. DPR-56
2. Safety Evaluation cc w/encls: See next page DISTRIBUTION:

Docket File MO'Brien Mopendek, RGN-1 BBuckley PUBLIC MFerdas ACRS WBeckner PDI-2 Reading OGC THuang GHill(2)

RScholl(E-Mail SE to RFS)

JClifford EAdensam(Email) l l

DOCUMENT NAME: G:\\PDI-2\\PeachBottom\\PB3MA6053.wpd l

To rective a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy j

with t.ttachment/ enclosure "N" = No copy a

j OFFICE PM:PDI 2 (1/&lE LA:PDI-2

,I I OCC l

l SC:PD g l I M:1 RXp/DSSA lE.

f NAME BBuckley F[1 y.

MO'Brieni

^

Y JClif orAf ChrXo iod f

/4f(/{W

'd\\3 $\\\\hU DATE W) f< 'b]Gf 7

+*t' l

f,. J / ' Official Record Copy

\\

I f

L l

I

~j-j NUCLEAR REGULATORY COMMISSION

't WASHINGTON, D.C. 2E%@91

.....[

. October 5,' 1999 Mr. James S. Hutton Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.195 -

Wayne, PA 19087-0195

SUBJECT:

PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 3 -ISSUANCE OF i

AMENDMENT RE: PROPOSED CHANGE TO MINIMUM CRITICAL POWER RATIO SAFETY LIMITS AND CORE OPERATING LIMITS REPORT (TAC NO.

MA6053)

Dear Mr..Hutton:

The Commission has issued the enclosed Amendment No. 233 to Facility Operating License No. DPR-56 for the Peach Bottom Atomic Power Station, Unit No. 3. This amendment consists of changes to the Technical Specifications (TSs) in response to your application dated July 12, i

1999 and supplemented August 30,1999.

This amendment changes the minimum critical power ratio safety limit and the approved methodologies referenced in the core operating limits report.

A copy of the safety evaluation is also enclosed. Notice of issuance will be included in the Commission's Bi-Weekly Federal Reaister Notice.

Sincerely, I

.)

wwmee (w. \\

uc "4 m

?

Bartholomew C. Buckley, Sr. Project Manager, Section 2 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation

. Docket No. 50-278

Enclosures:

1. Amendment No.233 to License No. DPR-56
2. Safety Evaluation cc w/encis: See next page

p Peach Bottom Atomic Power Station, Units 2 and 3 cc:

J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company Board of Suprevisors ATTN: Mr. J. Doering, Vice President Peach Bottom Township Peach Bottom Atomic Power Station R. D. #1 j

1848 Lay Road Delta, PA 17314 Delta, PA 17314 Public Senrice Commission of PECO Energy Company Maryland ATTN: Regu;atory Engineer, A4-SS Engineering Division Peach Bottom Atomic Power Station Chief Engineer Chief Engineer 6 St. Paul Center 1848 Lay Road Baltimore, MD 21202-6806 Delta, PA 17314 Mr. Richard McLean Resident Inspector Power Plant and Environmental j

U.S. Nuclear Regulatory Commission Review Division Peach Bottom Atomic Power Station Department of Natural Resources P.O. Box 399 B-3, Tawes State Office Building Delta, PA 17314 Annapolis, MD 21401 Regional Administrator, Region i Dr. Judith Johnsrud U.S. Nuclear Regulatory Commission National Energy Committee 475 Allendale Road Sierra Club King of Prussia, PA 19406 433 Orlando Avenue i

State College, PA 16803 Mr. Roland Fletcher Department of Enviroriment Manager-Financial Control & Co-Owner 201 West Preston Street Affairs Baltimore, MD 21201 Public Service electric and Gas Company A. F. Kirby, til P.O. Box 236 l

External Operations - Nuclear Hacocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Manager-Peach Bottom Licensing j

Wilmington, DE 19899 PECO Energy Company Nuclear Group Headquarters PECO Energy Company Correspondence Control Desk Plant Manager P.O. Box No.195 Peach Bottom Atomic Power Station Wayne, PA 19087-0195 1848 Lay Road Delta, PA 17314