ML20195K225
| ML20195K225 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/11/1999 |
| From: | Cowgill C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Rainey G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20195K230 | List: |
| References | |
| 50-277-99-04, 50-277-99-4, 50-278-99-04, 50-278-99-4, NUDOCS 9906220032 | |
| Download: ML20195K225 (3) | |
See also: IR 05000277/1999004
Text
p
g
.
j'd
J
o
June 11,1999
Mr. G. Rainey, President
PECO Nuclear
Nuclear Group Headquarters
Correspondence Control Desk
P.O. Box 195
Wayne, Pennsylvania 19087-0195
SUBJECT:
NRC INSPECTION REPORT 50-277/99-04,50-278/99-04
Dear Mr. Rainey:
On May 17,1999, the NRC completed an inspection at the Peach Bottom Atomic Power Station.
The enclosed report presents the results of that inspection. We concluded that your staff
continued to operate both units safely.
Based on the results of this inspection, the NRC has determined that one Severity Level IV
violation of NRC requirements occurred. This violation is being treated as a Non-Cited Violation
(NCV), consistent with Appendix C of the NRC Enforcement Policy. Tnis NCV is described in
the subject inspection report. The NCV involved the inadvertent disabling of a Unit 3 vital area
door. . lf you contest this violation or the severity level of the NCV, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial, to the
Nuclear Regulatory Commission , ATTN: Document Control Desk, Washington DC 20555-0001
with copies to the Regional Admin'strator, Region I, the Director, Office of Enforcement, United
i
States Nuclear Regulatory Commission, Washington DC 20555-0001 and the NRC Resident
inspector at the Peach Bottom Atomic Power Station.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
fI
enclosures will be placed in the NRC Public Document Room (PDR).
We appreciate your cooperation.
Sincerely,
Original Signed by:
Curtis J. Cowgill, Chief
Projects Branch 4
Division of Reactor Projects
Docket Nos.: 50-277, 50-278
License Nos.: DPR44, DPR-56
Enclosure: NRC Inspection Report No. 50-277/99-04,50-278/99-04
jf*p1
-
'
990622o032 9906it
ADOCK 05000277
,
G
.
g
'4
. G. Rainey
2
.,.
cc w/encia:
J. Hagan, Senior Vice President, Nuclear Operations
J. Doering, Vice President, Peach Bottom Atomic Power Qation
M. Ws.rner, Plant Manager, Peach Bottom Atomic Power Station
G. D. Edwards, Chairman, Nuclear Review Board
R. Boyce, Director, Nuclear Quality Assurance
A. F. Kirby, lil, Extemal Operations - Delmarva Power & Light Co.
A. A. Winter, Manager, Experience Assessment
J. W. Durham, Sr., Senior Vice President ar.d General Counsel
H. C. Kresge, Manager, Extemal Operations, Connectiv
N. J. Sproul, Manager, Financial Control & Co-owner Affairs, Connectiv
R. McLean, Power Plant Siting, Nuclear Evaluations
D. Levin, Acting Secretary of Harford County Council
R. Ochs, Maiyland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance
Mr. & Mrs. Kip Adams
Commonwealth of Pennsylvania
State of Maryland
TMl- Alert (TMIA)
i
!
..
G. Rainey
3
,.
.
Distribution w/encis:
Region i Docket Room (with concurrences)
Nuclear Safety Information Center (NSIC)-
NRC Resident inspector
PUBLIC
H. Miller, RA/J. Wegins, DRA (1)
C. Cowgill, DRP
D. Florek, DRP
D. Cullison, DRP
C. O'Daniell, DRP
Distribution w/encis: (Via E-Mail)
M. Tschiltz, OEDO
E. Adensam, PDl-2, NRR
M. Thadani, NRR
B. Buckley, NRR
R. Correia, NRR
inspection Program Branch, NRR (IPAS)
DOCDESK
,
DOCUMENTNAME: G:\\ BRANCH 4\\PB\\ir9904b.wpd
t.
.
.,w. - i,
i.,
w:v.c
a.,o.,,v. e v.c
. - ,.v.=om
OFFICE
Rl/DRP
l
Rl/DRP //D
/
l
l
l
NAME
AMcMurtray
CCowgilf L
DATE
06/11/99
06/ll/99
06/ /99
06/ /99
06/ /99
OFFICIAL RECORD COPY
1
s
.