Forwards Safety Insp Repts 50-277/89-21 & 50-278/89-21 on 890901.No Violations Noted.Insp Concluded That Improvements in Radiological Controls Program Have Been Slow.Addl Mgt Attention to Program Warranted
ML20248G229
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/29/1989
From: Ronald Bellamy
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20248G232 List:
References
NUDOCS 8910100143
Download: ML20248G229 (2)


See also: IR 05000277/1989021

Text

m

x-

3

-

-

,

s.

,

,

Ui?

8

'!

a

'v.

',

,

4,

M

..'~

s

3 ,

)

.g;

  • i

'

-

'

]

<

,

,

<

f

. SEP 2 9 1989/

'

l

p

n

.

.

'

1

L

. Docket Nos. .50-277:

50-278

'

philadelphia-Electric Companyt

l

L

ATTN: Mr. C. A. McNeill

m

Executive Vice President-Nuclear'

. Correspondence, Control; Desk '

.

-P. 0. Box 7520;

L;

Philadelphia, Pennsylvania. 19101. '

Gentlemen:

,

,

' Subject: Combined Inspection. Report Nos. 50-277/89-21 and.50-278/89-211

A' routine' radiation.' safety inspection was conducted on August'28 to

September 1,:1989 by Messrs. T. Dragoun and W. Thomas of this office. Areas-

.

reviewed-included use' of, radiation. caution signs, organization and. staffing,

radiation work permits, use of abandoned radwaste rooms, and audits-and

appra i sal s'. . Radiological controls observations made by Mr. William T. Russell,

Regional Administrator, during a' plant. tour on August 31, 1989 are also

includedLin this report.

Based on,the results of this inspection, we have concluded that improvements in

s

the. radiological controls-programs have been slow. Some initiatives noted in

previous:inspe'ctions:that' served to strengthen your_ program were not being

'

' implemented at.the time of this inspection. Additional management attention to

these programs:is warranted. Your cooperation with us is appreciated.

Sincerely,

0:1@ai as.mi Dy;

P:.cald R. Ddbmy

Ronald R. Bellamy, Chief

Facilities Radiological Safety

and Safeguards Branch

Division of RadiationLSafety

and Safeguards

-Enclosure:

Inspection Reports 50-277/89-21 and 50-278/89-21

s

0FFICIAL RECORD COPY

CIR PB 89-21 - 0001.0.0

=

09/29/89

[

T I

89i0100143 890929

{j

,

PDR

ADOCK 05000277

,

'Q.

FDC

_ _ - _ _ - - _ _ _ _ - _ _ _ _ - - _ - _ _ _ _ _ _ _ _ -

-

_

_ _ - _ - _ .

.

- _ .

.

[,l .

'

' . .

,

Ph11'adelphia-Electfic Company.

2

SEP 2 9 1999_

~

occ w/ encl:

John S. Kemper, Sr., Senior Vicel President-Nuclear

<J. W.'Gallagher, Vice President, Nuclear Services

.E. C. Kistner, Chairman', Nuclear , Review Board

i

Dickinson M. Smith,' Vice President, Peach Bottom Atomic Power Station

,

Jack Urban, General Manager, Fuels Department, Delmarva Power & Light Co'.

John F. Franz,' Plant Manager, Peach Bottom Atomic Power Station-

Troy B. Conner, Jr. , Esquire

iW. H. Hirst, Director, Joint Generation Projects Department,

Atlantic Electric

Bryan W. -Gorman, . Manager, External Affairs

Eugene'J.-Bradley, Esquire, Assistant General Counsel (Without Report)-

Raymond L. Hovis, Esquire

Thomas Magette', Power Plant Siting, Nuclear Evaluat; ions

'G. A. Hunger, Director, Licensing Section

Doris Poulsen, Secretary of Harford County Council

Public Document Room (PDR).

Local Public' Document Room:(LPDR)

Nuclear Safety Information: Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/ enc 1:

Region I. Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

.Section Chief, DRP

PA0.(23)<SALP and (2) Inspection Reports

R. Martin, NRR

M. Johnson, EDO-

.

J. Dyer, EDO-

'

M

RI:DRSS

RI:DRSS

.

1SS

RI:DRSS

Dragoun/mk

T.

'Pa c lak

Bellamy

09/20/89

/ /89

%/89

09/d/89

0FFICIAL RECORD COPY

CIR PB 89-21 - 0002.0.0

09/21/89

w__-__

_ _ _ _ _ -

_ _ _ _ _ - _

._-_-_- _- _