l Jraph J. Ht;:n i
Senor Vice President - Nuclear Operatons j
C PECO Nuclear GL 98-01, Supp.1 IECO NUCLEAR PECO EnerDY Company A Unit of PECO Energy 965 Chesterbrook Blvri Wayne. PA 19o87 5691 l
610 640 6100 September 30,1999 Docket Nos. 50-277 50
'8 50.:.52 50-353 License Nos. DPR-44 DPR-56 NPF-39 NPF-85 U S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Peach Bottom Atomic Power Station, Units 2 and 3 Limerick Generating Station, Units 1 and 2 Additional Information Concerning Generic Letter 98-01, Supplement 1," Year 2000 Readiness of Computer Systems at Nuclear Power Plants"
References:
- 1) Letter from J. J. Hagan (PECO Energy Company) to U. S. Nuclear Regulatory Commission, dated June 30,1999
- 2) Letter from B. C. Buckley (U. S. Nuclear Regulatory Commission) to J. A.
Hutton (PECO Energy Company), dated September 22,1999
Dear Sir / Madam:
In the Reference 1 letter, PECO Energy Company provided a response to Generic Letter (GL) 98-01, Supplement 1, " Year 2000 Readiness of Computer Systems at Nuclear Power Plants," dated January 14,1999, for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, and Limerick Generating Station (LGS), Units 1 and 2. In that letter, PECO Energy Company committed to remediating the 3D Monicore System at PBAPS, Units 2 and 3, and the 3D Monicore/ Plant Monitoring System at LGS, Unit 2, by September 30,1999. As identified in Attachment A, the 3D Monicore System at PBAPS, Units 2 and 3, and the 3D Monicore/ Plant Monitoring System at LGS, Unit 2, have been completed, ahead of schedule.
As requested in the Reference 2 letter, PECO Energy Company will notify the U. S. Nuclear Regulatory Commission of the completion of the remaining systems, identified in Attachment A,
\\
requiring remediation at PBAPS, Unit 3.
)
If you have any questions, please contact us.
Very truly yours, 1
Joseph J. Hagan
'\\
Senior Vice Presi
/
Q Nucle r pri 9910150188 990930 PDR ADOCK 050002 7 P
U,-
- 4 1
- S pttmbir 30,1999.
Page 2 cc:
H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident inspector, PBAPS
}-
A. L. Burritt, USNRC Senior Resident inspector, LGS
.. Jim Davis, Nuclear Energy institute, Washington, D. C.
l l
l l
1,-
l..
m l
l.
t Pag 31 of 1 Attachment A Updated Status of Systems to Achieve Year 2000 Readiness SYSTEM DESCRIBE IMPACT SCHEDULE FOR COMPLETION Digital Feedwater Needed for continued plant Completion of outage
- PBAPS, System operations. Work to be currently scheduled to Unit 3 performed during PBAPS, Unit 3 begin September 1999 outage.
3D Monicore Needed for startup and Remediation completed
- PBAPS, continued long-term plant on September 27,1999 Units 2 &
operations.
3 Plant Monitoring Needed for startup and Remediation completed
- LGS, System /3D continued long-term plant on September 24,1999 Unit 2 Monicore operations.
l Turbine Vibration Required for the protection of Completion of outage
- PBAPS, i
Monitor the reactor feed pump and currently scheduled to Unit 3 turbine system. Work to be begin September 1999 performed during PBAPS, Unit 3 outage.
t.