ML20055C876
| ML20055C876 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/15/1990 |
| From: | Blough A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20055C877 | List: |
| References | |
| NUDOCS 9006250310 | |
| Download: ML20055C876 (2) | |
See also: IR 05000277/1990010
Text
_ _ - _ _ _
_ - _ _ _ _ _ _ _ _
_ _ __ - - __ -_ _ __ - _ _ _ _ _ _ _ ___ - _
__
i
- 4
g
.-
- .
,
.,c
15 JUN 1990
'
Docket Nos. 50-277/DPR-44
50-278/DPR-56
Philadelphia Electric Company
Correspondence Control Desk
ATTN:
Mr. D. M. Smith
Senior Vice President-Nuclear
P. O. Box'195
Wayne, PA 19087-0195
l
1
Gentlemen:
I
Subject:
Combined Inspection 50-277/90-10; 50-278/90-10
This letter transmits the findings of the routine resident safety inspection by
!
Messrs. J. J. tresh, R. J. Urban, L. E. Myers and others from April 3 through
!
May-15 1990, n the Peach Bot +n
tomic Power Station, Delta, Pennsylvania.
These findings were based or m erfation of activities, interviews and document
reviews, and have been discunof with Mr. J. F. Franz of your staff.
During the inspection you identified three instances of failure to complete
surveillance testing as reauired by Technical Specifications. .A review of
previously. submitted Licensee Event Reports indicates that this is a recurring
l
problem.
Increased management attention is warranted to ensure that the root
causes are identified and corrected.
Within the-scope of this inspection no violations were identified. A copy of
this letter and the enclosurer are being placed in the NRC Public Document -
o
Room. Your cooperation with us is appreciated.
o
i
i
-
Sincerely,
i
W?%I~
hIbndyif*?by
A. Randolph Blough;dChief
!
Projects Branch 2
Division of Reactor Projects
Enclosure: NRC. Region I Combined Inspection Report 50-277/90-10; 50-278/90-10
g
-i
,
OFFICIAL RECORD COPY
CIR PB 90-10 - 0001.0.0
"
9006250310 900615
06/13/90
PDR- ADOCK 05000277
I
i
\\
C!
pQl
F
i )
.,
b
-
.
.
'-
'~
Ph11adelphia Electric Company
2
15 JUN 1990
cc w/ encl:
D. B. Miller, Vice President, Peach Bottom Atomic Power Station
D. R. Helwig, Vice President, Nuclear Engineering and Services
J, F. Franz, Plant Manager, Peach Bottom Atomic Power Station
E. J. Cullen, Jr., Esquire, Assistant General Counsel'
G. A. Hunger, Jr., Director, Licensing Section
R. J. Lees, Chairman, Nuclear Review Board
A. A. Fulvio, Regulatory Engineer, Peach Bottom Atomic Power Station
J. Urban, General Manager, Fuels Department, Delmarva Power
W. H. Hirst, Director, Joint Generation Projects Dept., Atlantic Electric
B. W. Gorman, Manager-External Affairs, Public Service Electric & Gas Co.
T. B. Conner, Jr., Esquire (Without Report)
R._L. Hovis, Esquire (Without Report)
T. E. Magette, Power Plant Siting, Nuclear Evaluations
J. H. Walter, Chief Engineer, Pub *ic Service of Maryland
!
D. Poulson, Secretary of Harford County Council
-F
Public Document Room (DPR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
HRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o anclosure)
SRI, Limerick 1 and 2
K. Abraham, Public Affairs Officer (2)
G. Y. Suh, Project Manager, NRR
R. R. Bellamy, Branch Chief, DRSS
J. Caldwell, ED0 Office
E. Baker, NRR
J. Strosnider (see para. 3.2)
P.K. Eapen (see para. 3.3)
R. Bores (see para. 9.2)
bec w/ Executive Summary Only
W. Kane, DRP
'J. Wiggins, DRP
W. Hodges, DRS
J. Durr, DRS
R. Gallo, DRS
M. Knapp, DRSS
Butler, NRR
8RI:DRP
RI:DRP
RI:DRP
-Lyash/rh1
Doerflein
Blough
6/I5/90
6/6/90
6// f/90
0FFICIAL RECORD COPY
CIR PB 90-10 - 0001.1.0
06/14/90
,
.
-