ML20212H617

From kanterella
Jump to navigation Jump to search
Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier
ML20212H617
Person / Time
Site: Peach Bottom 
Issue date: 09/24/1999
From: Hutton J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212H620 List:
References
NUDOCS 9910010267
Download: ML20212H617 (1)


Text

s i

l e,

1.

A TS 5.6.5.d v

,PECO NUCLEAR escocoerov - + "<

e 965 Chesterbrook Boulevard 1'

A Unit of PECO Energy

' Wayne. PA 19 % 7 5691 September 24,1999 Docket No. 50-277 License No. DPR-44 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington DC 20555

]

Subject:

Peach Bottom Atomic Power Station, Unit 2 lssuance of the Core Operating Limits Report for Reload 12, Cycle 13, Revision 2

Dear Sir / Madam:

i Enclosed is a copy of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 2, Reload 12, Cycle 13 (Revision 2). Revision 2 of this report incorporates a revised Single Loop Operation MAPLHGR flow multiplier.

This COLR is being submitted to the NRC in accordance with PBAPS, Unit 2 Technical Specifications (TS) Section 5.6.5.d.

If you have any questions, please do not hesitate to contact uc.

Ve rs, ames A. Hutton Director - Licensing Enclosure cc:

H. J. Miller, Administrator, Region l', USNRC (w/ Enclosure)

A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ Enclosure) l l

0I 0

9910010267 990924 PDR' ADOCA 05000277

'P PDR L

i J