MAY 181989
Docket Nos. 50-277
50-278
Philadelphia Electric Company
ATTN: Mr. C. A. McNeill
Executive-Vice President-Nuclear
Correspondence Control Desk
P. O. Box 7520
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
Inspection Nos'. 50-277/89-13 and 50-278/89-13
This letter refers to'the electrical inspection conducted by Mr. T. Koshy of
this office on April 5-7 and 13,1989 at your corporate office in Philadelphia,
Pennsylvania. Mr. Koshy discussed the findings of-the inspection with
Mr. R. J. Lees _of your staff at the conclusion of the inspection.
In addition,
'Mr. W. V. Johnston (NRC) and Mr. R. J. Lees (PEco) discussed the inspection
findings in a-conference call on April 14, 1989.
The_ areas' examined during the inspection were Unit 2 restart issues identified
in the special electrical team inspection (Report No. 50-277/278-89-07) conducted
on , January 30 - February 10, 1989 and the corrective actions taken by your
staff.
Based on our inspection, continued management attention should be given to
resolution of the following issues for Unit 3.
Voltage Adequacy of DC Equipment
Capacity Margin for Batteries
Emergency Diesel Generator Load Evaluation and Load Control Program
These issues should be resolved before Unit 3 restart.
We acknowledge your letter dated April Id,1989 committing to perform DC system
tests for Unit 2 before the end of the next Unit 2 refueling outage or at any
outage of sufficient duration that commences after July 17, 1989.
'
l
Within the scope of this inspection, no violations we e observed.
!
l
OFFICIAL RECORD COPY
IR PB 2&3 89-13 - 0001.0.0
e906020049 89051e
05/17/89
,
l
ADOCK 05000277
Q
\\(
g ;cj
!
L____ _ _ _
_ _ _ - -
-
._
.
ya
i
1
,
'
MAY 181989
Philadelphia Electric Company
2
l
f'
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
Original Signed By:
Ylilliam V. Johnston
Thomas T. Martin, Director
Division of Reactor Safety
4
Enclosure: Combined NRC Region I Inspection Report Numbers 50-277/89-13 and
50-278/89-13
cc w/ encl:
. John S. Kemper, Sr., Senior Vice President-Nuclear
J. W. Gallagher, Vice President, Nucleer Services
E. C. Kistner, Chairman, Nuclear Review Board
Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station
' Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
John F. Franz, Plant Manager, Peach Bottom Atomic Power Station
Troy B. Conner, Jr. , Esquire
W. H. Hirst, Director, Joint Generation Projects Department,
Atlantic Electric
Bryan W. Gorman, Manager, External Affairs
Eugene J. Bradley, Esquire, Assistant General' Counsel (Without Report)
Raymond L. Hovis, Esquire
i
Thomas Magette, Power Plant Siting, Nuclear Evaluations
W. M. Alden, Director, Licensing Section
Doris Poulsen, Secretary of Harford County Council
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (HSIC)
NRC Resident Inspector
4
Commonwealth of Pennsylvania
'
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP
PA0 (23) SALP and (2) Inspection Reports
l
Robert J. Bores, DRSS
R. Martin, NRR
M. Johnson, ED0
!
0FFICIAL RECORD COPY
IR PB 2&3 89-13 - 0001.2.0
'
05/11/89
--_
---_-z
- - -
- _ -
_
-
-
- - . - -
_
-- a
p
,,
t-
i '
- o g;
,
MAY 181989.
f
'
Philadelphia Electric Company
3
'Y
i
i
-
bM
c0
,
-
RI:DRS
RI.DRS
I:DRS
!
- DRS'
TKoshy/rw
CAnderson
JStrosnider
4/gthew
4/27/89
7/89
4/87/89
g/ 3 /89
o
0FFICIAL RECORD COPY
IR PB 2&3 89-13 - 0002.0.0
04/26/89
.-
-~------Au______
_ _ _ _ _ _ _ , _