IR 05000277/1998008

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-277/98-08 & 50-278/98-08 Issued on 981028
ML20198L446
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/21/1998
From: Anderson C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
50-277-98-08, 50-277-98-8, 50-278-98-08, 50-278-98-8, NUDOCS 9901050023
Download: ML20198L446 (3)


Text

--

.

e o l December 21, 1998

' Mr. G. Rainey, President PECO Nuclear Nuclear Group Headquarters Correspondence Control Desk P.O. Box 195 -

Wayne, Pennsylvania 19087-0195 SUBJECT:. COMBINED INSPECTION REPORT NOS. 50-277/98-08 AND 50-278/98-08

Dear Mr. Rainey:

This letter refers to your November 24,1998 correspondence, in response to our October 28,1998 letter.

Thank you for informing us of the corrective and preventive actions documented in your letter. These actiot?s will be examined during a future inspection of your licensed program.

Your cooperation with us is appreciated.

Sincerely, Original Signed by:

Clifford J. Anderson, Chief Projects Branch 4 Division of Reactor Projects Docket Nos. 50-277;50-278

.

t A

. $ON y 050003 0FFICIAL RECORD COPY IE:01

_ _ _ _

._ _. . . _ . 4 _ _ . _ _-- . _ _ _ __ ____.__.___.___._ _

, ,

s i  !

'

l Mr. !

cc w/ Licensee Response Ltr:

R. Boyce, Director, Nuclear Quality Assurance

'

G. J. Lengyel, Manager, Experience Assessment J. W. Durham, Sr., Senior Vice President and General Counsel I T. M. Messick, Manager, Joint Generation, Atlantic Electric W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas R. McLean, Power Plant Siting, Nuclear Evaluations

!

D. Levin, Acting Secretary of Harford County Council  ;

R. Ochs, Maryland Safe Energy Coalition '

J.' H. Walter, Chief Engineer, Public Service Commission of Maryland Mr. & Mrs. Kip Adams Commonwealth of Pennsylvania i L

'

- State of Maryland TMl- Alert (TMIA)

cc w/o Licensee Response Ltr-G. Edwards, Chairman, Nuclear Review Board and Director, Licensing J. Doering, Vice President, Peach Bottom Atomic Power Station l J. Hagan, Vice President, Nuclear Station Support .

! A. F. Kirby,111, External Operations - Delmarva Power & Light Co.

l M. Warner, Plant Manager, Peach Bottom Atomic Power Station Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance l

u l

!

l i

I-i l

t i

I

.

ja

!

l l

._ __. _ ._. _ _ _ _ - _ --

.. - _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _

s . -

Mr. Distribution w/ Licensee Response Letter:

Region I Docket Room (with concurrences)

-

G. Shear, OEDO R. Capra, PDl-2, NRR M.' Thadani, NRR B. Buckley, NRR R. Correia, NRR C. Anderson, DRP D. Florek, DRP M. Campion, ORA R.Junod,DRP Nuclear Safety Information Center (NSIC)

NRC Resident inspector

- PUBLIC Inspection Program Branch, NRR (IPAS)

DOCDESK DOCUMENT NAME: A:\RL980808.P8 To receive a copy of this document, indicate in the box: "C" = Copy without attachment / eryc {osure s

"E" = Copy with attachment / enclosure "N" = No copy OFFICE RL/ppj Rl/DRP ,,

NAME DgY ekQ CAnderson (lh DATE 12f///98' 12/ t//98

'

OFFICIAL RECORD COPY

. . .

.

.. .

..

.

_

- - - -- -

.

,

,

,

  • Vic2 President Peach Bottom Atomic Power Station

'

v PECO NUCLEAR gigg;gma""v A Unit of PECO Energy P 7 032

$$f5 Fax 717 456 4243 E-mast jdoenngcepeco-energy.com November 24,1998 Docket Nos. 50-277

-

50-278 License Nos. DPR-44 1 DPR-56 I

's TU. S. Nuclear Regulatory Commission attn.: Document Control Desk Washington, DC 20555 Subject: Peach Bottom Atomic Power Station Units 2 & 3 j Response to Notice of Violations (Combined Inspection . Report No. 50- j 277/98-08 & 50-278/98-08) l l

Gentlemen:

In response to your letter dated October 28,1998, which transmitted the Notice of Violation (NOV), concerning the referenced inspection report, we submit the attached  ;

'

respcnse. The subject report concerned a Residents' Integrated Safety inspection that was conducted August 11,1998 through September 21,1998.

If you have any questions or desire additional information, do not hesitate to contact us.

NA ~[ ~2bahxh

'

l sf4M1 John Doering, Jr.

