Responds to Re Changes to PBAPS Physical Security Plan,Safeguards Contingency Plan & Guard Training & Qualification Plan Identified as Revs 13,11 & 9, Respectively.No NRC Approval Is Required,Per 10CFR50.54(p)
ML20211Q449
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 08/25/1999
From: Jason White
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9909150070
Download: ML20211Q449 (3)


Text

n I

1 1

August 25, 1999 Mr. G. Rainey, President PECO Nuclear Peach Bottom Atomic Power Station Nuclear Group Hc adquarters Correspondence Control Desk P. O. Box 195 Wayne, Pennsylvania 19087-0195

SUBJECT:

10 CFR 50.54(p) SUBMITTAL FOR PEACH BOTTOM ATOMIC POWER STATION

Dear Mr. Rainey:

This letter is in response to your correspondence of March 17,1999, regarding changes to the ,

Peach Bottom Atomic Power Station Physical Security Plan, Safeguards Contingency Plan, and Guard Training and Qualification Plan identified as Revisions 13,11, and 9, respectively, submitted under the provisions of 10 CFR 50.54(p).

Based on your determination that the changes do not decrease the overall effectiveness of your security plan and after limited review of the changes, no NRC approval is required, in accordance with 50.54(p). Implementation of these changes will be subject to inspection to confirm that the changes have not decreased the overall effectiveness of your security plan.

The enclosures to your letter contained Safeguards information of a type specified in 10 CFR 73.21 and will be withheld from public disclosure.

4 In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter will be placed in the NRC Public Document Room.

Mr. Gregory Smith was the reviewer for this matter. Should there be any questions, he en be contacted at (610) 337-5263.

Sincerely, ORIGINAL SIGNED BY:

I John R. White, Chief D Radiation Safety and Safeguards Branch Division of Reactor Safety Docket Nos. 50-277,50-278

.cAGO9 9909150070 990825 PDR ADOCK 05000277 F PDR o

s

~

, Mr. G. Rainey

'ec:

J. Hagan, Vice President, Nuclear Station Support i J. Doering, Vice President, Peach Bottom Atomic Power Station J M. Warner, Plant Manager, Peach Bottom Atomic Power Station J. A. Hutton, Director, Licensing, PECO Nuclear l

G. D. Edwards, Chairman, Nuclear Review Board J R. Boyce, Director, Nuclear Quality Assurance A. F. Kirby, Ill, Extemal Operations - Delmarva Power & Light Co.

A. A. Winter, Manager, Experience Assessment J. W. Durham, Sr., Senior Vice President and General Counsel H. C. Kresge, Manager, External Operations, Connectiv .

N. J. Sproul, Manager, Financial Control & Co-Owner Affairs, Connectiv R. McLean, Power Plant Siting, Nuclear Evaluations '

D. Levin, Acting Secretary of Harford County Council R. Ochs, Maryland Safe Energy Coalition J. H. Walter, Chief Engineer, Public Service Commission of Maryland Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance Mr. & Mrs. Kip Adams Commonwealth of Pennsylvania l

State of Maryland i TMI- Alert (TMIA).

6 l

=

i

4

, Mr. G. Rainey -3

' DISTRIBUTION:

R. Rosano, NRR/PSGB (OWFN 12 E11)

Document Control Desk, Official Record Copy - RlD RG01 Region 1 Docket Room w/ concurrence (w/o SGI)

Region i Safeguards Licensing File (TACS UO1345, UO1346, UO1347)

Region i Safeguards Licensing Serial File C. Cowgill, Chief, RPB 4, Rl/DRP (w/o SGI)

' NRC Resident inspector PUBLIC Nuclear Safety information Center (NSIC)

I 4

l l

l DOCUMENT NAME: S:\SRVCELST\PBSP13CP11TQ9.WPD T3 receive a copy of Uns document, im icato le th@tox: "C" = Co y without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy I OFFICE DRS/RI (h DRS/RI l l l l NAME CMiskey(h\R\

h@ JWhite DATE 08/25/99 OBdW99 08/ /99 08/ /99 08/ /99

~

a OFFICIAL RECORD COPY l

l