ML20062B821
| ML20062B821 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/11/1990 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20062B823 | List: |
| References | |
| NUDOCS 9010260157 | |
| Download: ML20062B821 (7) | |
See also: IR 05000277/1989099
Text
--
-_
--
-
.
-
-
-
.
,
-
,
% .
,-
'
OCT101990-
!
Docket Nos.
50-277
50-278
!
- i
Philadelphia Electric Company
'
ATTN: Mr. Dickinson M. Smith
-
Senior Vice President-Nuclear
P. O. Box 195
l
Wayne, PA 19087-0195
i
Gentlemen:
Subject:
Systematic Assessment of Licensee Performance (SALP) Final' Report
I
Number 50-277/89-99; 50-278/89-99
5
This letter forwards the final Peach Bottom Atomic Power Station' S LP Report (Enclosure 1)-
for the period July 1,1989, through May 31,1990. The initial SALP Report was forwarded to'
you by our August 10,1990 letter (Enclosure 2) and was discussed with Messrs. J.'Paquette,-
C. A. McNeill, yourself and members of your staff at a meeting on August 29,1990,: at your.
,
Conference Center in Delta, Pennsylvania.
'
'
Based upon the discussions at that meeting and your written response dated September 18,11990
(Enclosure 3), we concluded that a clarification to the initial SALP Reporf was warracted. We_
t
acknowledge that the root cause determination for radiation worker noncompliance with work
requirements was completed during the SALP period. The Licensee Recommendation hithe
'
Radiological Controls area in the final SALP Report was revised to reflect this as indicated in
the enclosed revision sheet (Enclosure 4).-
>
Our overall assessment indicated effective management oversight and involvement resulting in
continued improvement in performance in several functional areas. A' solid foundation of self-
assessment programs and a management philosophy of safety-conscious operations have been
established.'
'
As discussed at the SALP management meeting, and as described in your SALP written response
we acknowledge your efforts and plans to improve.the identified weaknesses'noted in our-
assessment.
,
w
eCC018
TEf0
gnaa8a5 8868S;7
3)
,
.
o
..
.
.
-
..
.
-
.
. _, . - ..
.
.
,
.
..
.
Philadelphia Electric Company
2
No reply to this letter is required.' Your actions in response to the NRC Systematic Assessment
,
of Licensee Performance will be reviewed during future inspections of your facility.
,
We appreciate your cooperation.
1
Sincerely,
Or!dn:I Sign 5d By:
Thoms T. Ihlin
!
<
Thomas T. Martin-
. Regional Administrator '
l-
l
Enclosures:
1.
Systematic Assessment of Licensee Performance Report No. 50-277/89-99; 50-278/89-99
2.
NRC Region I letter, T. Martin to D. Smith, dated August 10,1990
l
3.
PECO letter, D. Smith to NRC, dated September 18, 1990
4.
Initial SALP Report revision sheet
1
I
,
~ i
!
!
e
w
.
$
._
"
r
- .
4
.
.-
.
Philadelphia Electric Company
3
,
cc w/ encl:
C.A. McNeill,' President and Chief Operating Officer
D.B. Miller, Vice President, Peach Bottom Atomic Power Station
D.R. Helwig, Vice President, Nuclear Engineering and Services
!
J.F. Franz, Plant Manager, Peach Bottom Atomic Power Station
E.J. Cullen, Jr., Assistant General Counsel
G.A. Hunger, Jr., Director, Licensing Section
E.P. Fogarty, Project Manager, Peach Bottom Atomic Power Station
R.J. lees, Chairman, Nuclear Review Board
A.A. Fulvio, Regulatory Engineer, Peach Bottom Atomic Power Station
J. Urban, General Manager, Fuels Department, Delmarva Power
t
W.H. Hirst, Director, Joint Generation Projects Dept, Atlantic Electric
B.W. Gorman, Manager-External Affairs, Public Service Electric & Gas Co.,
T.B. Conner, Jr., Esquire (Without Report)
R.L. Hovis, Esquire (Without Report)
R. McLean, Power Plant Siting, Nuclear Evaluations.
J.H. Walter, Chief Engineer, Public Service of Maryland
D. Poulson, Secretary of Harford County Council
Public Document Room (PDR)
local Public Document Room (LPDR)
,
l
Nuclear Safety Information Center (NSIC)
l
NRC Resident Inspector
Commonwealth of Pennsylvania
K. Abraham, PAO (20)
Chairman Carr
Commissioner Curtiss
l
Commissioner Rogers
Commissioner Remick
a
i
i
,
._.
,
'
,
8
o
.
Philadelphia Electric Company
4
bec w/ encl:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)-
J. Taylor, EDO
T. Martin, RA
W. Kane, DRA
C. Hehl, DRP
J. Wiggins, DRP
A. Blough, DRP
L. Doerflein, DRP
J. Lyash, DRP
G. Suh, NRR
J. Caldwell, EDO
W. Hodges, DRS
M. Knapp, DRSS
D. Holody, ORA
J. Lieberman, OE
M. Conner, DRP
l
1
ff0
h
f
^
RI:DRP
hl:DR '
RI:DRP
- DRP
KI;
RpftA.
