Text
f.
t
1;
.
4
March 25,1999
i
Mr. G. Raic9y, President
PECO Nuclear
Nuclear Group Headquarters
Correspondence Control Desk
P.O. Box 195
Wayne, Pennsylvania 19087-0195
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-277/99-01,50-278/99-01
Dear Mr. Rainey:
On February 15,1999, the NRC completed an inspection at the Peach Bottom Atomic Power
Station. The enclosed report presents the results of that inspection. Your staff continued to
operate both units safely. Based on inspection conducted during this period, the NRC
concluded that your staff maintained effective radioactive effluents controls and an effective
security program.
During this inspection, the NRC reviewed the corrective action process and concluded that the
Peach Bottom staff was offective in identifying and correcting problems at the station. In
- !
particular, the station was effective in using the Performance Enhancement Program (PEP).
However, the NRC observed inconsistencies in some departmental corrective action programs.
For example, there were differences in the way various maintenance work groups hand lcd some
identified problems. We noted that your staff was aware of these inconsistencies and has
initiated actions to resolve them.
Based on the results of this inspection, the NRC has determined that a violation of NRC
'
requirements occurred. This violation is being treated as a Non-Cited Violation (NCV),
consistent with Appendix C of the NRC Enforcement Policy. The NCV is described in the
j
subject inspection report. If you contest the violation or severity level of the NCV, you should
provide a response within 30 days of the date of this inspection report, with the basis for your
denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk. Washington,
DC 20555-0001, with copies to the Regional Administrator, Region I, and the Director, Of%e of
Enforcement, United States Nuclear Regulatory Comrnission, Washington, DC 20555-0001.
I
\\
\\
0
0
277
G
3
-
t
t
l
G. Rainey
2.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
i
j
enclosures will be placed in the NRC Public Document Room (PDR).
We appreciate your cooperation.
Sincerely,
Original Signed By:
Curtis J. Cowgill, Chief
Projects Branch 4
Division of Reactor Projects
Docket Nos.: 50-277,50-278,
i
Enclosure: NRC Inspection Report No. 50-277/99-01,50-278/99-01
cc w/encls:
J. Hagan, Senior Vice President, Nuclear Operations
J. Doering, Vice President, Peach Bottom Atomic Power Station
M. Warner, Plant Manager, Peach Bottom Atomic Power Station
G. D. Edwards, Chairman, Nuclear Review Board
R. Boyce, Director, Nuclear Quality Assurance
A. F. Kirby, Ill, External Operations - Delmarva Power & Light Co.
A. A. Winter, Manager, Experience Assessment
J. W. Durham, Sr., Senior Vice President and General Counsel
H. C. Kresge, Manager, External Operations, Connectiv
N. J. Sproul, Manager, Financial Control & Co-owner Affairs, Connectiv
R. McLean, Power Plant Siting, Nuclear Evaluations
D. Levin, Acting Secretary of Harford County Council
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance
Mr. & Mrs. Kip Adams
Commonwealth of Pennsylvania
State of Maryland
TMI- Alert (TMIA)
i
I
1
1
G. Rainey
3
Distribution w/encls:
Region I Docket Room (with concurrences)'
Nuclear Safety Information Center (NSIC)
NRC Resident inspector
PUBLIC
H. Miller, RA/J. Wiggins, DRA
C. Cowgill, DRP
D. Florek, DRP
C. O'Daniell, DRP
Distribution w/encls: (Via E-Mail)
M. Tschiltz, OEDO
E. Adensam, NRR
M. Thadani, NRR
q
B. Buckley, NRR
R. Correia, NRR
inspection Program Branch, NRR (IPAS)
DOCDESK
l
i
DOCUMENT NAME: G:\\ BRANCH 4\\PB\\9901-DJF.WPD
Ta receive a copy of this document, indicate in the box: *C" = Copy without attachment / enclosure
"E" = Copy with attachment / enclosure
"N" = No copy
OFFICE
Rl/DRP
Rl/DRP//s
l
/
l
NAME
DFlorek
CCowgif
DATE
03/25/99
03/fJ99
03/ /99
03/ /99
03/ /99
OFFICIAL RECORD COPY