Annual Assessment Letter - Waterford Steam Electric Station, Unit 3 (Report 05000382-10-001)
ML100621253
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/03/2010
From: Chamberlain D
NRC/RGN-IV/DRP
To: Kowalewski J
Entergy Operations
References
IR-10-001
Download: ML100621253 (9)


Text

March 3, 2010

SUBJECT:

ANNUAL ASSESSMENT LETTER - WATERFORD STEAM ELECTRIC STATION, UNIT 3 (REPORT 05000382/2010001)

Dear Mr. Kowalewski,

On February 16, 2010, the NRC staff completed its performance review of the Waterford Steam Electric Station, Unit 3. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2009.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only--Security Information" will include the security cornerstone review and resultant inspection plan.

Overall, the Waterford Steam Electric Station, Unit 3 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Regulatory Response column of the NRC=s Action Matrix, based on one White finding in the Mitigating Systems cornerstone. The finding involved the failure to follow plant procedures which led to the inoperability of the train B 125 Vdc battery.

On January 14, 2010, we were notified by your staff of your intent to be ready for the NRC to conduct a supplemental inspection in April of this year to review the actions taken to address the finding involving the failure to follow plant procedures which led to the inoperability of the train B 125 Vdc battery. Therefore, we plan to conduct a supplemental inspection at the Waterford Steam Electric Station, Unit 3, using inspection procedure 95001, Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area, beginning on April 12, 2010.

In our mid-cycle assessment letter dated September 1, 2009, we advised you of a substantive cross-cutting theme in the area of problem identification and resolution, specifically in the area involving the thoroughness of problem evaluation P.1(c). However, due to the recent nature of this performance trend and the fact that you had placed this into your corrective action program and were developing plans to address the theme, the staff did not identify a substantive

Entergy Operations, Inc.

- 2 -

crosscutting issue in this area. During this assessment period, we monitored the effectiveness of your corrective actions. We found these actions to have been appropriate in that only one finding with this theme was identified during the last six months of this assessment period.

The enclosed inspection plan details the inspections, less those related to security scheduled through June 30, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. Jeff Clark, Chief, Project Branch E at (817) 860-8147 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Dwight D. Chamberlain, Director Division of Reactor Projects

Docket Nos. 50-382 License Nos. NPF-38

Enclosure:

Waterford Steam Electric Station, Unit 3 Inspection/ Activity Plan

Entergy Operations, Inc.

- 3 -

John T. Herron Entergy Services, Inc.

President and CEO Nuclear Operations/CNO P.O. Box 31995 Jackson, MS 39286-1995

Jeff Forbes Senior Vice President and Chief Operating Officer Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995

Thomas Palmisano Vice President, Oversight Entergy Operations, Inc.

P. O. Box 31995 Jackson, MS 39286-1995

Senior Manager, Nuclear Safety and Licensing Entergy Services, Inc.

P. O. Box 31995 Jackson, MS 39286-1995

Bob Murillo Manager, Licensing and Regulatory Affairs Entergy Operations, Inc.

Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751

Kenny J. Christian, Director Nuclear Safety Assurance Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

Terence A. Burke Associate General Council Nuclear Entergy Services, Inc.

1340 Echelon Parkway Jackson, MS 39213

Entergy Operations, Inc.

- 4 -

Charles F. Arnone General Manager, Plant Operations Waterford 3 SES Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

Manager, Licensing Entergy Operations, Inc.

17265 River Road Killona, LA 70057-0751

Chairman Louisiana Public Service Commission P. O. Box 91154 Baton Rouge, LA 70821-9154

Parish President Council St. Charles Parish P. O. Box 302 Hahnville, LA 70057

St. Charles Parish Dept. of Emergency Preparedness Emergency Operations Center P.O. Box 302 Hahnville, LA 70057

Director, Nuclear Safety & Licensing Entergy, Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

Ms. Ji Wiley Environmental Scientist Supervisor Radiological Emergency Planning and Response P. O. Box 4312 Baton Rouge, LA 70821-4312

Chief, Technological Hazards Branch FEMA Region VI 800 North Loop 288 Federal Regional Center Denton, TX 76209

Entergy Operations, Inc.

- 5 -

Federal Emergency Management Agency Regional Director. Region VI FRC 800 North Loop 288 Denton, TX 76209-3698

Acting Director Louisiana Office of Homeland Security and Emergency Preparedness 7667 Independence Blvd.

Baton Rouge, LA 70806

Division Administrator Emergency and Radiological Services Division Louisiana Department of Environmental Quality P.O. Box 4312 Baton Rouge, LA 70821-4312

Parish President St. Charles Parish P.O. Box 302 Hahnville, LA 70057

Sheriff St. Charles Parish Sheriff=s Office P.O. Box 7 Hahnville, LA 70057

Rep. Gary L. Smith, Jr.

State of Louisiana, District 56 9 Apple Street P.O. Box 189 Norco, LA 70079

Rep. Ernest D. Wooten State of Louisiana, District 105 8018 Highway 23, Suite 214 Belle Chasse, LA 70037

Senator State of Louisiana, District 19 P.O. Box 1255 Destrehan, LA 70047

Director St. Charles Parish Department of Emergency Preparedness P.O. Box 302 Hahnville, LA 70057

Entergy Operations, Inc.

