-shir v
PECO NUCLEAR ecco ceerov co,enee, 965 Chesterbrook Boulevard "A Unit of PECO Energy wayne. PA 19087-5091 September 24,1999 Docket No. 50278 License No. DPR-56 U. S. Nuclear R ulatory Commission Attn: Document Desk iW.;mgton, D.C. 20555 Subject Peach Bottom Atomic Power Staten, Unit 3 Core Shroud Exammaton Strategy
/
References:
1.
Letter from G. A. Hunger, Jr. (PECO Energy Company (PECO Energy))
to U. S. Nuclear Regulatory Commission (USNRC) dated November 3, 1995 2.
Letter from G. A. Hunger, Jr. (PECO Energy) to USNRC dated January 30,1997 3.
Letter from J. F. Stolz (USNRC) to G. A. Hunger, Jr. (PECO Energy) dated October 27,1997 4.
Letter from G. C. Lainas (USNRC) to C. Terry (BWRVIP Chairman) dated April 27,1998 5.
Letter from G. D. Edwards (PECO Energy) to USNRC, dated March 1, 1999 Dear Sir / Madam in the Reference 5 letter, PECO Energy Company sutmtted a plant specific analysis which provided a technicd basis for re-inspection frequences associated with the core shroud at the Peach Bottom Atomic Power Station (PBAPS), Unit 3. After further evaluaton, PECO Energy has decided to inspect the H-3 and H-4 shroud welds during the upcomog 3R12 outage scheduled to begin late September,1999. In the event that unantdpated dMicultes are exponenced during the outage which would preclude the inspecton of the welds, PECO Energy will request discussions regarding the re-inspecton frequencies of these welds at that time.
If you have any questions, please contact us.