Discusses GL 98-01 Y2K Readiness of Computer Sys at NPPs & Supplement 1 & PECO Response for PBAPS Dtd 990630. Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient During Y2K Transition
ML20212E866
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 09/22/1999
From: Buckley B
NRC (Affiliation Not Assigned)
To: Hutton J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
GL-98-01, TAC-MA1872, NUDOCS 9909270176
Download: ML20212E866 (4)


Text

s c ua p

1 UNITED STATES

r j

NUCLEAR REGULATORY COMMISSION t

WASHINGTON, D.C. 206M4001

          • ,o September 22, 1999 Mr. ' James A. Hutton Director - Licensing, MC 62A-1 l

PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No.195 l

Wayne, Pennsylvania 19085-0195

SUBJECT:

- PEACH BOTTOM ATOMIC POWER STATION, UNIT 3 - RESPONSE TO GENERIC LETTER 98-01, " YEAR 2000 READINESS OF COMPUTER SYSTEMS AT NUCLEAR POWER PLANTS" (TAC.NO. MA1872)

Dear Mr. Hutton:

In Generic Letter 98-01," Year 2000 Readiness of Computer Systems at Nuclear Power Plants" and its Supplement 1, we requested utilities to submit plans and schedules for resolving Y2K-related issues. We have received and reviewed alllicensees' corrective plans and schedules. Based on our review of licensee responses and our onsite assessment of licensee Y2K activities as described in NUREG-1706, " Year 2000 Readiness in U.S. Nuc' ear Power Plants," we have concluded that there are no nuclear plants with Y2K issues involving safety systems.

Increased public awareness and attention to the Y2K issue have resulted in concern over the ability of nuclear power plants to provide uninterrupted power to the national electric power grid during the Y2K transition, in this regard, we are focusing attention beyond those systems necessary to maintain safety. Consequently, we are closely monitoring those plants having Y2K deficiencies in systems that could impact plant operation that are not scheduled for remediation prior to September 30,1999. As you are aware, a Y2K deficiency in certain systems or components might cause a transient during the Y2K transition that could affect the I

national electric power grid.

In your letter of June 30,1999, for the Peach Bottom Atomic Power Station, Unit 3 (PBAPS 3),

you stated the following:

PBAPS 3 will not be Y2K ready until you make changes to the following systerp

a. Digital Feedwater System g
b. Turbine Vibration Monitor b5 O
c. 3D Monicore System

/ ID\\

You intend to make these system changes by the completion of the current PBAPS refueling outage on or about October 31,1999.

/

lt is our understanding that at least one of the systems, or components listed above, which are

)

currently not Y2K ready, may have the potential to cause a transient during the Y2K transition j

or be important to continued power operation at your facilny. The NRC considers it important to l

l 9909270176 990922 PDR ADOCK 05000278 P

PDR L

l J. Hutton September 22, 1999 or be important to continued power operation at your facility, The NRC considers it important to complete these Y2K remediation efforts in advance of the Y2K transition date. To efficiently schedule regional inspections to verify completion of the Y2K work, you are requested to inform the staff of any changes in (1) the scope of the Y2K system deficiencies listed above, or (2) your projected completion schedule. Please submit a letter documenting when work is complete.

We would like to acknowledge the efforts you have completed to date in preparing your plant for the Y2K transition and appreciate your continued cooperation on this important issue.

The collection of this iniormation is covered by OMB Clearance 3150-0012 which expires on June 30,2000. We estimate that the effort to collect this information and report back to us by l

l letter will take approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

i Please contact me at 301-415-1483 if you have any questions.

