ML20205J053

From kanterella
Jump to navigation Jump to search
Ack Receipt of 990326 Notice of Enforcement Discretion Request & Documents Resolution.Notes That E3 EDG Returned to Operable Status on 990327,within 14 Day Completion Time Required by Ts.No Enforcement Discretion Necessary
ML20205J053
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/01/1999
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20205J057 List:
References
NUDOCS 9904090154
Download: ML20205J053 (3)


Text

%.

!N

o. .

April 1,1999 Mr G. Edwards, Director - Licensing PECO Nuclear Nuclear Group Headquarters Correspondence Control Desk P.O. Box 195

. Wayne, Pennsylvania 19087-0195

SUBJECT:

REQUEST FOR ENFORCEMENT DISCRETION AT PEACH BOTTOM UNITS 2&3 Dear Mr. Edwards This letter acknowledges receipt of your March 26,- 1999 Notice of Enforcement Discretion Request (Enclosure 1) and documents its resolution.' You requested that the NRC exercise discretion by not enforcing compliance with the actions required in Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specification 3.8.1.b concerning an inoperable diesel generator.

The contents of that letter were discussed with the NRC in a telephone conversation on March 26,1999.

We did not to grant enforcement discretion at that time but decided to reconsider discretion prior to the expiration of the Limiting Condition of Operation based on work progress on the E3 Emergency Diesel Generator (EDG). We note that the E3 EDG'was returned to an operable j' status on March 27,1999, within the 14 day completion time required by Technical Specifications, so no enforcement discretion was necessary. j Sincerely, i Original Signed By:

l A. Randolph Blough, Director j ,

Division of Reactor Projects '

Docket No. 50-277 -

50-278

Enclosure:

As Stated

~" ~

9904090154 990401 PDR P

ADOCK 05000277 h .O \

PDR y ,

i j

i- ,

'O l

')

Mr. G. Edwards 2 cc w/enci:

J. Hagan, Vice President, Nuclear Station Support I

J. Doering, Vice President, Peach Bottom Atomic Power Station M. Warner, Plant Manager, Peach Bottom Atomic Power Station l R. Boyce, Director, Nuclear Quality Assurance A. F. Kirby, Ill, External Operations - Delmarva Power & Light Co.

A. A. Winter, Manager, Experience Assessment J. W. Durham, Sr., Senior Vice President and General Counsel i H. C. Kresge, Manager, External Operations, Connectiv N. J. Sproul, Manager, Financial Control & Co-Owner Affairs, Connectiv R. McLean, Power Plant Siting, Nuclear Evaluations

, D. Levin, Acting Secretary of Harford County Council l R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr. & Mrs. Kip Adams Commonwealth of Pennsylvania State of Maryland TMI . Alert (TMIA) 1 i

I l

l l

i Mr. G. Edwards 3 Distribution w/ encl:

Region i Docket Room (with concurrences)

Nuclear Safety Information Center (NSIC)

NRC Resident inspector PUBLIC H. Miller, RA/J. Wiggins, DRA (1)

C. Cowgill, DRP D. Florek, DRP D. Cullison, DRP C. O'Daniell, DRP Distribution w/ encl: (VIA E-MAIL)

M. Tschiltz, OEDO E. Adensam, PDI-2, NRR inspection Program Branch, NRR (IPAS)

M. Thadani, NRR B. Buckley, NRR R. Correia, NRR DOCDESK DOCUMENT NAME: G:\ BRANCH 4\PB\NOEDRPLY.WPD To receive a copy of this document, indicato in the box: 'C' = Copy without attachment /anclosure "E" = Copy with attachment / enclosure "N'=

No copy OFFICE *Rl/DRP l 'Rl/DRP l / l l NAME AMcMurtray k'* r ABlough 94d DATE 03//99 '5 /s t .'19 W O3//99 /T A, 03/ /99 03/ /99 03/ /99 OFFlCIAL RECORD COPY I

L