Vice President, Peach Bottom Atomic Power Station Attachments MT/mt i

cc: N.J. Sproul, Public Service Electric & Gas R. R. Janati, Commonwealth of Pennsylvania H. J. Miller, US NRC, Administrator, Region I A. C. McMurtray, US NRC, Senior Resident inspector R.1. Mcl.ean, State of Maryland A. F. Kirby 111, DelMarVa Power / Atlantic Electric CCN 98-14089

! @ MOO M

.._ .__

_-__ _ . ._ _ - . . - - - .-

,

-

.

l.

l RESPONSE TO NOTICE OF VIOLATION 98-08

- Restatement of Violation ,

l l l Peach Bottom Unit 3 Technical Specification 5.4.1 requires, in part, that written procedures be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Appendix A, November 1972. The procedures listed in Regulatory Guide 1.33, Appendix A, include reactor water cleanup system startup. ,

l Contrary to the above, prior to September 12,1998, PECO failed to properly maintain system operation procedure (SO) 12.1.A-3, Revision 19, " Reactor Water Cleanup (RWCU) System Startup for Normal Operations or Reactor Vessel Level Control," resulting in two RWCU system events in August 1998. In the first instance, inadequate instructions for verifying the position of the 'B' non-regenerative heat exchanger vent valves led to a steam leak and unplanned entry into emergency operating procedures. In the second instance, inadequate instructions for verifying the 'B' demineralizer inlet valve position resulted in an engineered safety feature actuation (i.e., automatic system isolation) while placing the demineralizer in service.

This is a Severity Level IV violation (Supplement 1).

Rvson(s) For The Violations The reason for the violation in the first instance was an inadequate shift turnover which resulted in wrong assumptions by the relieving shift. During the system isolation for maintenance, both trains were isolated and vented to support the maintenance activities. At the time of restoration, one shift partially restored the 'A' train but did not communicate that the 'B' train needed to be aligned. The relieving crew completed aligning the 'A' train and assumed the 'B' train did not have to be re-aligned since maintenance was performed on the 'A' train. Therefore, the vent valves on the 'B' non-regenerative heat exchanger were not closed as required.

The second instance was attributed to less than adequate control of equipment during a post maintenance test (PMT). The maintenance PMT did not specify valve lineup requirements or direct equipment / valve manipulations to accomplish the stroke testing of the 'B' Filter /demineralizer (F/D)

plenum vent valve. The technicians performing the PMT were aware of the need to manipulate valves to satisfy the logic to allow cycling the 'B' F/D plenum vent valve and did change valve positions to satisfy the logic. Following satisfactory completion of the PMT, the technicians initiated actions to return the valves to their correct position; however, they did not verify that the valves did go to their correct position. Since the 'B' demineralizer inlet isolation valve was not in its proper position during system restoration, the system was not re-pressurized as expected. During system restoration, sudden repressurization of the 'B' F/D resulted in a high flow isolation.

Corrective Steps That Have Been Taken And The Results Achieved In the first instance, the non-regenerative heat exchanger vent valves were closed to stop the leaks in I the non-regenerative heat exchanger room. Operations checked other valves in the system to verify

! proper positions. The Reactor Water Cleanup System (RWCU) was returned to service on August 19, l 1998.

l

_ _ _ _ _ _ _ _

.

-

. . . _. .- .- - _ - _ _~ . -- . - - - _ . - - - - - _ - _ - . - -

,

l, ;

.

In the second instance, the RWCU isolation was verified per procedure GP-8B, 'PCIS isolation -

Groups Il and lil', the isolation reset, and the RWCU system was returned to service on August 29, 1998.

Corrective Steps That Will Be Taken To Avoid Further Violations The Vice President has appointed the Director - Outage Management to chair a multi-discipline team to review programs providing guidance for configuration management. This review is to identify and implement actions for improving the programs. The team has met several times establishing goals and a schedule for achieving various milestones in the project.

The Independent Safety Engineering Group (ISEG) recently performed a review of processes for control of equipment status during maintenance, testing and return to service. ISEG approached the review by developing a map of processes that cause equipment to be manipulated and involve a turnover from operations to a work group. ISEG then reviewed the procedures that govern the processes involved in the map. The review consisted of a task analysis that focused on barriers contained within the processes. These reviews were to identify gaps or potential weaknesses in the processes. Results of this initiative are being incorporated in a report currently in draft.

A review of the processes and current performance enhancement data indicate that there may be some programmatic weaknesses which have resulted in some configuration controlissues. These areas are being reviewed in more detail to determine what additional enhancements are required. The areas being reviewed are:

  • Performance Enhancement Program (PEP) data from PBAPS is being reviewed to determine if similar causes have resulted in a loss of system status control.

. System status control process for on-line system outages.

  • Current procedural guidance for equipment / system status changes and guidance for declaring systems operable.

. System status files in the control room to determine if they are an appropriate resource for obtaining system status information.

. Evaluate and implement corrective actions for improving the clearance and tagging process.

Operations recognizes that restoration / tag releases do not receive the same attention (planning and sequencing) as applying clearance tags.

D'te When Full Compliance Will Be Achieved Full compliance was achieved on August 20,1998, when the Reactor Water Cleanup system was returned to service. -

Priar Plant Status /Confiauration Control Corrective Actions Effectiveness l l

The corrective actions initiated to address Violation 98-01 were to correct specific configuration control issues. The corrective actions were narrowly focused to correct specific human performance issues related to the event and therefore would not have been effective in preventing these recent events.

_ _ _