Forwards Insp Repts 50-277/98-09 & 50-278/98-09 & Notice of Violation.Insp Focused on Reactor Core Isolation Cooling & 4kV Electrical Distribution Sys Operation Under Normal & Emergency Operation Conditions
ML20202J808
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/01/1999
From: Lanning W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20202J815 List:
References
50-277-98-09, 50-277-98-9, NUDOCS 9902090250
Download: ML20202J808 (3)


See also: IR 05000277/1998009

Text

. - - - -

.. - .

- - . . - . - -

j,

February 1, 1999

"

a.

I

,

.

4-

~

Mr. G. Rainey, President

'

PECO Nuclear

'

j.

Nuclear Group Headquarters

Correspondence Control Desk

a

P. O. Box 195

l

Wayne, PA' 19087-0195

i

SUBJECT:

NRC ENGINEERING TEAM INSPECTION 50-277/98-09 AND 50-278/98-09

AND NOTICE OF VIOLATION

4

i

j

Dear Mr. Rainey:

j

This letter refers to the engineering team inspection conducted November 16 through

i

December 4,1998, at the Peach Bottom Atomic Power Station. The inspection evaluated the

i

effectiveness of the engineering organization in supporting safe operation of your facility. The

'

inspection focused on the reactor core isolation cooling and 4kV electrical distribution systems'

l

operation under normal and emergency operation conditions. The inspection also addressed

I

the performance of engineering in . support of the operations and maintenance functions, with

l

'

.

emphasis on problem identification and corrective action implementation, and plant safety

evaluations. The enclosed report provides the results of the inspection. The preliminary

-i

<

findings and conclusions were presented to Mr. Doering and others of your staff on

j

>

!

December 11,1998.

!

j.

!

j

The team concluded that PECO provided effective engineering support to the station. In-depth

review of the reactor core isolation cooling (RCIC) and_4Kv electrical distribution systems

i

determined that both systems were operable and capable of performing their design basis

j

functions and that the analyses and procedures supporting these systems were generally

j'

. being identified, root causes determined, corrective actions taken, and results monitored in a

';

accurate. Also, based on several areas reviewed, the team concluded that plant problems are

!

generally effective manner.

!

Based on the results of this inspection, the NRC has determined that a violation of NRC

l

- requirements occurred. The violation is cited in the enclosed Notice of Violation, and the

circumstances surrounding it are described in detail in the subject inspection. The team found

)

two examples in which RCIC system design basis information was not properly translated into

/

procedures.

The NRC has concluded that information regarding the reason for the violation, the corrective

fqol :

100053

'

actions taken and planned to correct the violation and prevent recurrence is already adequately

-

'

'

addressed on the docket in inspection Report No. 50-277/98-09, 50-278/98-09 dated

- January 29,1999. Therefore, you are not required to respond to this letter unless the

description therein does not accurately reflect your corrective actions or your position. In that -

case, or if you choose to provide additional information, you should follow the instructions

specified in the enclosed Notice.

9902090250 990201

PDR

ADOCK 05000277

G

PDR

-

!

-

..

.

. -

--

. .

. .

-

.

_

_

__

.__

. _ _ . _ _ _ .

- _ _ _ . _ - _ . _ _

_ - - _ - . _ _ _ _ _

!.

.

,

.

G. Rainey

2

l

- We appreciate your cooperation.

Sincerely,

-

i

Wayne D. Lanning, Director

Division of Reactor Safety

Docket Nos.: 50-277,50-278

License Nos: NPF-39, NPF-85

i

Enclosures:

NRC Inspection Report 50-277/98-09,50-278/98-09

and Notice of Violation

cc w/encls:

J. Hagan, Vice President, Nuclear Station Support

J. Doering, Vice President, Peach Bottom Atomic Power Station

l

M. Wamer, Plant Manager, Peach Bottom Atomic Power Station

i

'

G. D. Edwards, Chairman, Nuclear Review Board

R. Boyce, Director, Nuclear Quality Assurance

i

A. F. Kirby, Ill, Extemal Operations - Delmarva Power & Light Co.

j

G. J. Lengyel, Manager, Experience Assessment

J. W. Durham, Sr., Senior Vice President and General Counsel

H. C. Kresge, Manager, Extemal Operations, Connectiv

N. J. Sproul, Manager, Financial Control & Co-Owner Affairs, Connectiv

R. McLean, Power Plant Siting, Nuclear Evaluations

D. Levin, Acting Secretary of Harford County Council

I

R. Ochs, Maryland Safe Energy Coalition

'

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance

Mr. & Mrs. Kip Adams

j

Commonwealth of Pennsylvania

State of Maryland

TMI - Alert (TMIA)

!

,

!

l

._

_

_

_ _ _

_

.

.

. __

.._.

. _ _ _

..

_ _ _ _ . _ .

.

.

3

Distribution w/ encl:

Region i Docket Room (with concurrences)

Nuclear Safety information Center (NSIC)

NRC Resident inspector

PUBLIC

H. Miller, RA/J. Wiggins, DRA (1)

W. Lanning, DRS

W. Ruland, DRS

J. Yerokun, DRS

A. Lohmeier, DRS

C. Cowgill, DRP

D. Florek, DRP

S. Barr, DRP

C. O'Daniell, DRP

DRS File

Distribution w/ encl: (Via E-Mail)

G. Shear, OEDO

W. Dean, PDI-2, NRR

inspection Program Branch, NRR (IPAS)

M. Thadani, NRR

B. Buckley, NRR

R. Correia, NRR

DOCDESK

.

DOCUMENT NAME: G:\\CMMEB\\LOHMEIER\\ LIM 9809. INS

"C" = Copy,h%gf'opy

wit

To receive a copy of this document, indicate in the box:

ppf

attachment / enclosure

"E" = Copy with attachment / enclosure

c

OFFICE

Rl/DRS

Rl/DRS

Rl/DRP fj Q

Rl/DRS

g

..

,,

,

,

l

NAME

Alohnyeier A//

GMeypr [,j, /

CAnderson ""

JWigginsLG /GR

DATE

12/wf98

$

01M/99 ~)l M/

01/p(/99

//qy/7f

'

l

\\

OFFICIAL fCORD COPY

L