Sincerely, (Original signed by:]

Bartholomew C. Buckley, Senior Project Manager, Section 2 Project Directorate l Division of Licensing Project Management Office of Nuclear Reactor Regulation l

Docket No. 50-278 l

cc: See next page Distribution gnocket File EAdensam BBuckley MOprendek, RGN-l PUBLIC JClifford AHansen BStMary, OClO PDI-2 Reading File JCalvo PO'Brien OGC l

JZwolinski/SBlack DMcCain CCowgill, RGN-l ACRS DOCUMENT NAME: P:\\ LETTERS \\LTRa1872.wpd i

To RECEIVE A COPY OF THis DOCUMENT, INDICATE IN THE box: "C" = COPY WITHouT ENCLOSURES "E" = COPY WITH ENCLOSURES "N" = NO COPY OFFICE PDI-1/PM QA PDI-)Q j[

LPD2/PM [ Cj PDI-1/jid hO A Hansen[

JClkrd l

NAME BBuckley MO'Bri DATE 9/ ).,P /99 9/ Q f /99 9/ ' @ /99 9/ &7/ /99 OFFICIAL RECORD COPY l

l i

i

p r

(

J. Hutton September 22, 1999 or be important to continued power operation at your facility. The NRC considers it important to complete these Y2K remediation efforts in advance of the Y2K transition date. To efficiently schedule regional inspections to verify completion of the Y2K work, you are requested to inform i

- the staff of any changes in (1) the scope of the Y2K system deficiencies listed above, or (2) your projected completion schedule. Please submit a letter documenting when work is complete.

We would like to acknowledge the efforts you have completed to date in preparing your plant for the Y2K transition and appreciate your continued cooperation on this important issue.

The collection of this information is covered by OMB Clearance 3150-0012 which expires on June 30,2000. We estimate that the effort to collect this information and report back to us by letter will take approximately 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />.

- Please contact me at 301-415-1483 if you have any questions.

Sincerely,

[ Original signed by:]

1 Bartholomew C. Buckley, Senior Project Manager, Section 2 Project Directorate i Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-278 cc: See next page Distribution Docket File EAdensam BBuckley MOprendek, RGN-l PUBLIC JClifford AHansen BStMary, OClO PDI-2 Reading File JCalvo PO'Brien OGC JZwolinski/SBlack DMcCain CCowgill, RGN-l ACRS DOCUMENT NAME: P:\\ LETTERS \\LTRa1872.wpd TO RECElVE A COPY OF THIS DOCUMENT, INDICATE IN THE box: "C" = COPY WITHouT ENCLOSURES "E" = COPY WITH ENCLOSURES "N" = NO copy OFFICE PDl-1/PM @

PDI-J/)4j[

LPD2/PM

[Cj PDI-1/pd NAME BBuckley MOYsihO A Hansen[

JClkrd r

DATE 9/ 2,P /99 9/ Q f /99 9/ U /99 9/ L2/ /99 OFFidlAL RECORD COPY I

4 t'

Peach Bottom Atomic Power Station, Unit 3 cc:

J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company Board of Suprevisors ATTN: Mr. J. Doering, Vice President Peach Bottom Township Peach Bottom Atomic Power Station R. D. #1 1848 Lay Road Delta, PA 17314 Delta, PA 17314 Public Service Commission of PECO Energy Company Maryland ATTN: Regulatory Engineer, A4-SS Engineering Division Peach Bottom Atomic Power Station Chief Engineer Chief Engineer 6 St. Paul Center 1848 Lay Road Baltimore, MD 21202-6806

- Delta, PA 17314 Mr. Richard McLean Resident inspector Power Plant and Environmental U.S. Nuclear Regulatory Commission Review Division Peach Bottom Atomic Power Station Department of Natural Resources P.O. Box 399 B-3, Tawes State Office Building Delta, PA 17314 Annapolis, MD 21401 Regional Administrator, Region I Dr. Judith Johnsrud U.S. Nuclear Regulatory Commission National Energy Committee 475 Allendale Road Sierra Club King of Prussia, PA 19406 433 Orlando Avenue State College, PA 16803 Mr. Roland Fletcher Department of Environment Manager-Financial Control & Co-Owner 201 West Preston Street Affairs Baltimore, MD 21201 Public Service electric and Gas Company A. F. Kirby,111 P.O. Box 236 External Operations - Nuclear Hacocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Manager-Peach Bottom Licensing Wilmington, DE 19899 PECO Energy Company i

Nuclear Group Headquarters PECO Energy Company Correspondence Control Desk Plant Manager P.O. Box No.195 Peach Bottom Atomic Power Station Wayne, PA 19087-0195 1848 Lay Road Delta, PA 17314