ML20211P296
| ML20211P296 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/07/1999 |
| From: | Conte R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Armstrong J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 9909130179 | |
| Download: ML20211P296 (2) | |
Text
--
e o
September 7, 1999 Mr. James M. Armstrong Director - Training PECO Energy Company Peach Bottom Atomic Power Station 1848 Lay Road Delta, Pennsylvania 17314
Dear Mr. Armstrong:
You are authorized to administer the NRC approved initial written examinations to the applicants listed below on September 13,1999. NRC Region I operator licensing staff will administer the operating tests September 14-16,1999.
APPLICANT DOCKET NO.
EXAMINATION TYPE Gary L. Johnson 55-62190 RO Kevin M. Sprague 55-62194 RO Alan L. Raush 55-62249 SROI Joseph P. Waldman 55-62273 SROI Theodore V. Wingfield, ll 55-62148 SROI Facility and Location: Peach Bottom Atomic Power Station, Delta, PA Facility
Contact:
R. Birley 717-456-4851 Chief Examiner J. Williams 610-337-5124 Written Examinations Prepared by:
Facility Date of Written Examination by Licensee:
September 13,1999 Dates of Operating Tests September 14-16,1999 Sincerely, Original signed by Richard J. Conte, Chief Operator Licensing and Human Performance Branch
)
Division of Reactor Safety
/
Docket Nos. 50-277/278
/
D DOC O 00 277 U-V PDR
,e A
rr
~
2 Mr. James Armstrong cc:
D.' Trimble, Chief,'HOHB, NRR J. Williams, NRC Examiner S. Dennis, NRC Examiner C. Sisco, NRC Examiner 1
- Resident inspector Project Manager -
PUBLIC bcc:
OL Facility File f
DOCUMENT NAME: P:%SGNPB.wpd Ta receive a copy of this document, indicate in the box: "C" = Co >y without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy 0FFICE RI/DRS l
RI/DRS RI/DRS
/
l NAME Curley (v
WilliamsIdk Conte /F DATE 08/25799 0,8/3 /99" M/#3/99 J'
0FFICIA[fRECORDCOPY
'