- 6 -

Councilman-at-Large St. Charles Parish Division A 660 Pine Street Norco, LA 70079

Councilman-at-Large St. Charles Parish Division B 140 North Oak Court P.O. Box 1342 Luling, LA 70070

Councilman St. Charles Parish District 1 P.O. Box 111 Hahnville, LA 70057

Councilman St. Charles Parish District 2 322 Beaupre Drive Luling, LA 70070

Councilman St. Charles Parish District 3 13 Hermitage Court Destrehan, LA 70047

Councilman St. Charles Parish District 4 P.O. Box 721 Des Allemands, LA 70030

Councilwoman St. Charles Parish District 5 162 Oak Manor Lane St. Rose, LA 70087

Councilman St. Charles Parish District 6 401 Oak Street Norco, LA 70079

Councilman St. Charles Parish District 7 337 Wanda Street Luling, LA 70070

Entergy Operations, Inc.

- 7 -

Parish President St. John the Baptist Parish 1801 West Airline Highway LaPlace, LA 70068

Public Safety Director St. John the Baptist Parish 1801 W. Airline Highway LaPlace, LA 70068

Sheriff St. John the Baptist Parish P.O. Box 1600 LaPlace, LA 70068

Entergy Operations, Inc.

- 8 -

Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.goV)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Branch Chief, DRP/E (Jeff.Clark@nrc.gov)

Senior Project Engineer, DRP/E (Ray.Azua@nrc.gov)

Senior Resident Inspector (Shane.Sandal@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

RA Administrative Assistant (Lucy.Owen@nrc.gov)

DRA Administrative Assistant (Anita Tannenbaum@nrc.gov)

Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)

Branch Chief, DRS/EB2 (Neil.OKeefe@nrc.gov)

Branch Chief, DRS/PSB1 (Michael.Shannon@nrc.gov)

Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)

Branch Chief, DRS/OB (Mark.Haire@nrc.gov)

OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)

Director, DIRS, NRR (Frederick.Brown@nrc.gov)

Director, DORL, NRR (Joseph.Giitter@nrc.gov)

Deputy Director, DORL, NRR (Robert.Nelson@nrc.gov)

Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)

NRR Project Manager (Kaly.Kalyanam@nrc.gov)

RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov Congressional Affairs Officer (Jenny.Weil@nrc.gov)

mortensengk@INPO.org

R:\\_REACTORS\\EOC2009\\WAT.doc SUNSI Rev Compl.

Yes No ADAMS
Yes No Reviewer Initials JAC Publicly Avail
Yes No Sensitive Yes : No Sens. Type Initials JAC C:DRP/PBE D:DRS D:DRP

JAClark RJCaniano DDChamberlain

/RA/RAzua for

/RA/

/RA/

2/28/10 3/2/10 3/2/10

OFFICIAL RECORD COPY

T=Telephone E=E-mail

F=Fax

Inspection / Activity Plan Page 1 of 1 02/18/2010 10:38:10 Report 22 04/01/2010 - 06/30/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Waterford TSB-52B

- BIENNIAL PI&R

3 IP Identification and Resolution of Problems 71152B 05/10/2010 05/14/2010

IP Identification and Resolution of Problems 71152B 05/24/2010 05/28/2010 RS45

- OCCUPATIONAL RADIATION SAFETY

3 IP Occupational Dose Assessment 71124.04 06/07/2010 06/11/2010

IP Radiation Monitoring Instrumentation 71124.05 06/07/2010 06/11/2010

IP Occupational Exposure Control Effectiveness 71151-OR01 06/07/2010 06/11/2010

IP RETS/ODCM Radiological Effluent 71151-PR01 06/07/2010 06/11/2010 EP-1

- BIENNIAL EP PROGRAM INSPECTION

3 IP Radiological Environmental Monitoring Program 7111402 06/28/2010 07/02/2010

IP Emergency Response Organization Augmentation Testing 7111403 06/28/2010 07/02/2010

IP Emergency Action Level and Emergency Plan Changes 7111404 06/28/2010 07/02/2010

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 06/28/2010 07/02/2010

IP Drill/Exercise Performance 71151-EP01 06/28/2010 07/02/2010

IP ERO Drill Participation 71151-EP02 06/28/2010 07/02/2010

IP Alert & Notification System 71151-EP03 06/28/2010 07/02/2010 EXAM

- INITIAL EXAM

3 INITIAL EXAM-W3 (10/2010)

X02447 08/30/2010 09/03/2010

INITIAL EXAM-W3 (10/2010)

X02447 10/04/2010 10/08/2010 RS123

- OCCUPATIONAL RADIATION SAFETY

3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 11/15/2010 11/19/2010

IP Occupational ALARA Planning and Controls 71124.02 11/15/2010 11/19/2010

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 11/15/2010 11/19/2010

IP Occupational Exposure Control Effectiveness 71151-OR01 11/15/2010 11/19/2010

IP RETS/ODCM Radiological Effluent 71151-PR01 11/15/2010 11/19/2010 PSB2-08P

- INSERVICE INSPECTION

3 IP Inservice Inspection Activities - PWR 7111108P 04/04/2011 04/29/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.