Docket Nos. 50-277/DPR-44
50-278/DPR-56
Philadelphia Electric Company
Correspondence Control Desk
ATTN: Mr. C. A. McNeill
Executive Vice President-Nuclear
P. O. Box 7520
)
Philadelphia, Pennsylvania 19101
Gentlemen:
!
Subject:
Combined Inspection 50-277/89-16; 50-278/89-16
This letter transm ts the findings of a special restart safety inspection by
.
Mr. T. P. Johnson and members of the NRC restart staff on May 7 to June 17,
1989, at the Peach Bottom Atomic Power Station, Delta, Pennsylvania.
These
findings were based on observation of activities, interviews, measurements and
document reviews, and have been disqussed with Mr. J. F. Franz of your staff.
A copy of this letter and the enclosures are being placed in the NRC Public
Document Room.
During this inspection, active plant management involvement in plant operations
and effective management self assessment activities were noted. However, it
appears that certain of your activities were not conducted in full compliance
with NRC requirements, as set forth in the Notice of Violation, enclosed here-
with as Appendix A.
One violation has been categorized by severity level in
accordance with the " General Statement of Policy and Procedure for NRC Enforce-
ment Actions," 10 CFR Part 2, Appendix C (Enforcement Policy).
You are re-
quired to respond to this ietter and in preparing your response, you should
follow the instructions in Aspendix A.
The response directed by this letter and the accompanying Notice are not
subject to the clearar,ce procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us is appreciated.
Sincerely,
M 8d.Sl@ GD BY
William F. Kane, Director,
Division of Reactor Projects
0FFICIAL RECORD COPY
CIR PB 89-16/16 - 0001.0.0
8907060104 890626
ADOCK 05000277
L\\
O
Ol
-
- _ - _
~
_
_ - - .
k
.=
Philadelphia Electric Company
2
_
26 JUN 1889
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Combined Inspection Report No. 50-277/89-16 and
50-278/89-16
cc w/encis:
John S. Kemper, Sr., Senior Vice President-Nuclear
Jack Urban, General Manager, Fuels Department, Delmarva Power
D. M. Smith, Vice President, Peact. Bottom Atomic Power Station
D. Helwig, General Manager, Nuclear Services
E. C. Kistner, Chairman, Nuclear Review Board
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic
Electric
B. W. Gorman, Manager-External Affairs, Public Service Electric & Gas
Company
J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station
Troy B. Conner, Jr. , Esquire (Without Report)
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations
G. A. Hunger, Jr. , Director, Licensing Section
Doris Poulsen, Secretary of Harford County Council
Line Honan
Put.lic Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/encis:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
T. Kenny, Acting Section Chief, DRP
PA0 (2) SALP Reports Only + All Inspection Reports
Monte Conner, SALP Reports Only
SRI, Limerick I
Karl Abraham, Public Affairs Officer (2)
R. E. Martin, Project Engineer, NRR
W. Cook, SRI, NMP1/2
J. Johnson, DRP
/
4
pRIeRP
/
h
Rg.
RI:DRP
Kenny /rbl
Li ville
Kdob
6/M/89