Confirms 990115 Conversation Between Mj Williams & P Orphanos Re Arrangements Made for Administration of Licensing Exam at Limerrick Generating Station & Peach Bottom Atomic Power Station During Week of 990705
ML20203A611
Person / Time
Site: Peach Bottom, Limerick  Constellation icon.png
Issue date: 01/22/1999
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9902100044
Download: ML20203A611 (3)


Text

, . - . . ._ . , .. _ . _ . _ . . _ . _ _ _ _ - _ . _ _ _ _ _ , _ . - _ _ _ . _ _ _ .

,f y 4 A

.y a , .

, J .;

33 January 22, 1999-i

, . \'

J> '

Mr. G. Rainey, Prasident 1 W

t (PECO Nuclear . )

" Nuclear Group Headquarters >

Correspondence Control Desk U P.~ O. Box 195.

Wayne, PA ~19087-0195

SUBJECT:

LIMITED SENIOR REACTOR (LSRO) INITIAL EXAMINATIONS - LIMERICK l GENERATING STATION AND PEACH BOTTOM ATOMIC POWER STATION

Dear Mr.' Rainey:

in a telephone conversation on January 15,1999 between Messrs. J. Williams and )

P. Orphanos, arrangements were made for the administration of licensing examinations at

{ Limerick Generating Station and Peach Bottom' Atomic Power Station during the week of -

' July 5,1999.

[As agreed during the telephone conversation, your. staff will prepare the examinations L based on the guidelines in Interim Revision 8, of NUREG-1021," Operator Licensing .

Examination Standards for Power Reactors." The NRC regional office will discuss with

.your staff any changes that might be necessary before the examinations are administered.

. To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by May 12,1999.' The written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by June 4,1999, i Any delay in receiving the required e'xamination and reference materials, or the submittal of L inadequate or incomplete materials, may cause the examinations to be rescheduled.

'In ord'er to conduct the requested written examination and operating tests, it will be

~

necessary for your staff to provide adequate space and accommodations in accordance t with ES-402, and to make the simulation facility available on the dates notes above, in
accordance with ES-302, your staff should retain the original simulator performance data (e.g.,~ system pressures, temperatures, and levels) generated during the dynamic operating f tests'until the examination results are final, j Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that wik be

~

Lin effect while the written examinations and operating tests are being administered.

i

! To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval Enumber 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090)at
least 30 days before the first examination date. If the applications are not received at least .

rl s .

, i-

.9902100044 990122

~

i' i

PDR ADOCK 05000171 -

, i V _. _

~PDR,  ! /.  :

' c

+a.,-. , ,,e-,r m- +,-

. _ _ m . _ _ _ __. _ _. _ _ _ . . ._ _ . .. _ ._ _

)\

G. Rainey 2 30 days.before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101,which expires on April 30,2000.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and

maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at BJS1@NRC. GOV;and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202,(3150-0101), Office of Management and

^

Budget, Washington, DC 20503.

The NRC may no't conduct or sponsor, and a person is not required to respond to, a l collection of information unless it displays a currantly valid OMB control number.

l Thank you for your cooperation in this matter. Mr. Orphanos has been advised of the i policies and guidelines referanced in this letter, if you have any questions regarding the

. NRC's examination procedures and guidelines, please contact Mr. Julian Williams at .

'(610) 337-5124, or me at (610) 337-5183. l l

- Sincerely, ORIGINAL' SIGNED BY:

1 o i' Richard J. Conte, Chief Human Performance and Emergency Preparedness Branch Division of Reactor Safety Docket Nos. 50-352;50-353 cc:

J. J. Hagan, Vice President, Nuclear Station Support G. Edwards,' Chairman, Nuclear Review Board and Director - Licensing J. von Suskil, Vice President - Limerick Generating Station M. P. Gallagher, Plant Manager, Limerick Generating Station T. Moore, Manager, Experience Assessment -

Secretary, Nuclear Committee of the Board Commonwealth of Pennsylvania P. Orphanos, Training Manager, Limerick i

b l', - - ~ ,

7, .

[. . .

~ G. Rainey. 3

- Distribution: '

. Region i Docket Room (with concurrences)

H. Miller, RA/J. Wiggins, DRA

. W. Lanning, DRS.

4 - W. Ruland, DRS L

~'C. Anderson, DRP.'

D. Florek, DRP R.- Junod,lDRP ' ~

NRC Resid,ent inspector .j

, Nuclear Safety Infonnation Center (NSIC)  :

PUBLIC )

J. Williams, Examiner, DRS R. Conte,' DRS '

V. Curley, DRS (OL Facility File)

DRS File -

' G. Shear, OEDO l

' R. Capra, PDI-2, NRR

.B. Buckley, PD 1-2, NRR  ;

M. Thadani, PD .1-2, NRR l R. Correia, NRR '

M. Campion, ORA g < DOCDESK-

' Inspection Program Branch, NRR (IPAS) l

./

l  :)

I l

s

,A 'i DOCUMENT NAME: G:\HPEPB\ WILLIAMS \LSROEXPB. LIM 73 semelve a espy of ins i:_ ..; .e Indcate in the box: 'C' = Copy without attachment / enclosure "E' = Copy with attachment /enclosu's *N' =

bm " ' '

OFFICE Rl/DRS . ja/l Rl/DRS , / l l l l NAME JWilliams QF RCon g DATEL 01/19/99 01p2]99 01/ /99 01/ /99 01/ /99 OFFICIAL RECORD COPY l