February 1, 1999
"
a.
I
,
.
4-
~
Mr. G. Rainey, President
'
PECO Nuclear
'
j.
Nuclear Group Headquarters
Correspondence Control Desk
a
P. O. Box 195
l
Wayne, PA' 19087-0195
i
SUBJECT:
NRC ENGINEERING TEAM INSPECTION 50-277/98-09 AND 50-278/98-09
4
i
j
Dear Mr. Rainey:
j
This letter refers to the engineering team inspection conducted November 16 through
i
December 4,1998, at the Peach Bottom Atomic Power Station. The inspection evaluated the
i
effectiveness of the engineering organization in supporting safe operation of your facility. The
'
inspection focused on the reactor core isolation cooling and 4kV electrical distribution systems'
l
operation under normal and emergency operation conditions. The inspection also addressed
I
the performance of engineering in . support of the operations and maintenance functions, with
l
'
.
emphasis on problem identification and corrective action implementation, and plant safety
evaluations. The enclosed report provides the results of the inspection. The preliminary
-i
<
findings and conclusions were presented to Mr. Doering and others of your staff on
j
>
!
December 11,1998.
!
j.
- !
j
The team concluded that PECO provided effective engineering support to the station. In-depth
review of the reactor core isolation cooling (RCIC) and_4Kv electrical distribution systems
i
determined that both systems were operable and capable of performing their design basis
j
functions and that the analyses and procedures supporting these systems were generally
j'
. being identified, root causes determined, corrective actions taken, and results monitored in a
';
accurate. Also, based on several areas reviewed, the team concluded that plant problems are
!
generally effective manner.
!
Based on the results of this inspection, the NRC has determined that a violation of NRC
l
- requirements occurred. The violation is cited in the enclosed Notice of Violation, and the
circumstances surrounding it are described in detail in the subject inspection. The team found
)
two examples in which RCIC system design basis information was not properly translated into
/
procedures.
The NRC has concluded that information regarding the reason for the violation, the corrective
fqol :
100053
'
actions taken and planned to correct the violation and prevent recurrence is already adequately
-
'
'
addressed on the docket in inspection Report No. 50-277/98-09, 50-278/98-09 dated
- January 29,1999. Therefore, you are not required to respond to this letter unless the
description therein does not accurately reflect your corrective actions or your position. In that -
case, or if you choose to provide additional information, you should follow the instructions
specified in the enclosed Notice.
9902090250 990201
ADOCK 05000277
G
-
!
-
..
.
. -
--
. .
. .
-
.
_
_
__
.__
. _ _ . _ _ _ .
- _ _ _ . _ - _ . _ _
_ - - _ - . _ _ _ _ _
!.
.
,
.
G. Rainey
2
l
- We appreciate your cooperation.
Sincerely,
-
i
Wayne D. Lanning, Director
Division of Reactor Safety
Docket Nos.: 50-277,50-278
i
Enclosures:
NRC Inspection Report 50-277/98-09,50-278/98-09
cc w/encls:
J. Hagan, Vice President, Nuclear Station Support
J. Doering, Vice President, Peach Bottom Atomic Power Station
l
M. Wamer, Plant Manager, Peach Bottom Atomic Power Station
i
'
G. D. Edwards, Chairman, Nuclear Review Board
R. Boyce, Director, Nuclear Quality Assurance
i
A. F. Kirby, Ill, Extemal Operations - Delmarva Power & Light Co.
j
G. J. Lengyel, Manager, Experience Assessment
J. W. Durham, Sr., Senior Vice President and General Counsel
H. C. Kresge, Manager, Extemal Operations, Connectiv
N. J. Sproul, Manager, Financial Control & Co-Owner Affairs, Connectiv
R. McLean, Power Plant Siting, Nuclear Evaluations
D. Levin, Acting Secretary of Harford County Council
I
R. Ochs, Maryland Safe Energy Coalition
'
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance
Mr. & Mrs. Kip Adams
j
Commonwealth of Pennsylvania
State of Maryland
TMI - Alert (TMIA)
!
,
!
l
._
_
_
_ _ _
_
.
.
. __
.._.
. _ _ _
..
_ _ _ _ . _ .
.
.
3
Distribution w/ encl:
Region i Docket Room (with concurrences)
Nuclear Safety information Center (NSIC)
NRC Resident inspector
PUBLIC
H. Miller, RA/J. Wiggins, DRA (1)
W. Lanning, DRS
W. Ruland, DRS
J. Yerokun, DRS
A. Lohmeier, DRS
C. Cowgill, DRP
D. Florek, DRP
S. Barr, DRP
C. O'Daniell, DRP
DRS File
Distribution w/ encl: (Via E-Mail)
G. Shear, OEDO
W. Dean, PDI-2, NRR
inspection Program Branch, NRR (IPAS)
M. Thadani, NRR
B. Buckley, NRR
R. Correia, NRR
DOCDESK
.
DOCUMENT NAME: G:\\CMMEB\\LOHMEIER\\ LIM 9809. INS
"C" = Copy,h%gf'opy
wit
To receive a copy of this document, indicate in the box:
ppf
attachment / enclosure
"E" = Copy with attachment / enclosure
c
OFFICE
Rl/DRS
Rl/DRS
Rl/DRP fj Q
Rl/DRS
g
..
,,
,
,
l
NAME
Alohnyeier A//
GMeypr [,j, /
CAnderson ""
JWigginsLG /GR
DATE
12/wf98
$
01M/99 ~)l M/
01/p(/99
//qy/7f
'
l
\\
OFFICIAL fCORD COPY