JUL 3 01990
Docket Nos. 50-277/DPR-44
50-278/DPR-56
Philadelphia Electric Company
ATrN:
Mr. Dickinson M. Smith
Senior Vice President-Nuclear
- Nuclear Group Headquarters
Correspondence Con'rol Desk
P.O. Box 195
Wayne, PA 19087-(195
Gentlemen:
Subject: Combined Inspection 50-277/90-13; 50-278/90-13
l
This letter transmits the findings of the routine resident safety inspection by Messrs. J. J. Lyash,
!
!
R. J. Urban, and L. E. Myers from May 16, through July 2,1990, at the Peach Bottom Atomic
Power Station, Delta, Pennsylvania. These findings were based on observation of activities,
interviews and document reviews, and have been discussed with Mr. J. F. Franz of your staff.
It appears that one of your activities wasn't conducted in full compliance with NRC
requirements, as set forth in the Notice of Violation (NOV), enclosed -as Appendix A.
Implementation of electrical cable splices on several emergency diesel generator support
components weren't performed in accordance with established design specifications, and with
current drawing revisions. Previous examples of inadequate electrical cable splices for safety-
related equipment were documented in NRC Inspection Report 89 22. Corrective actions
implemented in response to that incident apparently have not been effective. This violation has
been characterized by severity level in accordance with the " General Statement of Policy and
Procedure for NRC Enforcement Actions," 10 CFR 2, Appendix C (Enforcement Actions).' in
responding, please follow the instructions contained in Appendix A. Your cooperation with us
is appreciated.
Sincerely,
ORIGINAL. SIGNED BY:
~
\\
A. Randolph Blough, Chief
I
Projects Branch 2
!
Division of Reactor Projects
- Enclosure: NRC Region 1 Combined Inspection Report 50-277/90-13; 50-278/90-13
CFFICI AL P.T. CORD COM
9009000088"Yoo73o
-~
~ ~ = - " ' '
s
PDR ,ADOCK 05000277
Q
-
.
s;
".
.
.
.
.-
.,
l
DN
3
4%
cc w/ encl:
D. B. Miller, Vice President, Peach Bottom Atomic Power Station
D. R. Helwig, Vice President, Nuclear Engineering and Services
J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station
E. J. Cullen, Jr., Esquire, Assistant General Counsel (Without Report)
G. A. Hunger, Jr., Director, Licensing Section
R. J. I.ces, Chairman, Nuclear Review Board
A. A. Fulvio, Regulatory Engineer, Peach Bottom Atomic Power Station
J. Urban, General Manager, Fuels Department, Delmarva Power & Light Co.
W. H. Hirst, Director, Joint Generation Projects Dept., Atlantic Electric
B. W. Gorman, Manager-External Affairs, Public Service Electric & Gas Co.
,
T. B. Conner, Jr., Esquire (Without Report)
{
R. L. Hovis, Esquire (Without Report)
1
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
D. Poulson, Secretary of Harford County Council
Public Document Room (DPR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bec w/ encl:
Regicn I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enclosure)
SRI, Limerick I and 2
K. Abraham, Public Affairs Officer (2)
G. Y. Suh, Project Manager, NRR
R. R. Bellamy, Branch Chief, DRSS
W. Pasciak (See Paragraph 2.1)
?
J. Caldwell, EDO Office
L. Doerflein, DRP
POA(2)
C. Anderson, DRS
C
RRENCES:
'
f
P
Rl:DRP
RI:DRP
l'yash
Doerflein
Blough
!
075790
07/3u90
07/ 4 90
t
n
OFFICI AL RECORD COFY
u
u
,