ML20245J082

From kanterella
Jump to navigation Jump to search
Modifies Requirements Set Forth in 870331 Order,Section V.A to Permit Operation of Unit 2 Not to Exceed 35% Full Power
ML20245J082
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/26/1989
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8905030629
Download: ML20245J082 (4)


Text

__ _

., - j l

l i

26 APR 1989 Docket Nos. 50-277 50-278 l

Philadelphia Electric Company I ATTN: Mr. Corbin A. McNeill Executive Vice President-Nuclear Correspondence Control Desk ,

P. O. Box 7520  !

Philadelphia, Pennsylvania 19101 Gentlemen:

SUBJECT:

MODIFICATION OF REQUIREMENTS OF ORDER RE: PEACH BOTTOM ATOMIC POWER STATION, UNIT NOS. 2 AND 3 i

On March 31, 1987, the Executive Director for Operations issued an Order '

directing the Philadelphia Electric Company to shut down Peach Bottom Atomic Power Station and take certain corrective actions to address concerns including failure of both the line organization and the quality assurance program to identify conditions adverse to safety. Specifically, Sections V.A-V.C of the Order respectively required (a) that Unit 3 be shutdown and both units be maintained in a cold shutdown condition pending further order; (b) a description of the actions planned to provide assurance that the facility will comply with all requirements while in a cold condition; and (c) that before proposing l operation of either unit, a comprehensive plan be developed to assure that the facility will be operated safely and comply with all requirements. The actions outlined in your letter of April 6,1987, were evaluated as part of our inspection program and determined to fulfill the requirements of Sections V.A and V.B of the Order.

In y letter dated October 19, 1988, the NRC acccpted your proposed " Plan for Restart of Peach Bottom Atomic Power Station" in response to the requirements set forth in Section V.C of the Order. We have conducted an assessment of your implementation of this plan during an Integrated Assessment Team Inspection in February 1989, and have concluded that your performance relative to the Peach Bottom facility is at a level sufficient to support safe startup and operation of the facility and that there are no fundamental flaws that would inhibit your ability to ensure reactor or public safety during plant operatior. ,.

However, before final release from the requirements of the Order, you must '

demonstrate the effectiveness of your corrective actions in an operating environment in accordance with your approved restart power testing plan, [

j Therefore, in accordance with Section V.E of the Order, I hereby modify the requirements set forth in Section V.A of the Order to permit operation of Unit 2 not to exceed 35 percent of full power.

$[UANN b 77 c

P

((7- Ol ,

Ph'iladelphia Electric Company 26 APR 1989 No reply to this letter is necessary. Thank you for your cooperation in this matter.

i Sincerely, ,

W. T. Russell Regional Administrator cc w/ enc 1:

John S. Kemper, Sr., Senior Vice President-Nuclear J. W. Gallagher, Vice President, Nuclear Services E. C. Kistner, Chairman, Nuclear Review Board Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station -1 Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station Troy B. Conner, Jr. , Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Bryan W. Gorman, Manager, External Affairs Eugene J. Bradley, Esquire, Assistant General Cocnsel Raymond L. :lovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Director, Licensing Section Doris Poulsen, Secretary of Harford County Council Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania bec:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl) D Section Chief, DRP PA0 (23) SALP and (2) Inspection Reports ,

Robert J. Bores, DRSS ,,M [ '

R. Martin, NRR B. Clayton, EDO 8g: di k i

.o W Q

RI:DRP RI:DRP RI:DRP RI:DRP NRR:DONRR RI:DRA 4 W S (k RI:RA

  • Gadzala/rbl
  • Linville *Wenzinger* Kane
  • Murley
  • Allan Russell 3/ /89 3/ /89 3/ /89 3/ /89 3/ /89 3/ /48 /$/89 g ,2p f^

i OFFICIAL RECORD COPY COMPLETION REQUIREMENT PB - 0002.0.0-  !

  • See previous concurrences i

J -

l No reply to this letter is necessary. Thank you for your cooperation in this matter.

Sincerely, q

4. T. Russell s'egional Administrator cc: ~

John S. Kemper,-Sr., Senior Vice Presiient-Nuclear j J. W. Gallagher, Vice President, Nuclei.r Services  :

E. C. Kistner, Chairman, Nuclear Revi tw Board '!

Dickinson M. Smith, Vice President, Paach Bottom Atomic Power Station . i Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co. )

John F. Franz, Plant Manager, Peach Bottom Atomic Power Station Troy B. Conner, Jr. , Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric Bryan W. Gorman, Manager, External Affairs Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations George A. Hunger, Director-Licensing Doris Poulsen, Secretary of Harford County. Council PublicDocumentRoom(PDR) ]

LocalPublicDocumentRoom(LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector Commonwealth of Pennsylvania 1

l

[RESTARTLETTER]

RI:DRP .RI:DRP RI:DRP RI:DRP NRR/00 RI:DRA RI:RA Gadzala/rh1 Linville Wenzinger Kane TMurle Allan . Russell

/ /89 / /89 / /89 / /89 4 /j,o / / /89 / /89 L

3

. Philadelphia Electric Company No reply to this letter is necessary. Thank you for your cooperation in this j matter. 1 Sincerely, j W. T. Russell Regional Administrator cc w/ enc 1:

John S. Kemper, Sr., Senior Vice President-Nuclear J. W. Callagher, Vice President, Nuclear Services E. C. Kistner, Chairman, Nuclear Review Board Dickinson M. Smith, Vice President, Peach Bottom Atomic Power Station Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co.

l John F. Franz, Plant Manager, Peach Bottom Atomic Power Station l Troy B. Conner, Jr. , Esquire j 1

W. H. Hirst, Director, Joint Generation Projects Department, l

Atlantic Electric Bryan W. Gorman, Manager, External Affairs Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations W. M. Alden, Director, Licensing Section Doris Poulson, Secretary of Harford County Council j Public Document Room (PDR) J Local Public Docurc,ent Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector i Commonwealth of Pennsylvania j bcc: I Region ! Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1) l Section Chief, DRP l PA0 (23) SALP and (2) Inspection Reports ,

i l Robert J. Bores, DRSS R. Martin, NRR B. Clayton, EDO

/ 1 -

f/ f 1 R P Gadzala/rbl RI: DRP R.

Linville Wenzinger i Le P

@ lI A RI-oA

'an R. , ell A Y v e e 3/>#/89 ,3f /89 //[t/89 3/J4/89 A/j0/89 4/ /89 0FFICIAL RECORD COPY COMPLETION REQUIREMENT PB - 0002.0.0 03/17/89 L____-__-___________________ . _ _ _ _