(n Lyash
Kdne
Mar' tin
Doerflein
Blough
(uHehl
10/lo/90
10/A/90
10/c/90
10/c/90
10//e/90
10/p/90
OFFICIAL RECORD COPY
!
.
--
__ __ _
.__ . _ _ . -
_
_
. -
.
,
t
.
.
'
. J
/* "'%
.k
UNITED STATES
p
NUCLEAR REGULATORY COM'AISSION
j
l.
. . . "
,j
REGION I
U
.
'2
476 ALLENDALE ROAD -
-
ef
KING OF PRUS$1A, PENNSYLVANIA 19406:
,
.....
t
,
Docket Nos.
50-277
00T 11 1990
[
50-278
-fl
Philadelphia Electric Company
A'ITN: Mr. Dickinson M. Smith
.
Senior Vice President Nuclear
1
P. O. Box 195
Wayne, PA 19087-0195
,
l
Gentlemen:
'
i
,
Subject:
Systematic Assessment 'of Licensee Performance (SALP) Final l Report
Number 50-277/89 99; 50-278/89-99
,
This letter forwards the final Peach Bottom Atomic Power Station SALP Report (Enclosure 1)
l
for the period July 1,1989, through May 31,1990. The initial SALP Report was forwarded to ? ,
l
you by our August 10,1990 letter (Enclosure 2) and was discussed with Messrs. J. Paquette,-
-)
C. A. McNeill, yourself and members of your staff at a meeting on August 29,- 1990,- at your
]
_
Conference Center in Delta, Pennsylvania.
!
Based upon the discussions at that meeting and your written response dated September 18,1990
(Enclosure 3), we concluded that a clarification to the initial SALP Report was warranted. - We -
.
acknowledge that the root.cause determination for radiation worker noncompliance with work
a
requirements was completed during the SALP. period. The Licensec Recommendation'in the
1
Radiological Controls area in the fmal SALP Report was revised to reflect this as indicated in
,
the enclosed revision sheet (Enclosure 4).
1
Our overall assessment indicated effective management oversight and involveme a resulting ".n
continued improvement in performance in several functional areas. A' solid foundation of self-
.j
'
.
,
assessment programs and a management philosophy of safety-consciors operations have been
established.
.
,
!
- i
o
As discussed at the S ALP management meeting, and as described in your SALP written response
.
we acknowledge your efforts and plans to improve the identified weaknesses noted in ourj
d
assessment,
q
q
1
q
.
s-
..s
m
--.
..
..
.
.
-
,
l
.
Philadelphia Electric Company
2
-
No reply to this le'Acr is required. Your actions in response to the NRC Systematic Assessment
of Licensee Perfc.rance will be reviewed during future inspections of your facility.
We appreciate your cooperation
Sincerely,
,
f
Y
Thomas T. Martin
Regional Administrator
Enclosures:
,
1.
Systematic Assessment of Licensee Performance Report No. 50-277/89-99; 50-278/89-99
,
I
2.
NRC Region I letter, T. Martin to D. Smith, dated August 10, 1990-
3.
PECO letter, D. Smith to NRC, dated September 18,1990
4.
Initial SALP Report revision sheet
I
S
-
--
.. _
-
.
._
. - -
_ _ _ - _ _ _ _ _ _ _
L
.
.-
.
.
R
.
Philadelphia Electric Company
3
cc w/ encl:
C.A. McNeill, President and Chief Operating Officer
D.B. Miller, Vice President, Peach Bottom Atomic Power Station
D.R. Helwig, Vice President, Nuclear Engineering and Services
J.F. Franz, Plant Manager, Peach Bottom Atomic Power Station
E.J. Cullen, Jr., Assistant General Counsel
G. A. Hunger, Jr., Director, Licensing Section
E.P. Fogarty, Project Manager, Peach Bottom Atomic Power Station
t
R.J. Lees, Chairman, Nuclear Review Board
A. A. Fulvio, Regulatory Engineer, Peach Bottom Atomic Power Station
J. Urban, General Manager, Fuels Department, Delmarva Power -
W.H. Hirst, Director, Joint Generation Projects Dept, Atlantic Electric
j
B.W. Gorman, Manager-External Affairs, Public Service Electric & Gas Co.,
T.B. Conner, Jr., Esquire (Without Report)
i
R.L. Hovis, Esquire (Without Report)
R. McLean, Power Plant Siting, Nuclear Evaluations
J.H. Walter, Chief Engineer, Public Service of Maryland
D. Poulson, Secretary of Harford County Council
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
K. Abraham, PAO (20)
i
'
Chairman Carr
Commissioner Curtiss
Commissioner Rogers
Commissioner Remick
.
l
l
l
,