!N o.
April 1,1999 Mr G. Edwards, Director - Licensing PECO Nuclear Nuclear Group Headquarters Correspondence Control Desk P.O. Box 195
. Wayne, Pennsylvania 19087-0195
SUBJECT:
REQUEST FOR ENFORCEMENT DISCRETION AT PEACH BOTTOM UNITS 2&3 Dear Mr. Edwards This letter acknowledges receipt of your March 26,- 1999 Notice of Enforcement Discretion Request (Enclosure 1) and documents its resolution.' You requested that the NRC exercise discretion by not enforcing compliance with the actions required in Peach Bottom Atomic Power Station, Units 2 and 3 Technical Specification 3.8.1.b concerning an inoperable diesel generator.
The contents of that letter were discussed with the NRC in a telephone conversation on March 26,1999.
We did not to grant enforcement discretion at that time but decided to reconsider discretion prior to the expiration of the Limiting Condition of Operation based on work progress on the E3 Emergency Diesel Generator (EDG). We note that the E3 EDG'was returned to an operable j
status on March 27,1999, within the 14 day completion time required by Technical Specifications, so no enforcement discretion was necessary.
j Sincerely, i
Original Signed By:
l A. Randolph Blough, Director j
Division of Reactor Projects Docket No. 50-277 -
50-278
Enclosure:
As Stated
~"
~
9904090154 990401
\\
PDR ADOCK 05000277 h
.O P
PDR y
j
i-
'O
')
Mr. G. Edwards 2
cc w/enci:
J. Hagan, Vice President, Nuclear Station Support I
J. Doering, Vice President, Peach Bottom Atomic Power Station M. Warner, Plant Manager, Peach Bottom Atomic Power Station R. Boyce, Director, Nuclear Quality Assurance A. F. Kirby, Ill, External Operations - Delmarva Power & Light Co.
A. A. Winter, Manager, Experience Assessment J. W. Durham, Sr., Senior Vice President and General Counsel i
H. C. Kresge, Manager, External Operations, Connectiv N. J. Sproul, Manager, Financial Control & Co-Owner Affairs, Connectiv R. McLean, Power Plant Siting, Nuclear Evaluations D. Levin, Acting Secretary of Harford County Council l
R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr. & Mrs. Kip Adams Commonwealth of Pennsylvania State of Maryland TMI. Alert (TMIA) 1 i
I l
l l
i Mr. G. Edwards 3
Distribution w/ encl:
Region i Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)
NRC Resident inspector PUBLIC H. Miller, RA/J. Wiggins, DRA (1)
C. Cowgill, DRP D. Florek, DRP D. Cullison, DRP C. O'Daniell, DRP Distribution w/ encl: (VIA E-MAIL)
M. Tschiltz, OEDO E. Adensam, PDI-2, NRR inspection Program Branch, NRR (IPAS)
M. Thadani, NRR B. Buckley, NRR R. Correia, NRR DOCDESK DOCUMENT NAME: G:\\ BRANCH 4\\PB\\NOEDRPLY.WPD To receive a copy of this document, indicato in the box: 'C' = Copy without attachment /anclosure "E" = Copy with attachment / enclosure "N'=
No copy OFFICE
- Rl/DRP l
'Rl/DRP l
/
l l
NAME AMcMurtray k'* r ABlough 94d DATE 03//99
'5 /s t.'19 W O3//99 /T A, 03/ /99 03/ /99 03/ /99 OFFlCIAL RECORD COPY I
L