ML20217L042
| ML20217L042 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/21/1999 |
| From: | Harrell P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dugger C ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20217L047 | List: |
| References | |
| 50-382-99-20, NUDOCS 9910270054 | |
| Download: ML20217L042 (5) | |
See also: IR 05000382/1999020
Text
-
-
v
.
tP4
4,k
4
UNITED STATE 3
p
NUCLEAR REGULATORY-COMMICSION
y
i
g
REGION IV
g
[
611 RYAN PLAZA DRIVE, SUITE 400
g
ARLINGTON, TEKA8 76011-8064
...r
i
OCT 2 l 1999
Charles M. Dugger, Vice President
,
Operations - Waterford 3
Er tergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
SUBJECT: NRC INSPECTION REPORT NO. 50-382/99-20
Dear Mr. Dugger:
i
This refers to the inspection conducted on August 15 through September 25,1999, at the
Waterford Steam Electric Station, Unit 3, facility. The enclosed report presents the results of
this inspection.
Based on the results of this inspection, the NRC has determined that two Severity Level IV
violations of NRC requirements occurred. These violations are being treated as noncited
violations (NCVs), consistent with Appendix C of the Enforcement Policy. These NCVs are
described in the subject irespection report if you contest the violation or severity level of these
NCVs, you should provide a response within 30 days of the date of this inspection report, with
the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Cc.' trol
Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, U.S. Nuclear
Rogulatory Commission, Region IV,611 Ryan Plaza Drive, Suite 400, Arlington, Texas 76011,
the Director, Office of Enforcement, United States Nuclear Regulatory Commission,
Washington, DC 20555-0001, and the NRC Resident inspector at the Waterford Stearn Electric
Station, Unit 3, facility.
In accordance with 10 CFR 2.790 of h NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response, if requested, will be placed ir, the NRC Public Document
Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
I
i
.
P
. Harrell, Chief
ro ct Branch D
(
!
l
Divi 'on of Reactor Projects
Docket No.:
50-382
License No.: NPF-38
l
!
'
9910270054 991021
ADOCK 0500CG82
!
G
!
-
d
.
_
.
.. .
. .
.
-
.
-
Entergy Operations, Inc.
-2-
Enclosure:
NRC Inspection Report No.
50-382/99-20
c.J w/ enclosure:
Executive Vice President and
Chief Operating Officer
Entergy Operations, Inc.
P.O. Box 31995
Jackson', Mississippi' 39286-1995'
!
Vice Presiderit, Operations Support
Entergy Operations, Inc.
P.O. Box 31995 -
Jackson, Mississippi 39286-1995
. Wise, Carter, Child & Caraway
' P.O. Box 651
Jackson, Mississippi 39205
General Manager, Plant Operations
Wt.terford 3 SES
Eatergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
Manager - Licensing Manager
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
Chairman
Louisiana Public Service Commission -
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
Director, Nuclear Safety &
Regulatory Affairs
Waterford 3 SES
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
' Ronald Wascom, Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884 2135
. . .
.
. .
.
.
y
Entergy Operations,'inc.
-3-
Parish President -
St. Charles Parish
- P.O. Box 302
Hahnville, Louisiana 70057
Winston & Strawn .
1400 L Street, N.W.
Washington, D.C. 20005-3502"-
/
f
k'
. .
.
.
.
_ _ _ _ _ _ _ _ . _
1
1
.
OCT 2 I I?)9
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
j
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
,
.
bcc distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
RIV File
DRS Director
RITS Coordinator
Branch Chief (DRP/D)
Project Engineer (DRP/D)
Branch Chief (DRP/TSS)
i
i
-
1
DOCUMENT NAME: R:\\_WAT\\WT916RP.TRF
To recelyesopy of depument, Indicap in bk "C" = Copy without enclosures "E" = Copy with enclosures *N" = No copy
'
RI / \\ '.
- sg4 S N/m M[
C:DF3F7D)
lo
JKeetdg VJC
8 Molt &
PH4rre ! /AM
10M998/
09h29/9F@
/ 16d99
~
f
/
\\
\\ OFFICIAL
RDCOPY
/
2'!1006
m
.
OCT 21 1999
Entergy Operations, Inc.
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E Mail report to Frank Talbot (FXT)
bec to DCD (lE01)
bec distrib, by RIV:
Regional Administrator
Resident inspector
DRP Director
RIV File
DRS Director
RITS Coordinator
Branch Chief (DRP/D)
Project Engineer (DRP/D)
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:\\_WAT\\WT916RP.TRF
s
To recelyttopy of depument, Indice$ in b4i% "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
l
RI / \\ (
4 S/l[/ Jh/
C:DF//D1
in
l
I
JKeetdn V ,&C
/MoltzP
PHdrrell / A Z/
09h29/9KV
/ )Dd99
'
1Q M998/
ll
\\
\\ OFFICIAL
RDtOPY
7
-