. "p..
Oc$
<
,c
't
'
N0y
9 1990
Docket Nos. 50-277/DPR-44
50-278/DPR-56
<
Philadelphia Electric Company
Correspondence Control Desk
NITN:
Mr. D. M. Smith
Senior Vice President-Nuclear
P. O. Box 195
Wayne, PA 19087-0195
Gentlem.m:
Subje;t:-
Combined Inspection 50 277/90-80, 50-278/90-80
'
This letter transmits the findings of the Safety System Functional Inspection (SSFI) Corrective
Action Review Team conducted by Mr. J. J. Lyash and others from September 17 through
October 3,1990,.at the Peach Bottom Atomic Power Station, Delta, Pennsylvania. Mr. Lyash
discussed the results of this inspection with Mr. J. Franz and other members of your station and
-
engineering departments.
The team found that your corrective actions implemented in response to NRC SSFI Team
Inspection 90 200 were generally acceptable. The team also evaluated weaknesses noted in
several program areas during the SSFI In each of the areas reviewed clear progress has been
made during the last year. We encourage your continued efforts to strengthen these programs.
During this inspection, some additional weaknesses were noted by the team. These should
receive similar attention to ensure timely review and resolution.
No written response to this letter is required. Your cooperation is greatly appreciated.
,
Sincerely,
p.t
, . . .j
. .
o .. i . .
A
A. Randolph Blough, Chief
Projects Branch 2
Division of Reactor Projects
,
,
I
Enclosures:
NRC Region I Combined Inspection Report 50-277/90-80; 50-278/90-80
OFFICIAL RECORD COPY
,
1(
Gt.
,,e
w w nqW
gg
a
. - -
.
. .
-
,
.
r
v.
..
.
Philadelphia Electric Company
2
i
cc w/ encl:
D. B. Miller, Vice President, Peach Bottom Atomic Power Station
4). R. Helwig, Vice President, Nuclear Engineering and Services
,J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station
-E. P. Fogarty, Project Manager, Peach Bottom Atomic Power Station
E. J. Cullen, Jr., Esquire, Assistant General Counsel
-G A. Hunger, Jr., Director, Licensing Section
R. J. Lees, Chairman, Nuclear Review Board
<A. A. Fulvio, Regulatory Engineer, Peach Bottom Atomic Power Station
M. Urban, General Manager, Fuels Department, Delmarva Power
S. B. Ungerer, Atlantic Electric
-B. W. Gorman, Manager-External Affairs, Public Service Electric & Gas Co.
-T. B. Conner, Jr., Esquire (Without Report)
R. L. Hovis, Esquire (Without Report)
-R. McLean, Power Plant Siting, Nuclear Evaluations
A. H. Walter, Chief Engineer, Public Service of Maryland
<D. Poulson, Secretary of Harford County Council
Public Document Room (DPR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
OFFICIAL RECORD COPY
l
- . -
-
-
-
- -
. - . .
-
-
. -
. -
.-
-
!
,.
_-l '
!
,
. . .
'
-
.
Philadelphia Electric Company
3
bec w/ encl:
Region I Docket Room (with concurrences)
l
Management Assistant, DRMA (w/o enclosure)
R. Blough, DRP
L. Doerficin, DRP
R. Kaufman, DRP
M, Miller, DRP
i
}{. Abraham, PAO (2)
G. Suh, NRR
J. Joyner, DRSS
i
J, Caldwell, EDO Office
r
J. Durr, DRS
P. Koltay, NRR
C.' Anderson, DRS
P. 'K. Eapen, DRS
R. McBrearty, DRS
bec w\\ letter and Executive Summary only:
!
W. Hehl, DRP
J. Wiggins, DRP -
j
W. Hodges, DRS
~
R, Gallo, DRS
M. Knapp, DRSS
T. Kenny, SRI-Limerick
l
B. Norris, DRP
W. Butler, NRR
<
l
1
-CONCU
NCES:
,
tki '
cY
l-
RI:
DRP
'
SLyash
Doerflein
Blough
11/'l/90
11/3/90
1IQ/90
OFFICIAL RECORD COPY
,