ML20059K721
| ML20059K721 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/06/1990 |
| From: | Durr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20059K725 | List: |
| References | |
| NUDOCS 9009240198 | |
| Download: ML20059K721 (2) | |
See also: IR 05000277/1990015
Text
1
,
- . -
.
..
s.
4
i
SEP 0 61990
i
Docket Nos.
50-277
50-278
Philadelphia Electric Company
ATTN: Mr. D. M. Smith
Senior Vice President-Nuclear
i
Nuclear Group Headquarters
Correspondence Control Desk
.
.P. O. Box 195
.
Wayne, Pennsylvania
19087-0195
Gentlemen:
i
Subject: Combined Inspection Report Numbers 50-277/90-15 and 50-278/90-15
This letter refers to the routine safety inspection conducted by Messrs. J. Lara
and C. Woodard of this office on July 23-27, 1990 at the Peach Bottom Atomic
Power Station, Units 2 and 3 in Delta, Pennsylvania.
Mr. Lara discussed the
,
findings of the inspection with Mr. J. Franz of your staff at the conclusion
of the inspection.
~ Areas examined during this inspection are described in the NRC Region I
,
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspectors.
<
'
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This violation has been
categorized by severity level in accordance with the " General Statement of
_ Policy and Procedure for NRC Enforcement Actions," 10 CFR_Part 2, Appendix C
'
(Enforcement Policy). You are required to respond to this letter and in
i
preparing your response, you shouid follow the instructions in Appendix A.-
Your cooperation with us in this matter is appreciated.
Sincerely,
Oriciaal Sigaed Ey a
E, H. Fnny
y
N Jacque P. Durr, Chief
Engineering Branch
Division of Reactor Safety
Enclosure: Combined NRC Region I Inspection Report Numbers 50-277/90-15;
50-278/90-15
l '
9009240198 900906
'
ADOCK 05000277
g
W W' U
OFFICIAL RECORD COPY
CIR PB 90-15 - 0001.0.0
09/05/90
$
$
.
.
SEP 0 6 60
~'
'
,.
Philadelphia Electric Company
2
,
cc w/ enc 1:
D. R. Helwig, Vice President, Nuclear Engineering and Services
R. J. Lees, Chairman, Nuclear Review Board
D. B. Miller, Vice President, Peach Bottom Atomic Power Station
J. Urban, General Manager, Fuels Der rtment, Delmarva Power & Light Co.
J. F. Franz, Plant Manager, Peach oottom Atomic Power Station
A. A. Fulvio, Regulatory Engineer, Peach Bottom Atomic Power Station
E. P. Fogarty, Project Manager, Peach Bottom Atomic Power Station
T. B. Conner, Jr. , Esquire
W. H. Hirst, Director, Joint Generation Projects Department,
'
Atlantic Electric
B. W. Gorman, Manager, External Affairs
E. J. Cullen, Esquire, Assistant General Counsel (Without Report)
R. L. Hovis, Esquire
R. McLean, Power Plant Siting, Nuclear Evaluations
G. Hunger, Manager, Licensing Section
D. Poulsen, Secretary of Harford County Council
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
d
Public Document Roor (PDR)
Local Public Document Room (LPDR)
NuclearSafetyInformationCenter(NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvanis
bec w/ enc 1:
Region 1 Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
.
R. Bellamy, DRSS
DRP Section Chief
R. Blough, DRP
-P.
Kaufman, DRP
L. Doerflein, DRP
M. Conner, SALP Reports Only
K. Abraham, PA0 (20) SALP Report and (2) All Inspection Reports
M. Miller, SLO
J. Caldwell, EDO
G. Suh, NRR
& %
fNhk/fp
RI:DR
RI:DRS
RI: dis
Rl:DRS
Lar
Woodard
Anderson
Durr
,
cN
p/[/90
'
8/1,1'90
8/J8/90
8/l # 90
0FFICIAL RECORD COPY
CIR PB 90-15 - 0002.0.0
08/22/90
,