ML20248A411
| ML20248A411 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/25/1989 |
| From: | Kane W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Corbin McNeil PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20248A415 | List: |
| References | |
| NUDOCS 8910020209 | |
| Download: ML20248A411 (2) | |
See also: IR 05000277/1989020
Text
.. .
- ,
"
1!. <
g. -- .
&jh *
,m
a
,
.a.q.
y
'
.
.
,
x
p^
'
U-
-
p
1
.
p
25 SEP 1989
Docket Nos.L50-277/DPR-44
50-278/DPR-56
.
Philadelphia Electric Company
'
Correspondence Control Desk
E
? ATTN: :Mr. C.
A.' McNeill-
c.
.
Executive Vice President-Nuclear
'
.
P. 0. Box 7520'
'
'
Philadelphia,. Pennsylvania -19101__
Gentlemen:
Subject: Combined Inspection 50-277/89-20; 50-278/89-20
'
.This 1stter transmits the findings of a special restart team safety inspection
by Mr.:T. P-.~' Johnson'and others on July 30 to September 2, 1989, at the Peach
L
.
Bottom Atomic. Power Station, Delta, Pennsylvania. These findings were based on
l observation.of activities',: interviews, measurements and document reviews, and.
have been discussed with Mr. J. F. Franz of your~ staff.
' The NRC concluded around-the-clock coverage of Unit 2 startup activities.
' Licensed operator performance remained effective. Management _ continues to be
~
s
' aggressive in problem resolution and involved in assuring' nuclear safety.
,,
A copy of this letter and the enclosures are being placed.in the NRC Public
' Document Room.
Within theLscope of this inspection,- no NRC identified violat'ons were nbserved.
i
No reply to this letter is required.
Your cooperation with us is ' appreciated.
Sincerely,
Original Signed By-
James C. Linville
William F. Kane, Director,
Division of Reactor Projects
.
Enclosure:
.NRC Region I Combined Inspection Report No. 50-277/89-20 and 50-278/89-20
,
0FFICIAL RECORD COPY
CIR PB 89-20 - 0001.0.0
09/21/89
gjoO20209epO925
O
I
a
RDOCK 05000277
/
/
90h
. ..
. ..
.
.
__- -
i,-
eQg;; ; _.
"
.,
,.
..
.,
~ Philadelphia Electric Company-
2
25 SEP 1988
cc w/ enc 1:
. John S. Kemper, Sr. , Senior Vice President-Nuclear
Jack Urban, General Manager,l Fuels Department, Delmarva Power
'D. M. Smith, Vice President, Peach Bottom Atomic Power Station -
D. Helwig, General Manager, Nuclear Services
'E. C. Kistner,-Chairman, Nuclear Review Board
W.. H. Hirst,. Director, Joint. Generation Projects Department', Atlantic
Electric-
-B. W. Gorman, Manager-Externa 1' Affairs,.Public~ Service Electric & Gas
Company-
.J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station
Troy B. Conner, Jr. , Esquire (Without. Report)
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette',' Power Pla'nt Siting, Nuclear Evaluations
G. A. Hunger, Jr., Director, Licensing Section
Doris Poulsen, Secretary of Harford County Council
Public Document Room (PDR)
Local-Public Document-Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
'bec w/ enc 1:
-Region I: Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
J. C. Linville Branch Chief,-DRP
PA0 (2) SALP Reports Only + All Inspection Reports
Robert J. Bores, DRSS
SRI, Limerick I-
Karl Abraham, Public Affairs Officer (2)
R. E. Martin, Project. Engineer, NRR -
l
/
/
RI
DR '
D
ll
J nson/rh1
0 rflein
nville
the
9/gI/89
9/ f 89
9/2,5/89
9/ 2/89
7
7
OFFICIAL RECORD COPY
CIR PB 89-20 - 0002.0.0
'-
09/21/89
- - ___ - - _ __-____ ______-_ _-_ - _ _ - _ _ = - --- -
_ _ _ _ .