Forwards Insp Repts 50-277/98-11 & 50-278/98-11 on 981110- 990104 & Notice of Violation Re Failure to Complete Facility Licensed Operator Requalification Program
ML20202J525
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/01/1999
From: Cowgill C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20202J530 List:
References
50-277-98-11, 50-278-98-11, NUDOCS 9902090162
Download: ML20202J525 (4)


See also: IR 05000277/1998011

Text

{{#Wiki_filter:_ _ ___.___.__ . . . . . . . .. . _. _ _ E February 1,1999 Mr. G. Rainey, President PECO Nuclear - Nuclear Group Headquarters - Correspondence Control Desk P.O. Box 195 Wayne, Pennsylvania 19087-0195 SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-277/98-11, 50-278/98-11, 72- 1027/98-11 AND NOTICE OF VIOLATION ..- Dear Mr. Rainey: On January 4,1998, the NRC completed an inspection at the Peach Bottom Atomic Power ' Station. The enclosed report presents the results of that inspection. ( Your staff continued to operate both units safely. Control room personnel performer 1 wet during - two separate electrical transients and during the Unit 3 load changes to repair an instrument _ nitrogen leak and replace the main turbine lubricating oil baffier valve and pump. During the inspection period, we noted that an inadequate breaker manipulation procedure resulted in the unexpected loss of one off site power source. Subsequent operator action was required to restore affected plant equipment to a normal plant lineup. Previous procedure adequacy problems were documented in inspection Reports 50-277(278)/98-02 and 50- 277(278)/98-06. Your staff's continued attention to this problem is warranted. . Based on the results of this inspection and an NRC investigation, the NRC has determined that one violation of NRC requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding it are described in detail in - the subject inspection report. The violation is of concern because: 1) three licensed F operators failed to complete your facility licensed operator requalification program for the period April 1994 through March 1996 and the training was not made up until April 1998, in some cases; 2) the failure was due to a program inadequacy (systemic cause) and the inadequacy apparently caused an inaccurate license renewal application to be submitted to the NRC upon which the NRC issued a renewed operator license. Our investigation found that the violation was not willful but was related to programmatic causes. The 01 , investigation synopsis is attached to the enclosed inspect;on report. / - The NRC concluded that your review of this matter was thorough after its identification in ' February 1998. You also identified that the lack of a single point of contact in your process for _ preparing and sending the forms was another cause of the inaccurate license renewal f application. Since your corrective actions are almost complete and appear to address the underlying causes for this violation, no response is required. However, if in the course of your [('d /

9902090162 990201 PDR ADOCK 05000277 G PDR _ . . . _ _ . . . . - - - - - - - - -

r. i .u.. !

L G. Rainey 2 review, you find that our understanding is substantially different from yours, i.e., another l systemic cause was found, you should also follow the instructions specified in the enclosed Notice. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its ! enclosures will be placed in the NRC Public Document Room (PDR). J l We appreciate your cooperation. 1 Sincerely, L Original Signed By:

1 Curtis J. Cowgill, Chief Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-277, 50-278,72-1027 l License Nos.: DPR-44, DPR-56 Enclosures: 1. Notice of Violation 2. Inspection Report No. 50-277/98-11,50-278/98-11 and 72-1027/98-11 , i l ! ! 1 . l i

! ! ! l ! 1 <

, . ._ m. . - _ _ _ . _ _ - - _ . . . ~ __ _ _ . _ _ . , G. Rainey 3 cc w/encis: J. Hagan, Vice President, Nuclear Station Support ' J. Doering, Vice President, Peach Bottom Atomic Power Station M. Wamer, Plant Manager, Peach Bottom Atomic Power Station 1 G. D. Edwards, Chairman, Nuclear Review Board R. Boyce, Director, Nuclear Quality Assurance

A. F. Kirby, lil, Extemal Operations - Delmarva Power & Light Co. A. A. Winter, Manager, Experience Assessment J. W. Durham, Sr., Senior Vice President and General Counsel H. C. Kresge, Managei External Operations, Connectiv N. J. Sproul, Manager, Financial Control & Co-owner Affairs, Connectiv R. McLean, Power Plant Siting, Nuclear Evaluations D. Levin, Acting Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr. & Mrs. Kip Adams Commonwealth of Pennsylvania State of Maryland TMI- Alert (TMIA) 4 i i i

m , :- e I G. Rainey . 4_. Distnbution w/encis: Region i Docket Room (with concurrences) Nuclear Safety information Center (NSIC) NRC Resident inspector PUBLIC . , H. Miller, RA/J. Wiggins, DRA 'C. Cowgill, DRP ~ D. Florek, DRP ' C. O'Daniell, DRP Distribution w/encis: (Via E-Mail) G. Shear, OEDO V/. Dean, PDI-2, NRR - - . M. Thadani, NRR B. Buckley, NRR R. Correia, NRR

l W. Kane, NMSS/SFPO S. Shankman, NMSS/SFPO l E. Leeds, NMSS/SFPO l ' M. Ross-Lee, NMSS/SFPO l~ P. Eng, NMSS/SFPO DOCDESK ' Inspection Program Branch, NRR (IPAS)

l-i l i DOOUMENT NAME: G:\\ BRANCH 4\\PB\\PB981111.WPD To receive a copy of this document. Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy OFFICE Rl/% l Rl/DRP [[ L - NAME DFlorejhF CCowgil%3o l DATE OjpD(/$ 01/XX/99 G y7qp7 OFFICIAL RECORD COPY , ! i i 1 e d i ! i .. -. - . . - . . . }}