IR 05000382/1987010

From kanterella
Revision as of 01:01, 21 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ack Receipt of 870707 Ltr Informing NRC of Actions Taken to Correct Violation Noted in Insp Rept 50-382/87-10.Info on Apparent Procedural or Programmatic Deficiency That Allowed Condition to Occur Requested within 30 Days
ML20236N625
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/24/1987
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
References
NUDOCS 8708120037
Download: ML20236N625 (2)


Text

- _ - - . - _ _ . . _ _ _

.c .,

In Reply Refer To: JUL 2 4 1987 Docket: 50-382/87-10 Louisiana Power & Light Company ATTN: J. G.. Dewease, Senior Vice President Nuclear Operations 317 Baronne Street P.O. Box 60340 New Orleans, Louisiana 70160 Gentlemen:

.Thank you for your letter of July 7,1987, in response to our letter and the  ;

attached Notice of Violation dated June 8, 1987. As a result of our review, we <

find that your response adequately addresses the failure to take corrective j action when this condition was identified by the NRC inspector, j As discussed with your Mr. G. E. Wuller on July 14, 1987, your response fails to address the deficiency that allowed Fire Penetration Seal III-A0-155 to be removed from service without initiating and/or maintaining the required Technical Specification fire watch surveillance. Please provide information on the apparent procedural or programmatic deficiency that allowed this condition to occu Please provide the supplemental information within 30 days of the date of this lette (

Sincerely, k

Eric H. Johnson, Director Division of Reactor Safety and Projects cc: ]

Louisiana Power & Light Company l ATTN: N. S. Carns, Plant Manager l P.O. Box B Killona, Louisiana 70066 Louisiana Power & Light Company 4 ATTN: K. W. Cook, Manager, Nuclear Safety & Regulatory Affairs

.317 Baronne Street ,

P. O. Box 60340 .

-

. _ . . _ . New Orleans. .Louisi3na 79'60 (cc cont'd rAxt pag 1) ,

RIV:RPB/A C:R A C:RFB \ r MESkow M JPJaudon EGagl'iardo 7/tJ/87 7/p/87 \7/ef,/87 g 9,

8708120037 870724 )

,

PDR ADOCK 0500030 g l G PDR

_ - _ _ _ _ _ _ _ _ _ ____-_________________-_______-_Y

.. ,

Louisiana Power &. Light Company :-2-cc cont'd:

Louisiana Power & Light Company ATTN: G. E. Wuller, Onsite:

Licensing Coordinator P. O. Box B Killona. Louisiana 70066 Middle South Services ATTN: Mr. R. T. Lally P. O. Box 6100 New Orleans, Louisiana 70161 Louisiana Radiation Control Program Director bec to DMB (IE01)

bec distrib. by RIV RPB D. Weiss, LFMB (AR-2015)

RRI R. D. Martin, RA Section Chief (RPB/A) DRSP R&SPB RSB MIS System Project Inspector (RPB/A)

RSTS Operator RIV File l

l

i l

,

j

,

_ . - _ _ _ _ _ _ - - _ _ - - ._._--___-__.______.______.-.J

- _ _ _ _ _ _ _ _ _ _ _

= ,.

I e

l

'

I LOUISI POWE R & ANA LiG HT/ 317NEWBARONNESTREET e P. O. BOX 60340 ORLEANS, LOUISlANA 70160 * (504) 595 3100 UIOi?Nsvs$

~

July 7, 1987

'

W3P87-1708 A4.05 QA l

U.S. Nuclear Regulatory Commission F3@10Mfa%f l .

c

~

j

,

'

~,

ATTN Document Control Desk glgg ,

-

Washington, D.C. 20555 t

\

,9

.

.n .

Subject: Waterford 3 SES -

Docket No. 50-382 License No. NPF-38 NRC Inspection Report 87-10 Attached is the Louisiana Power and Light Company (LP&L) response to Violation No. 8710-02 which is cited in the subject Inspection Repor If you have any questions on the response, please contact G.E. Wuller, Operational Licensing, at (504) 464-349 Very truly yours, K.W. Cook

-

Nuclear Safety and Regulatory Affairs Manager

j .

KWC:PTM:ssf .

Attachment ,

cc: K.D.' Martin,NRCRegionIV I l J.A. Calvo, NRC-NRR J.H. Wilson, NRC-NRR .*

NRC Resident Inspectors Office E.L. Blake W.M. Stevenson I

N \

g_gn f zoo a=no m e nw m m etoven" <>g0

'7

,

_ _ - _ _ _ _ _ .

.

4,, .

,

... Attachment to

W3P87-1708 Sheet 1 of 2

'n LP&L Response to Violation No. 8710-02 VIOLATION NO. 8710-02 Failure to Adhere to T.S. Required Action for Inoperable Fire Penetration Seal Technical Specification (TS) 3.7.11 requires, in part, that when fire. rated sealing devices separating safety-related fire areas are inoperable. within I hour, a continuous fire watch must be established on at least or.e side of the affected device, or the operability of the fire detectors on at least one side must be verified and an hourly fire watch patrol must be established. Fire Penetration Seal III-AO-155 is a fire-rated sealing device separating safety-related fire area Contrary to the above, prior to April 17, 1987, maintenance was performed

~( on Fire Penetration Seal III-AO-155 causing this seal to be in an inoperable condition. During the period of April 17 through May 1, 1987, no continuous fire watch was established or fire watch patrol tours performed for this inoperable sea This is a Severity Level IV violatio RESPONSE (1) Reason For The Violation The violation is attributed to the fact that an initial evaluation was conducted by personnel not familiar with fire seal installation and inspection practices who determined that the fire seal appeared to be operable. Upon followup by the NRC Inspector concerning the quality verification of the fire seal installation, a more detailed inspection was performed by the appropriate Plant Maintenance personnel. During this inspection it was determined that the fire seal was inoperabl (2) Corrective Action That Has Been Taken The fire seal in question (III A-0155) was evaluated on May 1, 1987 by Electrical Maint'enknee personnel at the direction of the Fire t Protection and Safety Department and'upon removal of the damming

!

material was determined to be degraded and therefore inoperabl CIWA-032865 was generated to rework the seal. Additionally, Fire Appliance Impairment Form 87-093 was initiated and an hourly firewatch patrol conducted per T.S. 3.7.11. The fire seal was subsequently repaired and dpciated operable on 5/8/87 at 1401 hour0.0162 days <br />0.389 hours <br />0.00232 weeks <br />5.330805e-4 months <br /> (3) Corrective Action To Be Taken

.

"

A meno will be issued to Operations and Maintenance personnel to ,

reemphasize the importance of ensuring that potential conditions l prohibited by TS or procedures are properly evaluated and reporte This will reinforce the practice that evaluations or inspections be conducted by personnel trained and familiar with the specific system or componen !

L - - - - - - ---------

- _ _ _ _ _ _ - _ - - _ _

,. - 6 .-

.

Attachment to

+

W3P87-1708 i Sheet 2 of 2 '

i n

' l (4) Date When Full Compliance Will Be Achieved The plant is presently in full compliance with Technical Specification 3.7.11. The above referenced instruction will be provided by Operations and Maintenance Department Management no later than July 31, 198 .

d'

. .

O e

f e

G

'