Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing, for Pbaps,Units 2 & 3 & Lgs,Units 1 & 2
ML20212F548
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 09/20/1999
From: Hutton J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
AL-99-03, NUDOCS 9909280255
Download: ML20212F548 (5)


Text

Station Support Department e-

_=E_=. AL 99-03 y

PECO NUCLEAR ecco eme<ov ce,enee, I 965 Chesterbroom Boulevard A Unit of PECO Energy wayne. PA 19087 5691 September 20,1999 Docket Nos. 50-277 50-278 50-352 50-353 License Nos. DPR-44 DPR-56  :

NPF-39 NPF-85 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 Limerick Generating Station, Units 1 and 2 Response to Administrative Letter 99-03

" Preparation and Scheduling of Operator Licensing Examinations" 4 I

Dear Sir / Madam:

NRC Administrative Letter 99-03," Preparation and Scheduling of Operatoi t. censing Examinations," dated August 20,1999, requested licensees to voluntarily submit a response I conceming initial operator licensing exemination needs, including an estimate of the number of I applicants to be examined and intentions regarding the preparation of the examinations.

Attachments 1 and 2 are the PECO Nuclear responses to Administrative Letter 99-03 for Peach Bottom Atomic Power Station (PBAPS) and Limerick Generating Station (LGS), respectively. l The operator licensing examination information for each facility is provided on a separate NRC Form 536.

During Calendar Years CY2000 and CY2002 each, a total of eight (8) candidates are expected to i take the dual site Limited Senior Reactor Operator (LSRO) initial license examination as l indicated in Attachment 2. The schedule for the indicated exam is as follows: the written exam and part of the operating exam will be given at LGS; the remainder of the operating exam will be i completed at PBAPS.

If you have any questions, plea'se contact us.

Sincerely, lf

- . //

MbL mes A. Hutton q y ,1 2 6 r 0 trector- Licensing - 0 Attachments cc: H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident inspector, PBAPS A. L. Burritt, USNRC Senior Resident inspector, LGS 9909290255 990926 i POR ADOCK 05000277 V POR

,z ATTACHMENT 1 PEACH BOTTOM ATOMIC POWER STATION UNITS 2 AND 3 DOCKET NOS. 50-277 50-278 RESPONSE TO ADMINISTRATIVE LETTER 99-03

" Preparation and Scheduling of Operator Licensing Examinations" NRC Form 536, " Operator Examination Licensing Data" l l

I

Attachment 1 NRC FORM 636' U.S NUCLEAR EEGULATORY COMMIS$10N APPROVED BY OMB NO 31600131 (71989) EXPGtES 07tstf2OO2 U re YqU.EMONOmDpisU OPERATOR LICENSING

  • EXAMINATION DATA M*"'EE* ara =EOTN81EEMd N* 'ch*MS**omcI' NOYMa was"g" #

ion. o$$'E3.TaEULs$'edUn"me conecuan

$"auct or sNor. ens $'eIpYEiE"e*s* posse EM coAnchon.

FACLITY NRC REGION Peach Bottom Atomic Power Station, Units 2 & 3 Docket Nos. 50-277/50-278 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY20p_0 CY20D1 CY 2002 CY_2R03 ESTIMATED NUMBER OF LICENSEE PREPARED 0 1 1 1 EXAMINATIONS B. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER CY2000 CY2001 CY 2002 CY_2003 NUMBER OF REACTOR OPERATORS 0 3 3 3 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 0 6 6 6 NUMBER OF SENIOR REACTOR OPER", TORS UPGRADE 0 3 3 3 NUMBER Of SENIOR REACTOR See See OPERATORS LIMITED Attachment 2 ---

Attachment 2 ---

PROPOSED DATES PRIMARY DATE ---

2/5/01 2/11/02 2/10/03 ALTERNATE DATE ---

4/2/01 4/1/02 3/31/03 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY2000 CY_2001 PROPOSED NUMBER FIRST SECOND FIRST SECOND LSTIMATED NUMBER Of CANDIDATES 0 9 0 9 NRC F ORM 536 (71999) PRINTED ON RECYCLED PAPER THIS FORM WAS DESIGNED USINGINFORMS

l l

ATTACHMENT 2 '

LIMERICK GENERATING STATION UNITS 1 AND 2 DOCKET NOS. 50-352 50-353 RESPONSE TO ADMINISTRATIVE LETTER 99-03

" Preparation and Scheduling of Operator Licensing Examinations" l NRC Form 536, " Operator Examination Licensing Data" l s

Attachment 2 NRCEORM638 U.S NUCLEAR REGULATORY COMMISSION (7198W) APPROVED BY 002 NO 31504131 EXPRES C713N2OO2 L'.*."ci n'Mff "8ll"an*.b" RAM" lll:FlP, qn OPERATOR LICENSING

  • 7=

==n 5Ik'a"nsEa

. EXAMINATION DATA hhk%,$"p.e==ni ,g,$ W iiiffuY Q u==2 MYjhEaaig t

'#l3*o",#f.""S.",4". ' air'ck"Tn*CMyn.

cgonoucispan ..no.p.rson a noirequeno e mpons e, = man Fact.lTY NRC REGION Limerick Generating Station, Units 1 & 2 Docket Nos. 50-352/50-353 I A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2000 CY.2.0H1 CY 2002 CY_2003 ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS 1 1 1 1 B. INITIAL OPERATOR LICENSING EXAMINATIONS 4 PROPOSED NUMBER CY2000 0 CY.2_0.01 CY 20.02 CY 2Rp3 NUMBER OF REAC10R OPERATORS 4 5 5 5 NUMBER OF SENIOR REACTOR OPERATORS-INSTANT 5 6 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 4 4 4 NUMBER OF SENIOR REACTOR 8/7/00 8/5/02 OPERATORS LIMITED  ;

8 0 8 0 PROPOSED DATES 4/3/00 4/9/01 3/18/02 3/17/03 PRIMARY DATE 4/10/00 4/16/01 3/25/02 3/24/03 ALTERNATE DATE ___ ___ ___ ___

l C, PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY_2000 CY2001 PROPOSED NUMBER FIRST SECOND FIRST SECOND l

)

ESTIMATED NUMBER OF i CANDIDATES 11 0 11 0 l NRC FORM l.16 (7-1999) PRIN1ED ON RECYCLED PAPER THis FORM W AS DESIGNED U$ LNG INFORMS