IR 05000277/1990019

From kanterella
Jump to navigation Jump to search
Forwards Exam Repts 50-277/90-19OL & 50-278/90-19OL Administered During Wk of 900924
ML20062D825
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/07/1990
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20062D828 List:
References
NUDOCS 9011190059
Download: ML20062D825 (3)


Text

NOV 7W

!

Docket Nos.: .50-277 50-278 Fhi'adelphia Electric Company

.

'

ATTN: Mr. D.M. Smith

Senior.Vice President - Nuclear Nuclear. Group Headquarters Correspondence Control Desk P.O. Box 195 Wayne, Pennsylvania 19087-0195

, Gentlemen:

SUBJECT
' Examination Report Nos. 50-277/90-19,50-278/90-19(OL)

During the week of September 24, 1990, the NRC administered examinations t !

employees of your company who had applied for licenses to operate the Peach i Bottom _ Atomic Power Station Units 2 & 3. During the same week, a requalifi- l cation reexamination was also administered for two licensed operators who had !

failed a previous requalification examinatio At the conclusion of the examination, the written examination questions and

.

'

the. preliminary findings were discussed with those members of your staff

. identified in.the enclosed. repor On November 2, 1990, a meeting was conducted, at.the Region 1 Office, with a

member of your staff to discuss the examination results of a senior reactor u . operator upgrade candidate who did not successfully pass the initial exami-nation. At the conclusion of the meeting, it was agreed that the decision to resubmit his application for reexamination would not.be made until after November 22 '1990. . If,-at that time the decision is made to reactivate him as a reactor operator, his license activation would not,go into effect until

._ r6 viewed by the NRC staf \

' In accordance with 10 CFR ?.790 of the Commission's regulations, a copy of-this letter and its- enclosure will be placed in the NRC Public Document Roo Should you'have any questions regarding this examination, please contact  !

Richard Conte at (215) 337-521 '

Sincerel i s

..

l OrYginal Signed ByA

!

Lee H. Bettenhausen, Chief Operations Branch i Division of Reactor Safety i

  • "

0FFICIAL TECORD COPY EASLICK/PB'EX RPT/11/2/90 - 0001. .t107 PDR 11/02/90 ADOCK 050002'77 V

PDC D h-

'

,

R,

, ?

,

Philadelphia Electric Company 2 i Enclosure: ' Examination Report Nos. 50-277/90-19,50-278/90-19(0L)

' '

w/ Attachments 1, 2, 3, 4, 5, & 6 cc w/ encl.; w/o-Attachments-1, 2, 3, 4, 5, and 6:

-

D..R. Helwig, Vice President, Nuclear Engineering and Services R. J. Lees, Chairman, Nuclear Review Board D. B. Miller, Vice President, Peach Bottom Atomic Power Station J. Urban- General Manager, Fuels Department, Delmarva Power & Light C ,

A - . Fulvio, Regulatory Engineer, Peach Bottom Atomic Power Station E..P. Fogarty, Project Manager, Peach Bottom Atomic Power Station

_ T. B. Conner,= Jr. , Esquire S. B. Ungerer, Director, Joint Generation Projects Department,

.

, Atlantic Electric B. W. Gorman, Manager, External Affairs

.E. J. Cullen, Esquire, Assistant General Counsel (Without Report)

R.: Lc Hovis, Esquire R. McLean, Power Plant Siting, Nuclear Evaluations

--

G. A. Hunger, Jr. , Director, Licensing Section

.

D. Poulsen, Secretary of Harford County Council

J.;H. Walter, Chief Engineer, Public Service Commission of Maryland

- ,

cc w/ encl.-and Attachments'1, 2,-3, 4, 5, and 6:

iJ.-F. Franz, Plant Manager, Peach Bottom Atomi: Power Station-R. < Andrews, Training Manager L Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

.NRC Resident Inspector h

5 Commonwealth of Pennsylvania N Lbecw/ encl.;w/oAttachments.1,2,3,4,5;and6:

Region I Docket Room (with concurrences)

_ _Mana9 ament Assistant, DRMA (w/o encl.; w/o Attachments 1 6)

- Chief,: OLB, NRR

-

_ J. Caldwell, E00 G Suh, NRR-1R.:Bellamy,-DRSS

,

R. Blough,:DRP

,P.-Kaufman, DRP L. Doerflein.--DRP

".-

-

M. Miller, SLO'

.L- tiettenhausen, DRS F. Conte, DRS

-

T.' Easlick,-DRS T. Fish, Senior Operations- Engineer

_ y- . D.'NcNeil, Examiner,.RIII (ebserver)

B. Orton; PNL

-

OL Facriity File-T ' DRS Files .(5)

m 0FFICIAL RECORD COPY EASLICK/PB EX RPT/11/2/90 - 0001. /02/90

,

"

. __ . _ _ . _ - _ _ - _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

.,

,

,

y JN' t

., e

'

Yl Philadelphia Electric Company 3  ;

l

'>

.- bec'w/ enc 1. and Attachments:

Master Exam File _j bec w/ Executive Summary Only'  !

1W. Kane, ORP-  !

J..Wiggins, DRP ,

W. Hodges, DRS l

J. Durr, DRS .

L. Bettenhausen, DRS 1

.

M._Knapp, DRSS .

'

J. Lyash,. SRI-Peach ~ Bottom

- T. Kenny, SRI-Limerick B'. Norris, PI - Shoreham a-

-

W. Butler, NRR, i

,

d

)

J

.o

... -;

!

.i'

,

.

A i

,

i DRS:RI- . DRS:RI DRS:RI I-Eas11ck/dmg,

.

b ;Bettenhausen  !

& ffG q.- 11/02/90 1 790 ~. 11/ 7 /90

.

OFFICIAL RECORD COPY EASLICK/PB EX RPT/11/2/90 - 0002. ,

11/02/90

.(