ML20210E581

From kanterella
Jump to navigation Jump to search
Forwards Final Tech Specs Pages for License Change Application.Proposed Change Will Revise Tech Specs to Delete Requirement for Refuel Platform Fuel Grapple Fully Retracted Position Interlock Currently Required by TS
ML20210E581
Person / Time
Site: Peach Bottom  
Issue date: 07/21/1999
From: Hutton J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20210E586 List:
References
NUDOCS 9907280265
Download: ML20210E581 (2)


Text

.

PECO NUCLEAR eccoe e,2,cempaev A Unit of PECO Energy Nuclear Group Headquarters 965 Chesterbrook Bou;evard Wayne PA 19087-5691 July 21,1999 Docket Noa. 50-277 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 Submittal of Final Technical Specification Pages for License Change Applications ECR 99-00352

Reference:

Letter from G. D. Edwards (PECO Energy Company) to U. S. Nuclear Regulatory Commission, dated March 29,1999

Dear Sir / Madam:

In the referenced letter, PECO Energy Company transmitted License Change Application ECR 99-00352. Attachment 1 contains the final Technical Specifications pages for this License Change Application. This proposed change will revise the Technical Specifications (TS) to delete the requirement for the " refuel platform fuel grapple fully retracted position" interlock currently required by TS Surveillance Requirement 3.9.1.1.

If you have any questions, please do not hesitate to contact us.

Very truly yours,

/// /

M mes A. Hutton irector - Licensing

@/l 'i

Enclosures:

Affidavit, Attachment 1 cc:

H. J. Miller, Administrator, Region I, USNRC A. C. McMutray, USNRC Senior Resident inspector, PBAPS R. R. Janati, Commonwealth of Pennsylvania 9907290265 990721 PDR ADOCK 05000277 p

PDR

lEI 4

COMMONWEALTH OF PENNSYLVANIA:

ss.

COUNTY OF CHESTER J. J. Hagan, being first duly sworn, deposes and says:

That he is Senior Vice President of PECO Energy Company; the Applicant herein; that he has read the foregoing letter concerning License Change Application ECR 99-00352 for Peach Bottom Facility Operating Licenses DPR-44 and DPR-56, and knows the contents thereof; and that the statements and matters set forth therein are true and correct to the best of his knowledge, information and belief.

I eni Vice 3 resident Subscribed and sworn to before me this J/P day of 1999.

ajan a w L v

f a

Notary Public Notarial seal y rin T. d ste OxxJ My commission Expires Dec.18, b Member, Pennsylvania Association of Netanes l.,

_ _ _. _ _